999 resultados para insulated gate power switches
Resumo:
A start-up circuit, used in a micro-power indoor light energy harvesting system, is described. This start-up circuit achieves two goals: first, to produce a reset signal, power-on-reset (POR), for the energy harvesting system, and secondly, to temporarily shunt the output of the photovoltaic (PV) cells, to the output node of the system, which is connected to a capacitor. This capacitor is charged to a suitable value, so that a voltage step-up converter starts operating, thus increasing the output voltage to a larger value than the one provided by the PV cells. A prototype of the circuit was manufactured in a 130 nm CMOS technology, occupying an area of only 0.019 mm(2). Experimental results demonstrate the correct operation of the circuit, being able to correctly start-up the system, even when having an input as low as 390 mV using, in this case, an estimated energy of only 5.3 pJ to produce the start-up.
Resumo:
Mestrado em Engenharia Electrotécnica – Sistemas Eléctricos de Energia
Resumo:
Wireless local-area networks (WLANs) have been deployed as office and home communications infrastructures worldwide. The diversification of the standards, such as IEEE 802.11 series demands the design of RF front-ends. Low power consumption is one of the most important design concerns in the application of those technologies. To maintain competitive hardware costs, CMOS has been used since it is the best solution for low cost and high integration processing, allowing analog circuits to be mixed with digital ones. In the receiver chain, the low noise amplifier (LNA) is one of the most critical blocks in a transceiver design. The sensitivity is mainly determined by the LNA noise figure and gain. It interfaces with the pre-select filter and the mixer. Furthermore, since it is the first gain stage, care must be taken to provide accurate input match, low-noise figure, good linearity and a sufficient gain over a wide band of operation. Several CMOS LNAs have been reported during the last decade, showing that the most research has been done at 802.11/b and GSM standards (900-2400MHz spectrum) and more recently at 802.11/a (5GHz band). One of the more significant disadvantages of 802.11/b is that the frequency band is crowded and subject to interference from other technologies, as is 2.4GHz cordless phones and Bluetooth. As the demand for radio-frequency integrated circuits, operating at higher frequency bands, increases, the IEEE 802.11/a standard becomes a very attractive option to wireless communication system developers. This paper presents the design and implementation of a low power, low noise amplifier aimed at IEEE 802.11a for WLAN applications. It was designed to be integrated with an active balun and mixer, representing the first step toward a fully integrated monolithic WLAN receiver. All the required circuits are integrated at the same die and are powered by 1.8V supply source. Preliminary experimental results (S-parameters) are shown and promise excellent results. The LNA circuit design details are illustrated in Section 2. Spectre simulation results focused at gain, noise figure (NF) and input/output matching are presented in Section 3. Finally, conclusions and comparison with other recently reported LNAs are made in Section 4, followed by future work.
Resumo:
Copyright © 2014 The Pennsylvania State University, University Park, PA.
Resumo:
This thesis presents the Fuzzy Monte Carlo Model for Transmission Power Systems Reliability based studies (FMC-TRel) methodology, which is based on statistical failure and repair data of the transmission power system components and uses fuzzyprobabilistic modeling for system component outage parameters. Using statistical records allows developing the fuzzy membership functions of system component outage parameters. The proposed hybrid method of fuzzy set and Monte Carlo simulation based on the fuzzy-probabilistic models allows catching both randomness and fuzziness of component outage parameters. A network contingency analysis to identify any overloading or voltage violation in the network is performed once obtained the system states. This is followed by a remedial action algorithm, based on Optimal Power Flow, to reschedule generations and alleviate constraint violations and, at the same time, to avoid any load curtailment, if possible, or, otherwise, to minimize the total load curtailment, for the states identified by the contingency analysis. For the system states that cause load curtailment, an optimization approach is applied to reduce the probability of occurrence of these states while minimizing the costs to achieve that reduction. This methodology is of most importance for supporting the transmission system operator decision making, namely in the identification of critical components and in the planning of future investments in the transmission power system. A case study based on Reliability Test System (RTS) 1996 IEEE 24 Bus is presented to illustrate with detail the application of the proposed methodology.
Resumo:
In this paper, we characterize two power indices introduced in [1] using two different modifications of the monotonicity property first stated by [2]. The sets of properties are easily comparable among them and with previous characterizations of other power indices.
Resumo:
Catastrophic events, such as wars and terrorist attacks, tornadoes and hurricanes, earthquakes, tsunamis, floods and landslides, are always accompanied by a large number of casualties. The size distribution of these casualties has separately been shown to follow approximate power law (PL) distributions. In this paper, we analyze the statistical distributions of the number of victims of catastrophic phenomena, in particular, terrorism, and find double PL behavior. This means that the data sets are better approximated by two PLs instead of a single one. We plot the PL parameters, corresponding to several events, and observe an interesting pattern in the charts, where the lines that connect each pair of points defining the double PLs are almost parallel to each other. A complementary data analysis is performed by means of the computation of the entropy. The results reveal relationships hidden in the data that may trigger a future comprehensive explanation of this type of phenomena.
