945 resultados para Project implementation


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background: Pharmaceutical care services became recognized in New Zealand in the mid-1990s, albeit with limited evidence of the acceptability and effectiveness of the model. An asthma-specific pharmaceutical care service was trialled in southern New Zealand, based on a 'problem-action-outcome' method, with pharmacists adopting a patient-centred, outcome-focused approach with multidisciplinary consultation. Objective: To report on the implementation and outcomes of a specialist asthma service offered by community pharmacists. Design: Pharmacists in five pharmacies, servicing predominantly rural, established clientele, received training in the asthma service and research documentation. Ten patients per pharmacy were recruited in each year (years 1 and 2) of the study. The patients were entered into the study in cohorts of five per pharmacy twice yearly, with year 2 mirroring year 1. The phase-in design minimized the impact on the pharmacists. The patients acted as their own controls. All patients received individualized care and had approximately monthly consultations with the pharmacist, with clinical and quality of life (QoL) monitoring. Results: A total of 100 patients were recruited. On average, 4.3 medication-related problems were identified per patient; two-thirds of them were compliance-related. The most common interventions were revision of patients' asthma action plans, referral and medication counselling. Clinical outcomes included reduced bronchodilator use and improved symptom control in around two-thirds of patients. Asthma-specific QoL changes were more positive and correlated well with clinical indicators. Conclusion: Further research is warranted to integrate this service into daily practice. Clinical outcomes were generally positive and supported by QoL indicators. Characteristics of New Zealand practice and this sample of pharmacies may limit the generalizability of these findings.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper describes the use of a web-site for the dissemination of the community-based '10,000 steps' program which was originally developed and evaluated in Rockhampton, Queensland in 2001-2003. The website provides information and interactive activities for individuals, and promotes resources and programs for health promotion professionals. The dissemination activity was assessed in terms of program adoption and implementation. In a 2-year period (May 2004-March 2006) more than 18,000 people registered as users of the web-site (togging more than 8.5 billion steps) and almost 100 workplaces and 13 communities implemented aspects of the 10,000 steps program. These data support the use of the internet as an effective means of disseminating ideas and resources beyond the geographical borders of the original project. Following this preliminary dissemination, there remains a need for the systematic study of different dissemination strategies, so that evidence-based physical activity programs can be translated into more widespread public health practice. (c) 2006 Sports Medicine Australia. Published by Elsevier Ltd. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Because organizations are making large investments in Information systems (IS), efficient IS project management has been found critical to success. This study examines how the use of incentives can improve the project success. Agency theory is used to: identify motivational factors of project success, help the IS owners to understand to what extent management incentives can improve IS development and implementation (ISD/I). The outcomes will help practitioners and researchers to build on theoretical model of project management elements which lead to project success. Given the principal-agent nature of most significant scale of IS development, insights that will allow for greater alignment of the agent’s goals with those of the principal through incentive contracts, will serve to make ISD/I both more efficient and more effective, leading to more successful IS projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Public policy becomes managerial practice through a process of implementation. There is an established literature within Implementation Studies which explains the variables and some of the processes involved in implementation, but less attention has been focused upon how public service managers convert new policy initiatives into practice. The research proposes that managers and their organisations have to go through a process of learning in order to achieve the implementation of public policy. Data was collected over a five year period from four case studies of capital investment appraisal in the British National Health Service. Further data was collected from taped interviews by key actors within the case studies. The findings suggest that managers do learn to implement policy and four factors are important in this learning process. These are; (i) the nature of bureaucratic responsibility; (ii) the motivation of actors towards learning; (iii) the passage of time which allows for the development of competence and (iv) the use of project team structures. The research has demonstrated that the conversion of policy into practice occurs through the operationalisation of solutions to policy problems via job tasks. As such it suggests that in understanding how policy is implemented, technical learning is more important than cultural learning, in this context. In conclusion, a "Model of Learned Implementation" is presented, together with a discussion of some of the implications of the research. These are the possible use of more pilot projects for new policy initiatives and the more systematic diffusion of knowledge about implementation solutions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The evaluation and selection of industrial projects before investment decision is customarily done using marketing, technical and financial information. Subsequently, environmental impact assessment and social