869 resultados para NETWORK DESIGN PROBLEMS
Resumo:
A major determinant of the level of effective natural gas supply is the ease to feed customers, minimizing system total costs. The aim of this work is the study of the right number of Gas Supply Units – GSUs - and their optimal location in a gas network. This paper suggests a GSU location heuristic, based on Lagrangean relaxation techniques. The heuristic is tested on the Iberian natural gas network, a system modelized with 65 demand nodes, linked by physical and virtual pipelines. Lagrangean heuristic results along with the allocation of loads to gas sources are presented, using a 2015 forecast gas demand scenario.
Resumo:
One of the most difficult problems that face researchers experimenting with complex systems in real world applications is the Facility Layout Design Problem. It relies with the design and location of production lines, machinery and equipment, inventory storage and shipping facilities. In this work it is intended to address this problem through the use of Constraint Logic Programming (CLP) technology. The use of Genetic Algorithms (GA) as optimisation technique in CLP environment is also an issue addressed. The approach aims the implementation of genetic algorithm operators following the CLP paradigm.
Resumo:
Urban Computing (UrC) provides users with the situation-proper information by considering context of users, devices, and social and physical environment in urban life. With social network services, UrC makes it possible for people with common interests to organize a virtual-society through exchange of context information among them. In these cases, people and personal devices are vulnerable to fake and misleading context information which is transferred from unauthorized and unauthenticated servers by attackers. So called smart devices which run automatically on some context events are more vulnerable if they are not prepared for attacks. In this paper, we illustrate some UrC service scenarios, and show important context information, possible threats, protection method, and secure context management for people.
Resumo:
OBJECTIVE: To extend an existing computer programme for the evaluation and design of shift schedules (BASS 3) by integrating workload as well as economic aspects. METHODS: The redesigned prototype BASS 4 includes a new module with a suitable and easily applicable screening method (EBA) for the assessment of the intensity of physical, emotional and cognitive workload components and their temporal patterns. Specified criterion functions based on these ratings allow for an adjustment of shift and rest duration according to the intensity of physical and mental workload. Furthermore, with regard to interactive effects both workload and temporal conditions, e.g. time of day, are taken into account. In a second new module, important economic aspects and criteria have been implemented. Different ergonomic solutions for scheduling problems can now also be evaluated with regard to their economic costs. RESULTS: The new version of the computer programme (BASS 4) can now simultaneously take into account numerous ergonomic, legal, agreed and economic criteria for the design and evaluation of working hours. CONCLUSIONS: BASS 4 can now be used as an instrument for the design and the evaluation of working hours with regard to legal, ergonomic and economic aspects at the shop floor as well as in administrative (e.g. health and safety inspection) and research problems.
Resumo:
Mestrado em Engenharia Electrotécnica e de Computadores
Resumo:
Finding the structure of a confined liquid crystal is a difficult task since both the density and order parameter profiles are nonuniform. Starting from a microscopic model and density-functional theory, one has to either (i) solve a nonlinear, integral Euler-Lagrange equation, or (ii) perform a direct multidimensional free energy minimization. The traditional implementations of both approaches are computationally expensive and plagued with convergence problems. Here, as an alternative, we introduce an unsupervised variant of the multilayer perceptron (MLP) artificial neural network for minimizing the free energy of a fluid of hard nonspherical particles confined between planar substrates of variable penetrability. We then test our algorithm by comparing its results for the structure (density-orientation profiles) and equilibrium free energy with those obtained by standard iterative solution of the Euler-Lagrange equations and with Monte Carlo simulation results. Very good agreement is found and the MLP method proves competitively fast, flexible, and refinable. Furthermore, it can be readily generalized to the richer experimental patterned-substrate geometries that are now experimentally realizable but very problematic to conventional theoretical treatments.
