977 resultados para Electric power-plants, Portable


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Nykyajan jatkuvasti kiristyvät päästörajoitukset ja ilmastonmuutoksen uhka ovat ajavia voimia kehittämään voimalaitosten tekniikkaa energiatehokkaampaan ja ympäristöystävällisempään suuntaan. Polttomoottoritekniikan parantaminen on tärkeä osa tätä kehitystä, mutta jo nykyisiä moottoreita voitaisiin ajaa energiate-hokkaammin käyttämällä akustoa ja älykästä säätöjärjestelmää apuna. Työssä tutkitaan simulaatioiden avulla voidaanko ulkomerellä toimivan huolto-aluksen energiatehokkuutta parantaa muokkaamalla sen tehon tuottoa keskitehoes-timaattorin ja akuston avulla.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Renewable energy investments play a key role in energy transition. While studies have suggested that social acceptance may form a barrier for renewable energy investments, the ways in which companies perceive and attempt to gain the acceptance have received little attention. This study aims to fill the gap by exploring how large electric utilities justify their strategic investments in their press releases and how do the justifications differ between renewable and non-renewable energy investments. The study bases on legitimacy theory and aims at contributing to the research on legitimation in institutional change. As its research method, the study employs an inductive mixed method content analysis. The study has two parts: a qualitative content analysis that explores and identifies the themes and legitimation strategies of the press releases and a quantitative computer-aided analysis that compares renewable and non-renewable energy investments. The sample of the study consists of 396 press releases representing the strategic energy investments of 34 electric utilities from the list of the world’s 250 largest and financially most successful energy companies. The data is collected from the period of 2010–2014. The study reveals that most important justifications for strategic energy investments are fit with the strategy and environmental and social benefits. Justifications address especially the expectations of market. Investments into non-renewable energy are justified more and they use more arguments addressing the proprieties and performance of power plants whereas renewable energy investments are legitimized by references to past actions and commonly accepted morals and norms. The findings support the notion that validity-addressing and propriety-addressing legitimation strategies are used differently in stable and unstable institutional settings.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This work focuses on the 159.5 kW solar photovoltaic power plant project installed at the Lappeenranta University of Technology in 2013 as an example of what a solar plant project could be in Finland. The project consists of a two row carport and a flat roof installation on the roof of the university laboratories. The purpose of this project is not only its obvious energy savings potential but also to serve as research and teaching laboratory tool. By 2013, there were not many large scale solar power plants in Finland. For this reason, the installation and data experience from the solar power plant at LUT has brought valuable information for similar projects in northern countries. This work includes a first part for the design and acquisition of the project to continue explaining about the components and their installation. At the end, energy produced by this solar power plant is studied and calculated to find out some relevant economical results. For this, the radiation arriving to southern Finland, the losses of the system in cold weather and the impact of snow among other aspects are taken into account.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study is done to examine waste power plant’s optimal processing chain and it is important to consider from several points of view on why one option is better than the other. This is to insure that the right decision is made. Incineration of waste has devel-oped to be one decent option for waste disposal. There are several legislation matters and technical options to consider when starting up a waste power plant. From the tech-niques pretreatment, burner and flue gas cleaning are the biggest ones to consider. The treatment of incineration residues is important since it can be very harmful for the envi-ronment. The actual energy production from waste is not highly efficient and there are several harmful compounds emitted. Recycling of waste before incineration is not very typical and there are not many recycling options for materials that cannot be easily re-cycled to same product. Life cycle assessment is a good option for studying the envi-ronmental effect of the system. It has four phases that are part of the iterative study process. In this study the case environment is a waste power plant. The modeling of the plant is done with GaBi 6 software and the scope is from gate-to-grave. There are three different scenarios, from which the first and second are compared to each other to reach conclusions. Zero scenario is part of the study to demonstrate situation without the power plant. The power plant in this study is recycling some materials in scenario one and in scenario two even more materials and utilize the bottom ash more ways than one. The model has the substitutive processes for the materials when they are not recycled in the plant. The global warming potential results show that scenario one is the best option. The variable costs that have been considered tell the same result. The conclusion is that the waste power plant should not recycle more and utilize bottom ash in a number of ways. The area is not ready for that kind of utilization and production from recycled materials.