impact assessment are carried out mainly to satisfy the statutory agencies. Because of stricter environment regulations in developed and developing countries, quite often impact assessment suggests alternate sites, technologies, designs, and implementation methods as mitigating measures. This causes considerable delay to complete project feasibility analysis and selection as complete analysis requires to be taken up again and again till the statutory regulatory authority approves the project. Moreover, project analysis through above process often results sub-optimal project as financial analysis may eliminate better options, as more environment friendly alternative will always be cost intensive. In this circumstance, this study proposes a decision support system, which analyses projects with respect to market, technicalities, and social and environmental impact in an integrated framework using analytic hierarchy process, a multiple-attribute decision-making technique. This not only reduces duration of project evaluation and selection, but also helps select optimal project for the organization for sustainable development. The entire methodology has been applied to a cross-country oil pipeline project in India and its effectiveness has been demonstrated. © 2005 Elsevier B.V. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of this paper is to investigate the reasons of social impacts of projects in developing countries despite of thorough impact assessment in appraisal phase of projects. A case study approach on a sewerage project in Barbados was undertaken using primary and secondary information. The study reveals that although the impact assessment report suggested appropriate mitigation measures, but they were not implemented by the contractors. The study suggests fostering an interconnected and symbiotic relationship between appraisal and implementation phases of a project in order to manage project environment. Additionally, a more vigilant and proactive supervisory role should be instituted and strengthened over time and adapted within the dictates of environmental needs. Copyright © 2005 Inderscience Enterprises Ltd.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The evaluation and selection of industrial projects before investment decision is customarily done using marketing, technical, and financial information. Subsequently, environmental impact assessment and social impact assessment are carried out mainly to satisfy the statutory agencies. Because of stricter environment regulations in developed and developing countries, quite often impact assessment suggests alternate sites, technologies, designs, and implementation methods as mitigating measures. This causes considerable delay to complete project feasibility analysis and selection as complete analysis requires to be taken up again and again until the statutory regulatory authority approves the project. Moreover, project analysis through the above process often results in suboptimal projects as financial analysis may eliminate better options as more environment friendly alternative will always be cost intensive. In this circumstance, this study proposes a decision support system which analyses projects with respect to market, technicalities, and social and environmental impact in an integrated framework using analytic hierarchy process, a multiple attribute decision-making technique. This not only reduces duration of project evaluation and selection, but also helps select an optimal project for the organization for sustainable development. The entire methodology has been applied to a cross-country oil pipeline project in India and its effectiveness has been demonstrated. © 2008, IGI Global.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report investigates why a nationally important and internationally funded infrastructural project within the Caribbean island of Barbados — The South Coast Sewerage Project — spurned a substantial level of negative socio-economic externalities. Primary and secondary research evaluated the presence or effectiveness of social impact assessment as a mitigation tool. The mitigation measures suggested within the appraisal report appear to have been considered by the Project Execution Unit (PEU) of Government of Barbados. The primary obstacle seems to have been the implementation of the mitigation process by the contractor. This highlights the need to foster an interconnected and symbiotic relationship between appraisal and implementation, if an initiative is to be conducted efficiently and effectively. Additionally, the South Coast Sewerage Project exemplifies the importance of establishing and sustaining a monitoring/control mechanism as an integral part of project construction.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Feasibility studies of industrial projects consist of multiple analyses carried out sequentially. This is time consuming and each analysis screens out alternatives based solely on the merits of that analysis. In cross-country petroleum pipeline project selection, market analysis determines throughput requirement and supply and demand points. Technical analysis identifies technological options and alternatives for pipe-line routes. Economic and financial analysis derive the least-cost option. The impact assessment addresses environmental issues. The impact assessment often suggests alternative sites, routes, technologies, and/or implementation methodology, necessitating revision of technical and financial analysis. This report suggests an integrated approach to feasibility analysis presented as a case application of a cross-country petroleum pipeline project in India.