982 resultados para Intermittent electric power


Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper deals with a hierarchical structure composed by an event-based supervisor in a higher level and two distinct proportional integral (PI) controllers in a lower level. The controllers are applied to a variable speed wind energy conversion system with doubly-fed induction generator, namely, the fuzzy PI control and the fractional-order PI control. The event-based supervisor analyses the operation state of the wind energy conversion system among four possible operational states: park, start-up, generating or brake and sends the operation state to the controllers in the lower level. In start-up state, the controllers only act on electric torque while pitch angle is equal to zero. In generating state, the controllers must act on the pitch angle of the blades in order to maintain the electric power around the nominal value, thus ensuring that the safety conditions required for integration in the electric grid are met. Comparisons between fuzzy PI and fractional-order PI pitch controllers applied to a wind turbine benchmark model are given and simulation results by Matlab/Simulink are shown. From the results regarding the closed loop point of view, fuzzy PI controller allows a smoother response at the expense of larger number of variations of the pitch angle, implying frequent switches between operational states. On the other hand fractional-order PI controller allows an oscillatory response with less control effort, reducing switches between operational states. (C) 2015 Elsevier Ltd. All rights reserved.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para a obtenção de grau de Mestre em Engenharia Electrotécnica Ramo de Automação e Electrónica Industrial

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Mestrado em Engenharia Civil – Ramo Estruturas

Relevância:

80.00% 80.00%

Publicador:

Resumo:

No contexto da penetração de energias renováveis no sistema elétrico, Portugal ocupa uma posição de destaque a nível mundial, muito devido à produção de eólica. Com um sistema elétrico com forte presença de fontes de energia renováveis, novos desafios surgem, nomeadamente no caso da energia eólica pela sua imprevisibilidade e volatilidade. O recurso eólico embora seja ilimitado não é armazenável, surgindo assim a necessidade da procura de modelos de previsão de produção de energia elétrica dos parques eólicos de modo a permitir uma boa gestão do sistema. Nesta dissertação apresentam-se as contribuições resultantes de um trabalho de pesquisa e investigação sobre modelos de previsão da potência elétrica com base em valores de previsões meteorológicas, nomeadamente, valores previstos da intensidade e direção do vento. Consideraram-se dois tipos de modelos: paramétricos e não paramétricos. Os primeiros são funções polinomiais de vários graus e a função sigmoide, os segundos são redes neuronais artificiais. Para a estimação dos modelos e respetiva validação, são usados dados recolhidos ao longo de dois anos e três meses no parque eólico do Pico Alto de potência instalada de 6 MW. De forma a otimizar os resultados da previsão, consideram-se diferentes classes de perfis de produção, definidas com base em quatro e oito direções do vento, e ajustam-se os modelos propostos em cada uma das classes. São apresentados e discutidos resultados de uma análise comparativa do desempenho dos diferentes modelos propostos para a previsão da potência.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The power systems operation in the smart grid context increases significantly the complexity of their management. New approaches for ancillary services procurement are essential to ensure the operation of electric power systems with appropriate levels of stability, safety, quality, equity and competitiveness. These approaches should include market mechanisms which allow the participation of small and medium distributed energy resources players in a competitive market environment. In this paper, an energy and ancillary services joint market model used by an aggregator is proposed, considering bids of several types of distributed energy resources. In order to improve economic efficiency in the market, ancillary services cascading market mechanism is also considered in the model. The proposed model is included in MASCEM – a multi-agent system electricity market simulator. A case study considering a distribution network with high penetration of distributed energy resources is presented.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The high penetration of distributed energy resources (DER) in distribution networks and the competitiveenvironment of electricity markets impose the use of new approaches in several domains. The networkcost allocation, traditionally used in transmission networks, should be adapted and used in the distribu-tion networks considering the specifications of the connected resources. The main goal is to develop afairer methodology trying to distribute the distribution network use costs to all players which are usingthe network in each period. In this paper, a model considering different type of costs (fixed, losses, andcongestion costs) is proposed comprising the use of a large set of DER, namely distributed generation(DG), demand response (DR) of direct load control type, energy storage systems (ESS), and electric vehi-cles with capability of discharging energy to the network, which is known as vehicle-to-grid (V2G). Theproposed model includes three distinct phases of operation. The first phase of the model consists in aneconomic dispatch based on an AC optimal power flow (AC-OPF); in the second phase Kirschen’s andBialek’s tracing algorithms are used and compared to evaluate the impact of each resource in the net-work. Finally, the MW-mile method is used in the third phase of the proposed model. A distributionnetwork of 33 buses with large penetration of DER is used to illustrate the application of the proposedmodel.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper presents the characterization of high voltage (HV) electric power consumers based on a data clustering approach. The typical load profiles (TLP) are obtained selecting the best partition of a power consumption database among a pool of data partitions produced by several clustering algorithms. The choice of the best partition is supported using several cluster validity indices. The proposed data-mining (DM) based methodology, that includes all steps presented in the process of knowledge discovery in databases (KDD), presents an automatic data treatment application in order to preprocess the initial database in an automatic way, allowing time saving and better accuracy during this phase. These methods are intended to be used in a smart grid environment to extract useful knowledge about customers’ consumption behavior. To validate our approach, a case study with a real database of 185 HV consumers was used.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Electric power networks, namely distribution networks, have been suffering several changes during the last years due to changes in the power systems operation, towards the implementation of smart grids. Several approaches to the operation of the resources have been introduced, as the case of demand response, making use of the new capabilities of the smart grids. In the initial levels of the smart grids implementation reduced amounts of data are generated, namely consumption data. The methodology proposed in the present paper makes use of demand response consumers’ performance evaluation methods to determine the expected consumption for a given consumer. Then, potential commercial losses are identified using monthly historic consumption data. Real consumption data is used in the case study to demonstrate the application of the proposed method.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