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this thesis was the screening of power to gas projects worldwide and reviewing the technologies used and applications for the end products. This study focuses solely on technical solutions and feasibility, economical profitability is excluded. With power grids having larger penetrations of intermittent sources such as solar and wind power, the demand and production cannot be balanced in conventional methods. Technologies for storing electric power in times of surplus production are needed, and the concept called power to gas is a solution for this problem. A total of 57 projects mostly located in Europe were reviewed by going through publications, presentations and project web pages. Hydrogen is the more popular end product over methane. Power to gas is a viable concept when power production from intermittent sources needs to be smoothed and time shifted, when carbon free fuels are produced for vehicles and when chemical industry needs carbon neutral raw materials.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Power at the Falls: The first recorded harnessing of Niagara Falls power was in 1759 by Daniel Joncairs. On the American side of the Falls he dug a small ditch and drew water to turn a wheel which powered a sawmill. In 1805 brothers Augustus and Peter Porter expanded on Joncairs idea. They bought the American Falls from New York State at public auction. Using Joncairs old site they built a gristmill and tannery which stayed in business for twenty years. The next attempt at using the Falls came in 1860 when construction of the hydraulic canal began by the Niagara Falls Hydraulic Power and Manufacturing Co. The canal was complete in 1861 and brought water from the Niagara river, above the falls, to the mills below. By 1881 the Niagara Falls Hydraulic Power and Manufacturing Co. had a small generating station which provided some electricity to the village of Niagara Falls and the Mills. This lasted only four years and then the company sold its assets at public auction due to bankruptcy. Jacob Schoellkopf arrived at the Falls in 1877 with the purchase of the hydraulic canal land and water and power rights. In 1879 Schoellkopf teamed up with Charles Brush (of Euclid Ohio) and powered Brush’s generator and carbon arc lights with the power from his water turbines, to illuminate the Falls electrically for the first time. The year 1895 marked the opening of the Adam No. 1 generating station on the American side. The station was the beginnings of modern electrical utility operations. The design and operations of the generating station came from worldwide competitions held by panels of experts. Some who were involved in the project include; George Westinghouse, J. Pierpont Morgan, Lord Kelvin and Nikoli Tesla. The plants were operated by the Niagara Falls Power Company until 1961, when the Robert Moses Plant began operation in Lewiston, NY. The Adams plants were demolished that same year and the site used as a sewage treatment plant. The Canadian side of the Falls began generating their own power on January 1, 1905. This power came from the William Birch Rankine Power Station located 500 yards above the Horseshoe Falls. This power station provided the village of Fort Erie with its first electricity in 1907, using its two 10,000 electrical horsepower generators. Today 11 generators produce 100,000 horsepower (75 megawatts) and operate as part of the Niagara Mohawk and Fortis Incorporated Power Group.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Sir Adam Beck ( a London, Ontario manufacturer, Mayor and Conservative member of the provincial legislature) was a champion of municipal and provincial power ownership. Beck become the “Power Minister” and chairman of the Hydro-Electric Power Commission of Ontario which was the world’s first publicly owned utility. In 1925 the first unit of the Hydro Electric Power Commission’s Queenston Chippawa hydro-electric development on the Niagara River went into service. The station was renamed in 1950 as “Sir Adam Beck #1”. This marked the 25th anniversary of Beck’s death. This is one of 2 generating stations in Niagara Falls. There is also Adam Beck Plant #2. The Niagara generating stations supply one quarter of all power used in New York State and Ontario.Ontario Hydro has two water tunnels which traverse the entire City of Niagara Falls from the Village of Chippawa in the South to the Sir Adam Beck Hydro Electric Generating Stations in the North. Also they are in the process of building the third tunnel. In addition, Ontario Hydro has a 13.6 km open canal which traverses the entire City of Niagara Falls. Source: http://www.hydroone.com/OurCompany/Pages/OurHistory.aspx