Resumo:
Este trabalho é baseado no simulador de redes PST2200 do Laboratório de Sistemas de Energia (LSE) pois está avariado com vários problemas conhecidos, designadamente: - Defeito de isolamento (disparo de diferencial), - Desregulação da velocidade da máquina primária (motor DC), - Circuito de excitação da máquina síncrona inoperacional, - Inexistência de esquemas elétricos dos circuitos do simulador, - Medidas desreguladas e com canais de medida com circuito impresso queimado. O trabalho executado foi: - O levantamento e desenho de raiz (não existe qualquer manual) dos esquemas dos 10 módulos do simulador, designadamente naqueles com avaria ou com desempenho problemático a fim de que se possa ter uma visão mais pormenorizada dos circuitos e seus problemas, por forma a intervir para os minimizar e resolver, - Foi realizado o diagnóstico de avaria do simulador e foram propostas soluções para os mesmos, - Realizaram-se as intervenções propostas e aprovadas. Nas intervenções realizadas, os princípios orientadores foram: - Aumentar a robustez do equipamento por forma a garantir a sua integridade a utilizações menos apropriados e manobras 'exóticas' próprias de alunos, que pela sua condição, estão em fase de aprendizagem, - Atualizar o equipamento, colocando-o em sintonia com o 'estado da arte', - Como fator de valorização suplementar, foi concebida e aplicada a supervisão remota do funcionamento do simulador através da rede informática. Foram detetados inúmeros erros: - Má ligação do motor de corrente continua ao variador, resultando a falta de controlo da frequência da rede do sistema, - Ligações entre painéis trocadas resultando em avarias diversas das fontes de alimentação, - Cartas eletrónicas de medidas avariadas e que além de se reparar, foram também calibradas. Devido ao mecenato da empresa Schnitt + Sohn participando monetariamente, fez-se o projeto de alteração e respetiva execução de grande parte do simulador aumentando a fiabilidade do mesmo, diminuindo assim a frequência das avarias naturais mais as que acontecem involuntariamente devido a este ser um instrumento didático. Além do trabalho elétrico, foi feito muito trabalho de chaparia para alteração de estrutura e suporte do material com diferenças de posicionamento. Neste trabalho dá-se também alguns exemplos de cálculo e simulação das redes de transporte que se pode efetuar no simulador como estudo e simulação de avarias num sistema produtivo real. Realizou-se a monitorização de dois aparelhos indicadores de parâmetros de energia (Janitza UMG96S) através duma rede com dois protocolos ethernet e profibus utilizando o plc (Omron CJ2M) como valorização do trabalho.
Resumo:
Dissertação apresentada à Escola Superior de Comunicação Social como parte dos requisitos para obtenção de grau de mestre em Audiovisual e Multimédia.
Resumo:
PROFIBUS is an international standard (IEC 61158) for factory-floor communications, with some hundreds of thousands of world-wide installations. However, it does not include any wireless capabilities. In this paper we propose a hybrid wired/wireless PROFIBUS solution where most of the design options are made in order to guarantee the proper real-time behaviour of the overall network. We address the timing unpredictability problems placed by the co-existence of heterogeneous transmission media in the same network. Moreover, we propose a novel solution to provide inter-cell mobility to PROFIBUS wireless nodes.
Resumo:
Demands for functionality enhancements, cost reductions and power savings clearly suggest the introduction of multiand many-core platforms in real-time embedded systems. However, when compared to uni-core platforms, the manycores experience additional problems, namely the lack of scalable coherence mechanisms and the necessity to perform migrations. These problems have to be addressed before such systems can be considered for integration into the realtime embedded domain. We have devised several agreement protocols which solve some of the aforementioned issues. The protocols allow the applications to plan and organise their future executions both temporally and spatially (i.e. when and where the next job will be executed). Decisions can be driven by several factors, e.g. load balancing, energy savings and thermal issues. All presented protocols are analytically described, with the particular emphasis on their respective real-time behaviours and worst-case performance. The underlying assumptions are based on the multi-kernel model and the message-passing paradigm, which constitutes the communication between the interacting instances.
Resumo:
An approach for the analysis of uncertainty propagation in reliability-based design optimization of composite laminate structures is presented. Using the Uniform Design Method (UDM), a set of design points is generated over a domain centered on the mean reference values of the random variables. A methodology based on inverse optimal design of composite structures to achieve a specified reliability level is proposed, and the corresponding maximum load is outlined as a function of ply angle. Using the generated UDM design points as input/output patterns, an Artificial Neural Network (ANN) is developed based on an evolutionary learning process. Then, a Monte Carlo simulation using ANN development is performed to simulate the behavior of the critical Tsai number, structural reliability index, and their relative sensitivities as a function of the ply angle of laminates. The results are generated for uniformly distributed random variables on a domain centered on mean values. The statistical analysis of the results enables the study of the variability of the reliability index and its sensitivity relative to the ply angle. Numerical examples showing the utility of the approach for robust design of angle-ply laminates are presented.
