In principle the global mean geostrophic surface circulation of the ocean can be diagnosed by subtracting a geoid from a mean sea surface (MSS). However, because the resulting mean dynamic topography (MDT) is approximately two orders of magnitude smaller than either of the constituent surfaces, and because the geoid is most naturally expressed as a spectral model while the MSS is a gridded product, in practice complications arise. Two algorithms for combining MSS and satellite-derived geoid data to determine the ocean’s mean dynamic topography (MDT) are considered in this paper: a pointwise approach, whereby the gridded geoid height field is subtracted from the gridded MSS; and a spectral approach, whereby the spherical harmonic coefficients of the geoid are subtracted from an equivalent set of coefficients representing the MSS, from which the gridded MDT is then obtained. The essential difference is that with the latter approach the MSS is truncated, a form of filtering, just as with the geoid. This ensures that errors of omission resulting from the truncation of the geoid, which are small in comparison to the geoid but large in comparison to the MDT, are matched, and therefore negated, by similar errors of omission in the MSS. The MDTs produced by both methods require additional filtering. However, the spectral MDT requires less filtering to remove noise, and therefore it retains more oceanographic information than its pointwise equivalent. The spectral method also results in a more realistic MDT at coastlines. 1. Introduction An important challenge in oceanography is the accurate determination of the ocean’s time-mean dynamic topography (MDT). If this can be achieved with sufficient accuracy for combination with the timedependent component of the dynamic topography, obtainable from altimetric data, then the resulting sum (i.e., the absolute dynamic topography) will give an accurate picture of surface geostrophic currents and ocean transports.
Resumo:
The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an extension to existing buildings to provide a warehouse, services block and packing line. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of building provision can be viewed as systems and subsystems which are differentiated from each other at decision points. Further to this, the subsystems can be viewed as the interaction of managing system and operating system. Using Walker's model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficacy of the organizational structure used. The causes of the client's dissatisfaction with the outcome of the project were lack of integration and complexity of the managing system. However, there was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's propositions.
Resumo:
An initial study of the ichnofabrics of the Upper Jurassic (Kimmeridgian) Jubaila Formation of Saudi Arabia shows that the ichnofabrics are closely matched to the relatively well-described ichnofabrics of the contemporary Fulmar Formation of the UK Continental Shelf (North Sea), in respect of the lower shoreface/offshore transition facies to offshore facies. The ichnology and ichnofabrics of the Lower Jubaila Formation show that deposition took place on an open-marine platform on the Arabian craton subject to periodic storm activity, but under a persisting equilibrium between sediment accumulation and subsidence. This is consistent with the moderately deep-marine foraminiferal assemblages and the presence of calcareous nannofossils. Cyclicity is absent, though storm beds may be grouped, in contrast with the genetic sequences present in the rift and halokinetic scenario of the North Sea. In contrast with the siliciclastic setting hardgrotinds (with Gastrochaenolites), more common firmground omission surfaces, and micritic mudstones with Chondrites and Zoophycos are notable features of the carbonate facies. In siliciclastic successions (parasequences) the latter ichnotaxa are generally regarded as having been deposited in rather deeper water, but in the carbonate Jubaila Formation are interpreted as being associated with local areas of lower turbulence. Likewise, the hardgrounds and firmgrounds, which have not been traced laterally, are tentatively regarded to be of local significance.
Resumo:
An investigation using the Stepping Out model of early hominin dispersal out of Africa is presented here. The late arrival of early hominins into Europe, as deduced from the fossil record, is shown to be consistent with poor ability of these hominins to survive in the Eurasian landscape. The present study also extends the understanding of modelling results from the original study by Mithen and Reed (2002. Stepping out: a computer simulation of hominid dispersal from Africa. J. Hum. Evol. 43, 433-462). The representation of climate and vegetation patterns has been improved through the use of climate model output. This study demonstrates that interpretative confidence may be strengthened, and new insights gained when climate models and hominin dispersal models are integrated. (C) 2007 Elsevier Ltd. All rights reserved.
Resumo:
The technique of linear responsibility analysis is used for a retrospective case study of a private development consisting of an extension to an existing building to provide a wholesale butchery facility. The project used a conventionally organized management process. The organization structure adopted on the project is analysed using concepts from the systems theory, which are included in Walkers theoretical model of the structure of building project organizations. This model proposes that the process of building provision can be viewed as systems and sub-systems that are differentiated from each other at decision points. Further to this, the sub-systems can be viewed as the interaction of managing system and operating system. Using Walkers model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficiency of the organizational structure used. The project's organization structure diverged from the models propositions resulting in delay to the project's completion and cost overrun but the client was satisfied with the project functionally.
Resumo:
The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an engineering factory and offices. A multi-disciplinary professional practice was used to manage and design the project. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of buildings provision can be viewed as systems and sub-systems which are differentiated form each other at decision points. Further to this, the sub-systematic analysis of the relationship between the contributors gives a quantitative assessment of the efficiency of the organizational structure used. There was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's proposition. However, the project was subject to string environmental forces which the project organization was not capable of entirely overcoming.
Resumo:
The management of a public sector project is analysed using a model developed from systems theory. Linear responsibility analysis is used to identify the primary and key decision structure of the project and to generate quantitative data regarding differentiation and integration of the operating system, the managing system and the client/project team. The environmental context of the project is identified. Conclusions are drawn regarding the project organization structure's ability to cope with the prevailing environmental conditions. It is found that the complexity of the managing system imposed on the project was unable to achieve this and created serious deficiencies in the outcome of the project.
Resumo:
A systematic technique for identifying the environments of construction projects is described. It provides a method for isolating the major variables surrounding construction projects, and is briefly applied to the industries of Britain and Jamaica to illustrate its application. From this, it is inferred that the environment of a Jamaican construction project in systems terms is broadly similar to the environment of a construction project in Britain.