941 resultados para Multiprocessor scheduling with resource sharing
Resumo:
Cloud SLAs compensate customers with credits when average availability drops below certain levels. This is too inflexible because consumers lose non-measurable amounts of performance being only compensated later, in next charging cycles. We propose to schedule virtual machines (VMs), driven by range-based non-linear reductions of utility, different for classes of users and across different ranges of resource allocations: partial utility. This customer-defined metric, allows providers transferring resources between VMs in meaningful and economically efficient ways. We define a comprehensive cost model incorporating partial utility given by clients to a certain level of degradation, when VMs are allocated in overcommitted environments (Public, Private, Community Clouds). CloudSim was extended to support our scheduling model. Several simulation scenarios with synthetic and real workloads are presented, using datacenters with different dimensions regarding the number of servers and computational capacity. We show the partial utility-driven driven scheduling allows more VMs to be allocated. It brings benefits to providers, regarding revenue and resource utilization, allowing for more revenue per resource allocated and scaling well with the size of datacenters when comparing with an utility-oblivious redistribution of resources. Regarding clients, their workloads’ execution time is also improved, by incorporating an SLA-based redistribution of their VM’s computational power.
Resumo:
This paper presents a genetic algorithm for the resource constrained multi-project scheduling problem. The chromosome representation of the problem is based on random keys. The schedules are constructed using a heuristic that builds parameterized active schedules based on priorities, delay times, and release dates defined by the genetic algorithm. The approach is tested on a set of randomly generated problems. The computational results validate the effectiveness of the proposed algorithm.
Resumo:
With advancement in computer science and information technology, computing systems are becoming increasingly more complex with an increasing number of heterogeneous components. They are thus becoming more difficult to monitor, manage, and maintain. This process has been well known as labor intensive and error prone. In addition, traditional approaches for system management are difficult to keep up with the rapidly changing environments. There is a need for automatic and efficient approaches to monitor and manage complex computing systems. In this paper, we propose an innovative framework for scheduling system management by combining Autonomic Computing (AC) paradigm, Multi-Agent Systems (MAS) and Nature Inspired Optimization Techniques (NIT). Additionally, we consider the resolution of realistic problems. The scheduling of a Cutting and Treatment Stainless Steel Sheet Line will be evaluated. Results show that proposed approach has advantages when compared with other scheduling systems
Resumo:
The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. During the last couple of years many heuristic procedures have been developed for this problem, but still these procedures often fail in finding near-optimal solutions. This paper proposes a genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities and delay times of the activities are defined by the genetic algorithm. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.
Resumo:
- The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. During the last couple of years many heuristic procedures have been developed for this problem, but still these procedures often fail in finding near-optimal solutions. This paper proposes a genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities and delay times of the activities are defined by the genetic algorithm. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm
Resumo:
This paper presents a genetic algorithm for the multimode resource-constrained project scheduling problem (MRCPSP), in which multiple execution modes are available for each of the activities of the project. The objective function is the minimization of the construction project completion time. To solve the problem, is applied a two-level genetic algorithm, which makes use of two separate levels and extend the parameterized schedule generation scheme by introducing an improvement procedure. It is evaluated the quality of the schedule and present detailed comparative computational results for the MRCPSP, which reveal that this approach is a competitive algorithm.
Resumo:
This paper is on the self-scheduling problem for a thermal power producer taking part in a pool-based electricity market as a price-taker, having bilateral contracts and emission-constrained. An approach based on stochastic mixed-integer linear programming approach is proposed for solving the self-scheduling problem. Uncertainty regarding electricity price is considered through a set of scenarios computed by simulation and scenario-reduction. Thermal units are modelled by variable costs, start-up costs and technical operating constraints, such as: forbidden operating zones, ramp up/down limits and minimum up/down time limits. A requirement on emission allowances to mitigate carbon footprint is modelled by a stochastic constraint. Supply functions for different emission allowance levels are accessed in order to establish the optimal bidding strategy. A case study is presented to illustrate the usefulness and the proficiency of the proposed approach in supporting biding strategies. (C) 2014 Elsevier Ltd. All rights reserved.