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In dieser Arbeit wurde ein gemischt-ganzzahliges lineares Einsatzoptimierungsmodell für Kraftwerke und Speicher aufgebaut und für die Untersuchung der Energieversorgung Deutschlands im Jahre 2050 gemäß den Leitstudie-Szenarien 2050 A und 2050 C ([Nitsch und Andere, 2012]) verwendet, in denen erneuerbare Energien einen Anteil von über 85 % an der Stromerzeugung haben und die Wind- und Solarenergie starke Schwankungen der durch steuerbare Kraftwerke und Speicher zu deckenden residualen Stromnachfrage (Residuallast) verursachen. In Szenario 2050 A sind 67 TWh Wasserstoff, die elektrolytisch aus erneuerbarem Strom zu erzeugen sind, für den Verkehr vorgesehen. In Szenario 2050 C ist kein Wasserstoff für den Verkehr vorgesehen und die effizientere Elektromobilität hat einen Anteil von 100% am Individualverkehr. Daher wird weniger erneuerbarer Strom zur Erreichung desselben erneuerbaren Anteils im Verkehrssektor benötigt. Da desweiteren Elektrofahrzeuge Lastmanagementpotentiale bieten, weisen die Residuallasten der Szenarien eine unterschiedliche zeitliche Charakteristik und Jahressumme auf. Der Schwerpunkt der Betrachtung lag auf der Ermittlung der Auslastung und Fahrweise des in den Szenarien unterstellten ’Kraftwerks’-parks bestehend aus Kraftwerken zur reinen Stromerzeugung, Kraft-Wärme-Kopplungskraftwerken, die mit Wärmespeichern, elektrischen Heizstäben und Gas-Backupkesseln ausgestattet sind, Stromspeichern und Wärmepumpen, die durch Wärmespeicher zum Lastmanagment eingesetzt werden können. Der Fahrplan dieser Komponenten wurde auf minimale variable Gesamtkosten der Strom- und Wärmeerzeugung über einen Planungshorizont von jeweils vier Tagen hin optimiert. Das Optimierungsproblem wurde mit dem linearen Branch-and-Cut-Solver der software CPLEX gelöst. Mittels sogenannter rollierender Planung wurde durch Zusammensetzen der Planungsergebnisse für überlappende Planungsperioden der Kraftwerks- und Speichereinsatz für die kompletten Szenariojahre erhalten. Es wurde gezeigt, dass der KWK-Anteil an der Wärmelastdeckung gering ist. Dies wurde begründet durch die zeitliche Struktur der Stromresiduallast, die wärmeseitige Dimensionierung der Anlagen und die Tatsache, dass nur eine kurzfristige Speicherung von Wärme vorgesehen war. Die wärmeseitige Dimensionierung der KWK stellte eine Begrenzung des Deckungsanteils dar, da im Winter bei hoher Stromresiduallast nur wenig freie Leistung zur Beladung der Speicher zur Verfügung stand. In den Berechnungen für das Szenario 2050 A und C lag der mittlere Deckungsanteil der KWK an der Wärmenachfrage von ca. 100 TWh_th bei 40 bzw. 60 %, obwohl die Auslegung der KWK einen theoretischen Anteil von über 97 % an der Wärmelastdeckung erlaubt hätte, gäbe es die Beschränkungen durch die Stromseite nicht. Desweiteren wurde die CO2-Vermeidungswirkung der KWK-Wärmespeicher und des Lastmanagements mit Wärmepumpen untersucht. In Szenario 2050 A ergab sich keine signifikante CO2-Vermeidungswirkung der KWK-Wärmespeicher, in Szenario 2050 C hingegen ergab sich eine geringe aber signifikante CO2-Einsparung in Höhe von 1,6 % der Gesamtemissionen der Stromerzeugung und KWK-gebundenen Wärmeversorgung. Das Lastmanagement mit Wärmepumpen vermied Emissionen von 110 Tausend Tonnen CO2 (0,4 % der Gesamtemissionen) in Szenario A und 213 Tausend Tonnen in Szenario C (0,8 % der Gesamtemissionen). Es wurden darüber hinaus Betrachtungen zur Konkurrenz zwischen solarthermischer Nahwärme und KWK bei Einspeisung in dieselben Wärmenetze vorgenommen. Eine weitere Einschränkung der KWK-Erzeugung durch den Einspeisevorrang der Solarthermie wurde festgestellt. Ferner wurde eine untere Grenze von 6,5 bzw. 8,8 TWh_th für die in den Szenarien mindestens benötigte Wasserstoff-Speicherkapazität ermittelt. Die Ergebnisse dieser Arbeit legen nahe, das technisch-ökonomische Potential von Langzeitwärmespeichern für eine bessere Integration von KWK ins System zu ermitteln bzw. generell nach geeigneteren Wärmesektorszenarien zu suchen, da deutlich wurde, dass für die öffentliche Wärmeversorgung die KWK in Kombination mit Kurzzeitwärmespeicherung, Gaskesseln und elektrischen Heizern keine sehr effektive CO2 -Reduktion in den Szenarien erreicht. Es sollte dabei z.B. untersucht werden, ob ein multivalentes System aus KWK, Wärmespeichern und Wärmepumpen eine ökonomisch darstellbare Alternative sein könnte und im Anschluss eine Betrachtung der optimalen Anteile von KWK, Wärmepumpen und Solarthermie im Wärmemarkt vorgenommen werden.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper aims to survey the techniques and methods described in literature to analyse and characterise voltage sags and the corresponding objectives of these works. The study has been performed from a data mining point of view

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Three multivariate statistical tools (principal component analysis, factor analysis, analysis discriminant) have been tested to characterize and model the sags registered in distribution substations. Those models use several features to represent the magnitude, duration and unbalanced grade of sags. They have been obtained from voltage and current waveforms. The techniques are tested and compared using 69 registers of sags. The advantages and drawbacks of each technique are listed

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper focus on the problem of locating single-phase faults in mixed distribution electric systems, with overhead lines and underground cables, using voltage and current measurements at the sending-end and sequence model of the network. Since calculating series impedance for underground cables is not as simple as in the case of overhead lines, the paper proposes a methodology to obtain an estimation of zero-sequence impedance of underground cables starting from previous single-faults occurred in the system, in which an electric arc occurred at the fault location. For this reason, the signal is previously pretreated to eliminate its peaks voltage and the analysis can be done working with a signal as close as a sinus wave as possible