O Despacho económico de um sistema eléctrico de energia com a coordenação hidrotérmica tem como objectivo alcançar a operação óptima do sistema em um determinado período de tempo, ao menor custo possível, e com alto grau de fiabilidade. O problema é muito complexo, pois depende do grau de dificuldade em se prever os caudais dos afluentes, e da capacidade das albufeiras das centrais hídricas. De um modo geral, a produção térmica é determinada de modo a proporcionar o uso mais racional possível da água, dentro do contexto de incertezas quanto às afluências futuras, de modo a, por um lado manter o sistemas o mais económico possível, e por outro, evitar o desperdício energético implícito em descarregamentos de volumes de água turbináveis. Neste trabalho é proposta uma metodologia baseada em programação linear para a solução da coordenação hidrotérmica de curto prazo, e que permite obter custos-sombra de água em centrais hídricas com armazenamento. Esta metodologia foi posteriormente implementado num programa computacional em Microsoft Excel 2010 para a solução numa primeira fase, da rede de 24 barramentos do IEEE, e numa segunda fase, para a solução da Rede Nacional de Transporte referente ao ano de 2010. Para efeitos de análise e validação de dados, os dados provenientes do programa, são depois comparados aos dados dos relatórios da REN. Por último, os dados provenientes do programa em Excel são colocados e analisados no programa PowerWorld Simulator 8.0.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

O constante crescimento dos produtores em regime especial aliado à descentralização dos pontos injetores na rede, tem permitido uma redução da importação de energia mas também tem acarretado maiores problemas para a gestão da rede. Estes problemas estão relacionados com o facto da produção estar dependente das condições climatéricas, como é o caso dos produtores eólicos, hídricos e solares. A previsão da energia produzida em função da previsão das condições climatéricas tem sido alvo de atenção por parte da comunidade empresarial do setor, pelo facto de existir modelos razoáveis para a previsão das condições climatéricas a curto prazo, e até a longo prazo. Este trabalho trata, em concreto, do problema da previsão de produção em centrais mini-hídricas, apresentando duas propostas para essa previsão. Em ambas as propostas efetua-se inicialmente a previsão do caudal que chega à central, sendo esta depois convertida em potência que é injetada na rede. Para a previsão do caudal utilizaram-se dois métodos estatísticos: o método Holt-Winters e os modelos ARMAX. Os dois modelos de previsão propostos consideram um horizonte temporal de uma semana, com discretização horária, para uma central no norte de Portugal, designadamente a central de Penide. O trabalho também contempla um pequeno estudo da bibliografia existente tanto para a previsão da produção como de afluências de centrais hidroelétricas. Aborda, ainda, conceitos relacionados com as mini-hídricas e apresenta uma caraterização do parque de centrais mini-hídricas em Portugal.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