Resumo:
The massification of electric vehicles (EVs) can have a significant impact on the power system, requiring a new approach for the energy resource management. The energy resource management has the objective to obtain the optimal scheduling of the available resources considering distributed generators, storage units, demand response and EVs. The large number of resources causes more complexity in the energy resource management, taking several hours to reach the optimal solution which requires a quick solution for the next day. Therefore, it is necessary to use adequate optimization techniques to determine the best solution in a reasonable amount of time. This paper presents a hybrid artificial intelligence technique to solve a complex energy resource management problem with a large number of resources, including EVs, connected to the electric network. The hybrid approach combines simulated annealing (SA) and ant colony optimization (ACO) techniques. The case study concerns different EVs penetration levels. Comparisons with a previous SA approach and a deterministic technique are also presented. For 2000 EVs scenario, the proposed hybrid approach found a solution better than the previous SA version, resulting in a cost reduction of 1.94%. For this scenario, the proposed approach is approximately 94 times faster than the deterministic approach.
Resumo:
Current Manufacturing Systems challenges due to international economic crisis, market globalization and e-business trends, incites the development of intelligent systems to support decision making, which allows managers to concentrate on high-level tasks management while improving decision response and effectiveness towards manufacturing agility. This paper presents a novel negotiation mechanism for dynamic scheduling based on social and collective intelligence. Under the proposed negotiation mechanism, agents must interact and collaborate in order to improve the global schedule. Swarm Intelligence (SI) is considered a general aggregation term for several computational techniques, which use ideas and inspiration from the social behaviors of insects and other biological systems. This work is primarily concerned with negotiation, where multiple self-interested agents can reach agreement over the exchange of operations on competitive resources. Experimental analysis was performed in order to validate the influence of negotiation mechanism in the system performance and the SI technique. Empirical results and statistical evidence illustrate that the negotiation mechanism influence significantly the overall system performance and the effectiveness of Artificial Bee Colony for makespan minimization and on the machine occupation maximization.
Resumo:
Demand response is assumed as an essential resource to fully achieve the smart grids operating benefits, namely in the context of competitive markets and of the increasing use of renewable-based energy sources. Some advantages of Demand Response (DR) programs and of smart grids can only be achieved through the implementation of Real Time Pricing (RTP). The integration of the expected increasing amounts of distributed energy resources, as well as new players, requires new approaches for the changing operation of power systems. The methodology proposed in this paper aims the minimization of the operation costs in a distribution network operated by a virtual power player that manages the available energy resources focusing on hour ahead re-scheduling. When facing lower wind power generation than expected from day ahead forecast, demand response is used in order to minimize the impacts of such wind availability change. In this way, consumers actively participate in regulation up and spinning reserve ancillary services through demand response programs. Real time pricing is also applied. The proposed model is especially useful when actual and day ahead wind forecast differ significantly. Its application is illustrated in this paper implementing the characteristics of a real resources conditions scenario in a 33 bus distribution network with 32 consumers and 66 distributed generators.
Resumo:
This paper presents a methodology for multi-objective day-ahead energy resource scheduling for smart grids considering intensive use of distributed generation and Vehicle- To-Grid (V2G). The main focus is the application of weighted Pareto to a multi-objective parallel particle swarm approach aiming to solve the dual-objective V2G scheduling: minimizing total operation costs and maximizing V2G income. A realistic mathematical formulation, considering the network constraints and V2G charging and discharging efficiencies is presented and parallel computing is applied to the Pareto weights. AC power flow calculation is included in the metaheuristics approach to allow taking into account the network constraints. A case study with a 33-bus distribution network and 1800 V2G resources is used to illustrate the performance of the proposed method.