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Conventional project management techniques are not always sufficient to ensure time, cost and quality achievement of large-scale construction projects due to complexity in planning, design and implementation processes. The main reasons for project non-achievement are changes in scope and design, changes in government policies and regulations, unforeseen inflation, underestimation and improper estimation. Projects that are exposed to such an uncertain environment can be effectively managed with the application of risk management throughout the project's life cycle. However, the effectiveness of risk management depends on the technique through which the effects of risk factors are analysed/quantified. This study proposes the Analytic Hierarchy Process (AHP), a multiple attribute decision making technique, as a tool for risk analysis because it can handle subjective as well as objective factors in a decision model that are conflicting in nature. This provides a decision support system (DSS) to project management for making the right decision at the right time for ensuring project success in line with organisation policy, project objectives and a competitive business environment. The whole methodology is explained through a case application of a cross-country petroleum pipeline project in India and its effectiveness in project management is demonstrated.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Healthcare professionals routinely deploy various quality management tools and techniques in order to improve performance of healthcare delivery. However, they are characterised by fragmented approach i.e., they are not linked with the strategic intent of the organisation. This study introduces a holistic quality improvement method, which integrates all quality improvement projects with the strategic intent of the healthcare organisations. It first identifies a healthcare system and its environment. The Strengths, Weaknesses, Opportunities and Threats (SWOT) of the system are then derived with the involvement of the concerned stakeholders. This leads to developing the strategies in order to satisfy customers in line with the organisation's competitive position. These strategies help identify a few projects, the implementation of which ensures achievement of desired quality. The projects are then prioritised with the involvement of the concerned stakeholders and implemented in order to improve the system performance. The effectiveness of the method has been demonstrated using a case study of an intensive care unit at the Eric Williams Medical Sciences Complex Hospital in Trinidad. Copyright © 2007 Inderscience Enterprises Ltd.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This study highlights the variables associated with the implementation of renewable energy (RE) projects for sustainable development in India, by using an interpretive structural modeling (ISM) - based approach to model variables' interactions, which impact RE adoption. These variables have been categorized under enablers that help to enhance implementation of RE projects for sustainable development. A major finding is that public awareness regarding RE for sustainable development is a very significant enabler. For successful implementation of RE projects, it has been observed that top management should focus on improving highdriving power enablers (leadership, strategic planning, public awareness, management commitment, availability of finance, government support, and support from interest groups).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In construction projects, the aim of project control is to ensure projects finish on time, within budget, and achieve other project objectives. During the last few decades, numerous project control methods have been developed and adopted by project managers in practice. However, many existing methods focus on describing what the processes and tasks of project control are; not on how these tasks should be conducted. There is also a potential gap between principles that underly these methods and project control practice. As a result, time and cost overruns are still common in construction projects, partly attributable to deficiencies of existing project control methods and difficulties in implementing them. This paper describes a new project cost and time control model, the project control and inhibiting factors management (PCIM) model, developed through a study involving extensive interaction with construction practitioners in the UK, which better reflects the real needs of project managers. A set of good practice checklist is also developed to facilitate implementation of the model. © 2013 American Society of Civil Engineers.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background: The Respiratory Health Network in Western Australia developed the Asthma Model of Care in 2010 which incorporates best practice guidelines. At the same time short-acting beta agonist guidelines (SABA) were developed by stakeholder consensus at University of Western Australia (UWA) and incorporated the use of an Asthma Action Plan Card. Objective: To report on the implementation of a key component of the WA Asthma Model of Care, the SABA guidelines that incorporate the Asthma Action Plan card. Methods: Implementation strategies included lectures, direct pharmacy detailing, media releases, and information packs (postal and electronic). Groups targeted included pharmacists, consumers and medical practitioners. Results: State-based (n=18) and national (n=6) professional organisations were informed about the launch of the guidelines into practice in WA. In the four-month implementation period more than 47,000 Asthma Action Plan Cards were distributed, primarily to community pharmacies. More than 500 pharmacies were provided with information packs or individual detailing. More than 10,000 consumers were provided with information about the guidelines. Conclusions and implications: The collaboration of stakeholders in this project allowed for widespread access to various portals which, in turn, resulted in a multifaceted approach in disseminating information. Ongoing maintenance programs are required to sustain and build on the momentum of the implementation program and to ultimately address patient outcomes and practice change, which would be the longer-term goals of such a project. Future research will seek to ascertain the impact of the card on patient outcomes in WA.