All over the world, the liberalization of electricity markets, which follows different paradigms, has created new challenges for those involved in this sector. In order to respond to these challenges, electric power systems suffered a significant restructuring in its mode of operation and planning. This restructuring resulted in a considerable increase of the electric sector competitiveness. Particularly, the Ancillary Services (AS) market has been target of constant renovations in its operation mode as it is a targeted market for the trading of services, which have as main objective to ensure the operation of electric power systems with appropriate levels of stability, safety, quality, equity and competitiveness. In this way, with the increasing penetration of distributed energy resources including distributed generation, demand response, storage units and electric vehicles, it is essential to develop new smarter and hierarchical methods of operation of electric power systems. As these resources are mostly connected to the distribution network, it is important to consider the introduction of this kind of resources in AS delivery in order to achieve greater reliability and cost efficiency of electrical power systems operation. The main contribution of this work is the design and development of mechanisms and methodologies of AS market and for energy and AS joint market, considering different management entities of transmission and distribution networks. Several models developed in this work consider the most common AS in the liberalized market environment: Regulation Down; Regulation Up; Spinning Reserve and Non-Spinning Reserve. The presented models consider different rules and ways of operation, such as the division of market by network areas, which allows the congestion management of interconnections between areas; or the ancillary service cascading process, which allows the replacement of AS of superior quality by lower quality of AS, ensuring a better economic performance of the market. A major contribution of this work is the development an innovative methodology of market clearing process to be used in the energy and AS joint market, able to ensure viable and feasible solutions in markets, where there are technical constraints in the transmission network involving its division into areas or regions. The proposed method is based on the determination of Bialek topological factors and considers the contribution of the dispatch for all services of increase of generation (energy, Regulation Up, Spinning and Non-Spinning reserves) in network congestion. The use of Bialek factors in each iteration of the proposed methodology allows limiting the bids in the market while ensuring that the solution is feasible in any context of system operation. Another important contribution of this work is the model of the contribution of distributed energy resources in the ancillary services. In this way, a Virtual Power Player (VPP) is considered in order to aggregate, manage and interact with distributed energy resources. The VPP manages all the agents aggregated, being able to supply AS to the system operator, with the main purpose of participation in electricity market. In order to ensure their participation in the AS, the VPP should have a set of contracts with the agents that include a set of diversified and adapted rules to each kind of distributed resource. All methodologies developed and implemented in this work have been integrated into the MASCEM simulator, which is a simulator based on a multi-agent system that allows to study complex operation of electricity markets. In this way, the developed methodologies allow the simulator to cover more operation contexts of the present and future of the electricity market. In this way, this dissertation offers a huge contribution to the AS market simulation, based on models and mechanisms currently used in several real markets, as well as the introduction of innovative methodologies of market clearing process on the energy and AS joint market. This dissertation presents five case studies; each one consists of multiple scenarios. The first case study illustrates the application of AS market simulation considering several bids of market players. The energy and ancillary services joint market simulation is exposed in the second case study. In the third case study it is developed a comparison between the simulation of the joint market methodology, in which the player bids to the ancillary services is considered by network areas and a reference methodology. The fourth case study presents the simulation of joint market methodology based on Bialek topological distribution factors applied to transmission network with 7 buses managed by a TSO. The last case study presents a joint market model simulation which considers the aggregation of small players to a VPP, as well as complex contracts related to these entities. The case study comprises a distribution network with 33 buses managed by VPP, which comprises several kinds of distributed resources, such as photovoltaic, CHP, fuel cells, wind turbines, biomass, small hydro, municipal solid waste, demand response, and storage units.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The high penetration of distributed energy resources (DER) in distribution networks and the competitive environment of electricity markets impose the use of new approaches in several domains. The network cost allocation, traditionally used in transmission networks, should be adapted and used in the distribution networks considering the specifications of the connected resources. The main goal is to develop a fairer methodology trying to distribute the distribution network use costs to all players which are using the network in each period. In this paper, a model considering different type of costs (fixed, losses, and congestion costs) is proposed comprising the use of a large set of DER, namely distributed generation (DG), demand response (DR) of direct load control type, energy storage systems (ESS), and electric vehicles with capability of discharging energy to the network, which is known as vehicle-to-grid (V2G). The proposed model includes three distinct phases of operation. The first phase of the model consists in an economic dispatch based on an AC optimal power flow (AC-OPF); in the second phase Kirschen's and Bialek's tracing algorithms are used and compared to evaluate the impact of each resource in the network. Finally, the MW-mile method is used in the third phase of the proposed model. A distribution network of 33 buses with large penetration of DER is used to illustrate the application of the proposed model.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This study contributes to knowledge of Anopheles species, including vectors of Plasmodium from the western Brazilian Amazon in Porto Velho, Rondônia State. The sampling area has undergone substantial environmental changes as a consequence of agricultural and hydroelectric projects, which have caused intensive deforestation and favored habitats for some mosquito species. The purpose of this study was to diagnose the occurrence of anopheline species from collections in three locations along an electric-power transmission line. Each locality was sampled three times from 2010 to 2011. The principal adult mosquitoes captured in Shannon trap were Anopheles darlingi, An. triannulatus, An. nuneztovari l.s., An.gilesi and An. costai. In addition, larvae were collected in ground breeding sites for Anopheles braziliensis, An. triannulatus, An. darlingi, An. deaneorum, An. marajoara, An. peryassui, An. nuneztovari l.s. and An. oswaldoi-konderi. Anopheles darlingi was the most common mosquito in the region. We discuss Culicidae systematics, fauna distribution, and aspects of malaria in altered habitats of the western Amazon.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Neste trabalho é efetuado o dimensionamento de sistemas fotovoltaicos para serem instalados em edificações localizadas em Angola com o objetivo de analisar a produção de energia elétrica através de sistemas fotovoltaicos. Utilizando o software PVsyst na versão 6.3.2 foram dimensionados três sistemas fotovoltaicos, dois sistemas destinados a ser instalados numa residência, um ligado à rede e o outro autónomo e por fim um sistema fotovoltaico ligado à rede para uma instalação industrial. A determinação dos custos de investimento nos três sistemas foi obtida de forma aproximada, tendo como base preços dos equipamentos no mercado Português e considerando os custos de importação de mercadorias no mercado Angolano. Para os sistemas ligados à rede é analisada a rentabilidade financeira do investimento durante o período de vida útil dos módulos fotovoltaicos considerando três cenários distintos. No primeiro cenário o valor da remuneração pela energia vendida pelo produtor é igual ao valor pago pela energia comprada. No segundo e terceiros cenário de análise económica pretende-se encontrar uma tarifa de energia que torne o investimento rentável com um período de amortização de 7 e 12 anos respetivamente.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