Resumo:
This paper presents a decision support tool methodology to help virtual power players (VPPs) in the Smart Grid (SGs) context to solve the day-ahead energy resource scheduling considering the intensive use of Distributed Generation (DG) and Vehicle-To-Grid (V2G). The main focus is the application of a new hybrid method combing a particle swarm approach and a deterministic technique based on mixedinteger linear programming (MILP) to solve the day-ahead scheduling minimizing total operation costs from the aggregator point of view. A realistic mathematical formulation, considering the electric network constraints and V2G charging and discharging efficiencies is presented. Full AC power flow calculation is included in the hybrid method to allow taking into account the network constraints. A case study with a 33-bus distribution network and 1800 V2G resources is used to illustrate the performance of the proposed method.
Resumo:
Energy resource scheduling is becoming increasingly important, such as the use of more distributed generators and electric vehicles connected to the distribution network. This paper proposes a methodology to be used by Virtual Power Players (VPPs), regarding the energy resource scheduling in smart grids and considering day-ahead, hour-ahead and realtime time horizons. This method considers that energy resources are managed by a VPP which establishes contracts with their owners. The full AC power flow calculation included in the model takes into account network constraints. In this paper, distribution function errors are used to simulate variations between time horizons, and to measure the performance of the proposed methodology. A 33-bus distribution network with large number of distributed resources is used.
Resumo:
Despite the abundant literature in knowledge management, few empirical studies have explored knowledge management in connection with international assignees. This phenomenon has a special relevance in the Portuguese context, since (a) there are no empirical studies concerning this issue that involves international Portuguese companies; (b) the national business reality is incipient as far as internationalisation is concerned, and; (c) the organisational and national culture presents characteristics that are distinctive from the most highly studied contexts (e.g., Asia, USA, Scandinavian countries, Spain, France, The Netherlands, Germany, England and Russia). We examine the role of expatriates in transfer and knowledge sharing within the Portuguese companies with operations abroad. We focus specifically on expatriates’ role on knowledge sharing connected to international Portuguese companies and our findings take into account organizational representatives’ and expatriates’ perspectives. Using a comparative case study approach, we examine how three main dimensions influence the role of expatriates in knowledge sharing among headquarters and their subsidiaries (types of international assignment, reasons for using expatriation and international assignment characteristics). Data were collected using semi‐structured interviews to 30 Portuguese repatriates and 14 organizational representatives from seven Portuguese companies. The findings suggest that the reasons that lead Portuguese companies to expatriating employees are connected to: (1) business expansion needs; (2) control of international operations and; (3) transfer and knowledge sharing. Our study also shows that Portuguese companies use international assignments in order to positively respond to the increasingly decaying domestic market in the economic areas in which they operate. Evidence also reveals that expatriation is seen as a strategy to fulfill main organizational objectives through their expatriates (e.g., business internationalization, improvement of the coordination and control level of the units/subsidiaries abroad, replication of aspects of the home base, development and incorporation of new organizational techniques and processes). We also conclude that Portuguese companies have developed an International Human Resources Management strategy, based on an ethnocentric approach, typically associated with companies in early stages of internationalization, i.e., the authority and decision making are centered in the home base. Expatriates have a central role in transmitting culture and technical knowledge from company’s headquarters to the company’s branches. Based on the findings, the article will discuss in detail the main theoretical and managerial implications. Suggestions for further research will also be presented.
