969 resultados para transportation geotechnics
Resumo:
Supplement to HR-388 - "Total Cost of Transportation Analysis of Road and Highway Issues"
Resumo:
TPMS is proposed as a distributed, PC-based system for automating two processes required for road improvements in Iowa: a) the annual preparation, submission, and approval of road improvement programs. b) the ongoing process of developing plans and obtaining approval for projects to be let for bids.
Resumo:
HR-394 was a software and database development project. Via funding provided by the Iowa Highway Research Board, the Iowa County Engineer's Association Service Bureau oversaw the planning and implementation of an Internet based application that supports two major local-government transportation project activities: Project programming and Development tracking. The goals were to reduce errors and inconsistencies, speed up the processes, link people to both project data and each other, and build a framework that could eventually support a 'paperless' work flow. The work started in 1999 and initial development was completed by the fall of 2002. Since going live, several 'piggy back' applications have been required to make the Programming side better fit actual work procedures. This part of the system has proven adequate but will be rewritten in 2004 to make it easier to use. The original development side module was rejected by the users and so had to be rewritten in 2003. The second version has proven much better, is heavily used, and is interconnected with Iowa DOT project data systems. Now that the system is in operation, it will be maintained and operated by the ICEA Service Bureau as an ongoing service function.
Resumo:
Weekly letting report
Resumo:
This document describes planned investments in Iowa’s multimodal transportation system including aviation, transit, railroads, trails, and highways. This five-year program documents $3.2 billion of highway and bridge construction projects on the primary road system using federal and state funding. Of that funding, a little over $500 million is available due to the passage of Senate File 257 in February 2015. As required by Senate File 257, this program includes a list of the critical highway and bridge projects funded with the additional revenue. As with other recent programs, there continues to be uncertainty in federal funding for roads and bridges. The most recent federal authorization, Moving Ahead for Progress in the 21st Century (MAP-21), will expire July 31, 2015. At the same time that MAP-21 expires and absent Congressional action, the federal Highway Trust Fund will no longer be able to provide funding at current levels. This could result in reduced federal funding reimbursement for projects already underway and/or full elimination of federal highway funding for new projects in federal fiscal year 2016. These two issues provide funding uncertainty with this program in fiscal year 2016 and beyond.
Resumo:
A prior project, HR-388, (which was entitled "Total Cost of Transportation analysis of road and highway issues"), explored the use of a total economic cost basis for evaluation of road based transportation issues. It was conducted as a proof-of-concept effort between 1996 and 2002, with the final report presented in May 2002. TR-477 rebuilt the analytical model using current data, then performed general, system level, county level, and road segment level analyses. The results are presented herein and will be distributed to all county engineers for information and local use.
Resumo:
Please see TR-477 Phase 2 Final Report -- http://publications.iowa.gov/id/eprint/20041
Resumo:
The purpose of this investigation was to evaluate the Compensatory Wetland Mitigation Program at the Iowa Department of Transportation (DOT) in terms of regulatory compliance. Specific objectives included: 1) Determining if study sites meet the definition of a jurisdictional wetland. 2) Determining the degree of compliance with requirements specified in Clean Water Act Section 404 permits. A total of 24 study sites, in four age classes were randomly selected from over 80 sites currently managed by the Iowa DOT. Wetland boundaries were delineated in the field and mitigation compliance was determined by comparing the delineated wetland acreage at each study site to the total wetland acreage requirements specified in individual CWA Section 404 permits. Of the 24 sites evaluated in this study, 58 percent meet or exceed Section 404 permit requirements. Net gain ranged from 0.19 acre to 27.2 acres. Net loss ranged from 0.2 acre to 14.6 acres. The Denver Bypass 1 site was the worst performer, with zero acres of wetland present on the site and the Akron Wetland Mitigation Site was the best performer with slightly more than 27 acres over the permit requirement. Five of the 10 under-performing sites are more than five years post construction, two are five years post construction, one is three years post construction and the remaining two are one year post construction. Of the sites that meet or exceed permit requirements, approximately 93 percent are five years or less post construction and approximately 43 percent are only one year old. Only one of the 14 successful sites is more than five years old. Using Section 404 permit acreage requirements as the criteria for measuring success, 58 percent of the wetland mitigation sites investigated as part of this study are successful. Using net gain/loss as the measure of success, the Compensatory Wetland Mitigation Program has been successful in creating/restoring nearly 44 acres of wetland over what was required by permits.
Resumo:
Weekly letting report
Resumo:
The objective of this project has been to identify best practices and approaches to Municipal Separate Storm Sewer System (MS4) program planning for the Iowa Department of Transportation. Information is primarily based on existing state MS4 programs as examples and references for use as an agency-based MS4 program is developed.
Resumo:
Weekly letting report
Resumo:
Transportation map of Iowa, updated march 1, 2014. map focuses on interstate highways, primary and secondary state roads, county roads, and scenic byways. Also includes railroad lines, airports, waterways, and locks and dams. All 99 counties are represented, as well as approximately 1,000 cities and towns. Points of interest are also marked. This record contains images of both the front and the back of the map.
Resumo:
Weekly letting report
Resumo:
Report on the Iowa Department of Transportation for the year ended June 30, 2014
Resumo:
Weekly letting report