Resumo:
Myocardial Perfusion Gated Single Photon Emission Tomography (Gated-SPET) imaging is used for the combined evaluation of myocardial perfusion and left ventricular (LV). The purpose of this study is to evaluate the influence of the total number of counts acquired from myocardium, in the calculation of myocardial functional parameters using routine software procedures. Methods: Gated-SPET studies were simulated using Monte Carlo GATE package and NURBS phantom. Simulated data were reconstructed and processed using the commercial software package Quantitative Gated-SPECT. The Bland-Altman and Mann-Whitney-Wilcoxon tests were used to analyze the influence of the number of total counts in the calculation of LV myocardium functional parameters. Results: In studies simulated with 3MBq in the myocardium there were significant differences in the functional parameters: Left ventricular ejection fraction (LVEF), end-systolic volume (ESV), Motility and Thickness; between studies acquired with 15s/projection and 30s/projection. Simulations with 4.2MBq show significant differences in LVEF, end-diastolic volume (EDV) and Thickness. Meanwhile in the simulations with 5.4MBq and 8.4MBq the differences were statistically significant for Motility and Thickness. Conclusion: The total number of counts per simulation doesn't significantly interfere with the determination of Gated-SPET functional parameters using the administered average activity of 450MBq to 5.4MBq in myocardium.
Resumo:
This paper presents a complete, quadratic programming formulation of the standard thermal unit commitment problem in power generation planning, together with a novel iterative optimisation algorithm for its solution. The algorithm, based on a mixed-integer formulation of the problem, considers piecewise linear approximations of the quadratic fuel cost function that are dynamically updated in an iterative way, converging to the optimum; this avoids the requirement of resorting to quadratic programming, making the solution process much quicker. From extensive computational tests on a broad set of benchmark instances of this problem, the algorithm was found to be flexible and capable of easily incorporating different problem constraints. Indeed, it is able to tackle ramp constraints, which although very important in practice were rarely considered in previous publications. Most importantly, optimal solutions were obtained for several well-known benchmark instances, including instances of practical relevance, that are not yet known to have been solved to optimality. Computational experiments and their results showed that the method proposed is both simple and extremely effective.
Resumo:
Competitive electricity markets have arisen as a result of power-sector restructuration and power-system deregulation. The players participating in competitive electricity markets must define strategies and make decisions using all the available information and business opportunities.
Resumo:
Although power-line communication (PLC) is not a new technology, its use to support communication with timing requirements is still the focus of ongoing research. Recently, a new infrastructure was presented, intended for communication using power lines from a central location to geographically dispersed nodes using inexpensive devices. This new infrastructure uses a two-level hierarchical power-line system, together with an IP-based network. Within this infrastructure, in order to provide end-toend communication through the two levels of the powerline system, it is necessary to fully understand the behaviour of the underlying network layers. The masterslave behaviour of the PLC MAC, together with the inherent dynamic topology of power-line networks are important issues that must be fully characterised. Therefore, in this paper we present a simulation model which is being used to study and characterise the behaviour of power-line communication.
Resumo:
This paper describes the communication stack of the REMPLI system: a structure using power-lines and IPbased networks for communication, for data acquisition and control of energy distribution and consumption. It is furthermore prepared to use alternative communication media like GSM or analog modem connections. The REMPLI system provides communication service for existing applications, namely automated meter reading, energy billing and domotic applications. The communication stack, consisting of physical, network, transport, and application layer is described as well as the communication services provided by the system. We show how the peculiarities of the power-line communication influence the design of the communication stack, by introducing requirements to efficiently use the limited bandwidth, optimize traffic and implement fair use of the communication medium for the extensive communication partners.
Resumo:
Mal sabia o Italiano Antonio Santi Giuseppe Meucci na segunda metade do século XIX (1870-1876), que a sua invenção iria alcançar um êxito sem precedente e que mudaria por completo o estilo de vida das gerações vindouras: o “Telettrofono” (telégrafo falante). Porém, e por necessidade, acabou por vender o protótipo e seus respetivos direitos, a Alexander Graham Bell, o qual ficou historicamente conhecido como o inventor do telefone. Com efeito, o telefone quase que dispensa apresentação. É um dispositivo de telecomunicações que entrou paulatinamente nas vidas das pessoas, seja no lazer, no exercícios das suas profissões, em situações de emergência, em teatro de guerra, num infindável número de situações, e que foi simplesmente planeado para transmitir sons por meio de sinais elétricos em condutores próprios para o efeito (vias telefónicas). Por definição, é um aparelho eletroacústico que permite a transformação, no ponto emissor, de energia acústica em energia elétrica e, no ponto recetor, a transformação da energia elétrica em acústica, permitindo assim a troca de informações (falada e ouvida) entre dois ou mais assinantes. Ora, a ideia de Power over Ethernet (PoE) teve, forçosamente, seu marco nos finais do século XIX, quando Alexander Bell (“Bell Telephone Company”) teve de refletir/decidir se o telefone a instalar em cada residência, seria alimentado localmente por uma bateria (fonte de energia local), ou se deveria alimentar cada dispositivo telefónico remotamente através de fios condutores. Esta é a noção de Power over Ethernet na sua vanguarda de aplicação no início do século XXI, e objeto de uma breve apresentação, à qual o convido à leitura das restantes secções.
Resumo:
Dissertação para obtenção do grau de Mestre em Engenharia Electrotécnica Ramo de Energia
Resumo:
A large part of power dissipation in a system is generated by I/O devices. Increasingly these devices provide power saving mechanisms to inter alia enhance battery life. While I/O device scheduling has been studied in the past for realtime systems, the use of energy resources by these scheduling algorithms may be improved. These approaches are crafted considering a huge overhead of device transition. The technology enhancement has allowed the hardware vendors to reduce the device transition overhead and energy consumption. We propose an intra-task device scheduling algorithm for real time systems that allows to shut-down devices while ensuring the system schedulability. Our results show an energy gain of up to 90% in the best case when compared to the state-of-the-art.