Resumo:
Face à estagnação da tecnologia uniprocessador registada na passada década, aos principais fabricantes de microprocessadores encontraram na tecnologia multi-core a resposta `as crescentes necessidades de processamento do mercado. Durante anos, os desenvolvedores de software viram as suas aplicações acompanhar os ganhos de performance conferidos por cada nova geração de processadores sequenciais, mas `a medida que a capacidade de processamento escala em função do número de processadores, a computação sequencial tem de ser decomposta em várias partes concorrentes que possam executar em paralelo, para que possam utilizar as unidades de processamento adicionais e completar mais rapidamente. A programação paralela implica um paradigma completamente distinto da programação sequencial. Ao contrário dos computadores sequenciais tipificados no modelo de Von Neumann, a heterogeneidade de arquiteturas paralelas requer modelos de programação paralela que abstraiam os programadores dos detalhes da arquitectura e simplifiquem o desenvolvimento de aplicações concorrentes. Os modelos de programação paralela mais populares incitam os programadores a identificar instruções concorrentes na sua lógica de programação, e a especificá-las sob a forma de tarefas que possam ser atribuídas a processadores distintos para executarem em simultâneo. Estas tarefas são tipicamente lançadas durante a execução, e atribuídas aos processadores pelo motor de execução subjacente. Como os requisitos de processamento costumam ser variáveis, e não são conhecidos a priori, o mapeamento de tarefas para processadores tem de ser determinado dinamicamente, em resposta a alterações imprevisíveis dos requisitos de execução. `A medida que o volume da computação cresce, torna-se cada vez menos viável garantir as suas restrições temporais em plataformas uniprocessador. Enquanto os sistemas de tempo real se começam a adaptar ao paradigma de computação paralela, há uma crescente aposta em integrar execuções de tempo real com aplicações interativas no mesmo hardware, num mundo em que a tecnologia se torna cada vez mais pequena, leve, ubíqua, e portável. Esta integração requer soluções de escalonamento que simultaneamente garantam os requisitos temporais das tarefas de tempo real e mantenham um nível aceitável de QoS para as restantes execuções. Para tal, torna-se imperativo que as aplicações de tempo real paralelizem, de forma a minimizar os seus tempos de resposta e maximizar a utilização dos recursos de processamento. Isto introduz uma nova dimensão ao problema do escalonamento, que tem de responder de forma correcta a novos requisitos de execução imprevisíveis e rapidamente conjeturar o mapeamento de tarefas que melhor beneficie os critérios de performance do sistema. A técnica de escalonamento baseado em servidores permite reservar uma fração da capacidade de processamento para a execução de tarefas de tempo real, e assegurar que os efeitos de latência na sua execução não afectam as reservas estipuladas para outras execuções. No caso de tarefas escalonadas pelo tempo de execução máximo, ou tarefas com tempos de execução variáveis, torna-se provável que a largura de banda estipulada não seja consumida por completo. Para melhorar a utilização do sistema, os algoritmos de partilha de largura de banda (capacity-sharing) doam a capacidade não utilizada para a execução de outras tarefas, mantendo as garantias de isolamento entre servidores. Com eficiência comprovada em termos de espaço, tempo, e comunicação, o mecanismo de work-stealing tem vindo a ganhar popularidade como metodologia para o escalonamento de tarefas com paralelismo dinâmico e irregular. O algoritmo p-CSWS combina escalonamento baseado em servidores com capacity-sharing e work-stealing para cobrir as necessidades de escalonamento dos sistemas abertos de tempo real. Enquanto o escalonamento em servidores permite partilhar os recursos de processamento sem interferências a nível dos atrasos, uma nova política de work-stealing que opera sobre o mecanismo de capacity-sharing aplica uma exploração de paralelismo que melhora os tempos de resposta das aplicações e melhora a utilização do sistema. Esta tese propõe uma implementação do algoritmo p-CSWS para o Linux. Em concordância com a estrutura modular do escalonador do Linux, ´e definida uma nova classe de escalonamento que visa avaliar a aplicabilidade da heurística p-CSWS em circunstâncias reais. Ultrapassados os obstáculos intrínsecos `a programação da kernel do Linux, os extensos testes experimentais provam que o p-CSWS ´e mais do que um conceito teórico atrativo, e que a exploração heurística de paralelismo proposta pelo algoritmo beneficia os tempos de resposta das aplicações de tempo real, bem como a performance e eficiência da plataforma multiprocessador.