Resumo:
PROFIBUS is an international standard (IEC 61158, EN 50170) for factory-floor communications, with several thousands of installations worldwide. Taking into account the increasing need for mobile devices in industrial environments, one obvious solution is to extend traditional wired PROFIBUS networks with wireless capabilities. In this paper, we outline the major aspects of a hybrid wired/wireless PROFIBUS-based architecture, where most of the design options were made in order to guarantee the real-time behaviour of the overall network. We also introduce the timing unpredictability problems resulting from the co-existence of heterogeneous physical media in the same network. However, the major focus of this paper is on how to guarantee real-time communications in such a hybrid network, where nodes (and whole segments) can move between different radio cells (inter-cell mobility). Assuming a simple mobility management mechanism based on mobile nodes performing periodic radio channel assessment and switching, we propose a methodology to compute values for specific parameters that enable an optimal (minimum) and bounded duration of the handoff procedure.
Resumo:
Flexible forms of work like project work are gaining importance in industry and services. Looking at the research on project work, the vast majority of present literature is on project management, but increasingly, problems concerning the quality of work and the efficiency of project teams become visible. The question now is how project work can be structured in order to simultaneously provide efficient and flexible work and healthy working conditions ensuring the development of human resources for a long time. Selected results of publicly funded research into project work will be presented based on case studies in 7 software development /IT consulting project teams (N=34). A set of different methods was applied: interviews with management/project managers, group interviews on work constraints, a monthly diary about well-being and critical incidences in the course of the project, and a final evaluation questionnaire on project outcomes focusing on economic and health aspects. Findings reveal that different types of projects exist with varying degree of team members’ autonomy and influence on work structuring. An effect of self-regulation on mental strain could not be found. The results emphasize, that contradicting requirements and insufficient organizational resources with respect to the work requirements lead to an increased work intensity or work obstruction. These contradicting requirements are identified as main drivers for generating stress. Finally, employees with high values on stress for more than 2 months have significantly higher exhaustion rates than those with only one month peaks. Structuring project work and taking into account the dynamics of project work, there is a need for an active role of the project team in contract negotiation or the detailed definition of work – this is not only a question of individual autonomy but of negotiation the range of option for work structuring. Therefore, along with the sequential definition of the (software) product, the working conditions need to be re-defined.
Resumo:
Nonlinear Optimization Problems are usual in many engineering fields. Due to its characteristics the objective function of some problems might not be differentiable or its derivatives have complex expressions. There are even cases where an analytical expression of the objective function might not be possible to determine either due to its complexity or its cost (monetary, computational, time, ...). In these cases Nonlinear Optimization methods must be used. An API, including several methods and algorithms to solve constrained and unconstrained optimization problems was implemented. This API can be accessed not only as traditionally, by installing it on the developer and/or user computer, but it can also be accessed remotely using Web Services. As long as there is a network connection to the server where the API is installed, applications always access to the latest API version. Also an Web-based application, using the proposed API, was developed. This application is to be used by users that do not want to integrate methods in applications, and simply want to have a tool to solve Nonlinear Optimization Problems.
Resumo:
It is important to understand and forecast a typical or a particularly household daily consumption in order to design and size suitable renewable energy systems and energy storage. In this research for Short Term Load Forecasting (STLF) it has been used Artificial Neural Networks (ANN) and, despite the consumption unpredictability, it has been shown the possibility to forecast the electricity consumption of a household with certainty. The ANNs are recognized to be a potential methodology for modeling hourly and daily energy consumption and load forecasting. Input variables such as apartment area, numbers of occupants, electrical appliance consumption and Boolean inputs as hourly meter system were considered. Furthermore, the investigation carried out aims to define an ANN architecture and a training algorithm in order to achieve a robust model to be used in forecasting energy consumption in a typical household. It was observed that a feed-forward ANN and the Levenberg-Marquardt algorithm provided a good performance. For this research it was used a database with consumption records, logged in 93 real households, in Lisbon, Portugal, between February 2000 and July 2001, including both weekdays and weekend. The results show that the ANN approach provides a reliable model for forecasting household electric energy consumption and load profile. © 2014 The Author.