995 resultados para Lightening schedule
Resumo:
Examination of the Iowa Medical Assistance Disproportionate Share Hospital Payments Program and the accompanying schedule identified as Schedule 1 for the Iowa Department of Human Services for the year ended June 30, 2011
Resumo:
The objective of this work was to determine the critical irrigation time for common bean (Phaseolus vulgaris L. cv. Carioca) using infrared thermometry. Five treatments were analyzed. Canopy temperature differences between plants and a well-watered control about 1, 2, 3, 4, and 5±0.5ºC were tested. Physiological variables and plant growth were analyzed to establish the best time to irrigate. There was a significant linear correlation between the index and stomatal resistance, transpiration rate, and leaf water potential. Although significant linear correlation between the index and mean values of total dry matter, absolute growth rate, and leaf area index was found, no correlation was found with other growth index like relative growth rate, net assimilation rate, and leaf area ratio. Plants irrigated when their canopy temperature was 3±0.5ºC above the control had their relative growth rate mean value increased up to 59.7%, yielding 2,260.2 kg ha-1, with a reduction of 38.0% in the amount of water used. Plants irrigated when their canopy temperature was 4±0.5ºC yielded 1,907.6 kg ha-1, although their relative growth rate mean value was 4.0% below the control. These results show that the best moment to irrigate common bean is when their canopy temperature is between 3ºC and 4±0.5ºC above the control.
Resumo:
Other Audit Reports - 28E Organizations
Resumo:
Other Audit Reports - 28E Organizations
Resumo:
Report on the Peace Officers’ Retirement, Accident and Disability System, Schedule of Employer Pension Amounts required to implement Governmental Accounting Standards Board (GASB) Statement No. 68, Accounting and Financial Reporting for Pensions for the year ended June 30, 2015
Resumo:
Self-controlled KR practice has revealed that providing participants the opportunity to control their KR is superior for motor learning compared to participants replicating the KR schedule of a self-control participant, without the choice (e.g., yoked). The purpose of the present experiment was two-fold. First, to examine the utility of a self-controlled KR schedule for learning a spatial motor task in younger and older adults and second, to determine whether a self-controlled KR schedule facilitates an increased ability to estimate one’s performance in retention and transfer. Twenty younger adults and 20 older adults practiced in either the self-control or yoked condition and were required to push and release a slide along a confined pathway using their non-dominant hand to a target distance. The retention data revealed that as a function of age, a self-controlled KR schedule facilitated superior retention performance and performance estimations in younger adults compared to their yoked counterparts.
Resumo:
Schedule of prices for Brown and McDonell, contractors, for sections 1, 2 and 3 of the Port Dalhousie Thorold Railway (1 page, handwritten), Sept. 24, 1856.
Resumo:
Denver and Rio Grande Railway schedule, 1881.
Resumo:
The New Continental Line Atchison, Topeka and Santa Fe Railroad West and Southwest schedule. The schedule is slightly torn. This does not affect the text, Sept. 4, 1881.
Resumo:
“Frisco Line” St. Louis and San Francisco Railway the direct line through St. Louis schedule, Jan. 9, 1882.
Resumo:
Union Pacific Railway from Kansas City , Omaha, St. Joseph to Denver, San Francisco, Portland, Helena, Butte, Boise, Leadville, Durango, Deadwood and all cities and mining camps in the west schedule, Jan. 15, 1882.
Resumo:
Wabash St. Louis and Pacific Railway schedule, 1882.
Resumo:
Iron Mountain Route Railway schedule: the great through line St. Louis, Arkansas and Texas to the Hot Springs of Arkansas.
Resumo:
Union Pacific Railway: the Kansas and Nebraska route schedule, 1882.