As centrais termoelétricas convencionais convertem apenas parte do combustível consumido na produção de energia elétrica, sendo que outra parte resulta em perdas sob a forma de calor. Neste sentido, surgiram as unidades de cogeração, ou Combined Heat and Power (CHP), que permitem reaproveitar a energia dissipada sob a forma de energia térmica e disponibilizá-la, em conjunto com a energia elétrica gerada, para consumo doméstico ou industrial, tornando-as mais eficientes que as unidades convencionais Os custos de produção de energia elétrica e de calor das unidades CHP são representados por uma função não-linear e apresentam uma região de operação admissível que pode ser convexa ou não-convexa, dependendo das caraterísticas de cada unidade. Por estas razões, a modelação de unidades CHP no âmbito do escalonamento de geradores elétricos (na literatura inglesa Unit Commitment Problem (UCP)) tem especial relevância para as empresas que possuem, também, este tipo de unidades. Estas empresas têm como objetivo definir, entre as unidades CHP e as unidades que apenas geram energia elétrica ou calor, quais devem ser ligadas e os respetivos níveis de produção para satisfazer a procura de energia elétrica e de calor a um custo mínimo. Neste documento são propostos dois modelos de programação inteira mista para o UCP com inclusão de unidades de cogeração: um modelo não-linear que inclui a função real de custo de produção das unidades CHP e um modelo que propõe uma linearização da referida função baseada na combinação convexa de um número pré-definido de pontos extremos. Em ambos os modelos a região de operação admissível não-convexa é modelada através da divisão desta àrea em duas àreas convexas distintas. Testes computacionais efetuados com ambos os modelos para várias instâncias permitiram verificar a eficiência do modelo linear proposto. Este modelo permitiu obter as soluções ótimas do modelo não-linear com tempos computationais significativamente menores. Para além disso, ambos os modelos foram testados com e sem a inclusão de restrições de tomada e deslastre de carga, permitindo concluir que este tipo de restrições aumenta a complexidade do problema sendo que o tempo computacional exigido para a resolução do mesmo cresce significativamente.