950 resultados para governance challenges


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In pre-Fitzgerald Queensland, the existence of corruption was widely known but its extent and modes of operation were not fully evident. The Fitzgerald Report identified the need for reform of the structure, procedures and efficiency in public administration in Queensland. What was most striking in the Queensland reform process was that a new model for combatting corruption had been developed. Rather than rely upon a single law and a single institution, existing institutions were strengthened and new institutions were introduced to create a set of mutually supporting and mutually checking institutions, agencies and laws that jointly sought to improve governmental standards and combat corruption. Some of the reforms were either unique to Queensland or very rare. One of the strengths of this approach was that it avoided creating a single over-arching institution to fight corruption. There are many powerful opponents of reform. Influential institutions and individuals resist any interference with their privileges. In order to cause a mass exodus from an entrenched corruption system, a seminal event or defining process is needed to alter expectations and incentives that are sufficient to encourage significant numbers of individuals to desert the corruption system and assist the integrity system in exposing and destroying it. The Fitzgerald Inquiry was such an event. This article also briefly addresses methods for destroying national corruption systems where they emerge and exist.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public awareness of large infrastructure projects, many of which are delivered through networked arrangements is high for several reasons. These projects often involve significant public investment; they may involve multiple and conflicting stakeholders and can potentially have significant environmental impacts (Lim and Yang, 2008). To produce positive outcomes from infrastructure delivery it is imperative that stakeholder “buy in” be obtained particularly about decisions relating to the scale and location of infrastructure. Given the likelihood that stakeholders will have different levels of interest and investment in project outcomes, failure to manage this dynamic could potentially jeopardise project delivery by delaying or halting the construction of essential infrastructure. Consequently, stakeholder engagement has come to constitute a critical activity in infrastructure development delivered through networks. This paper draws on stakeholder theory and governance network theory and provides insights into how three multi-level networks within the Roads Alliance in Queensland engage with stakeholders in the delivery of road infrastructure. New knowledge about stakeholders has been obtained by testing a model of Stakeholder Salience and Engagement which combines and extends the stakeholder identification and salience theory and the ladder of stakeholder management and engagement. By applying this model, the broad research question: “How do governance networks engage with stakeholders?” has been addressed. A multiple embedded case study design was selected as the overall approach to explore, describe, explain and evaluate how stakeholder engagement occurred in three governance networks delivering road infrastructure in Queensland. The outcomes of this research contribute to and extend stakeholder theory by showing how stakeholder salience impacts on decisions about the types of engagement processes implemented. Governance network theory is extended by showing how governance networks interact with stakeholders. From a practical perspective this research provides governance networks with an indication of how to more effectively undertake engagement with different types of stakeholders.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Although Australia is the world’s driest continent without the complication of international borders and a generally good governance reputation, its record of water governance is very poor. This chapter considers some of the potentially general lessons that might be derived for water governance. These include: the difficulties of delineatingwater rights; the apparent preference for creating property rights in unsustainable uses of water while failing to deliver basic water rights; the inter twining of carbon and water crises; the dangers of privatising networks that form natural monopolies; the dangers of disciplinary hubris where interdisciplinary understanding is critical. It concludes by starting to address some of the water governance issues raised by globalisation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As part of a larger literature focused on identifying and relating the antecedents and consequences of diffusing organizational practices/ideas, recent research has debated the international adoption of a shareholder-value-orientation (SVO). The debate has financial economists characterizing the adoption of an SVO as performance-enhancing and thus inevitable, with behavioral scientists disputing both claims, invoking institutional differences. This study seeks to provide some resolution to the debate (and advance current understanding on the diffusion of practices/ideas) by developing a socio-political perspective that links the antecedents and consequences of an SVO. In particular, we introduce the notion of misaligned elites and misfitted practices in our analysis of how and why differences in the technical and cultural preferences of major owners will influence a firm’s adoption and (un)successful implementation of an SVO among the largest 100 corporations in the Netherlands from 1992-2006. We conclude with a discussion of the implications of our perspective and our findings for future research on corporate governance and the diffusion of organizational practices/ideas.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The literature abounds with descriptions of failures in high-profile projects and a range of initiatives has been generated to enhance project management practice (e.g., Morris, 2006). Estimating from our own research, there are scores of other project failures that are unrecorded. Many of these failures can be explained using existing project management theory; poor risk management, inaccurate estimating, cultures of optimism dominating decision making, stakeholder mismanagement, inadequate timeframes, and so on. Nevertheless, in spite of extensive discussion and analysis of failures and attention to the presumed causes of failure, projects continue to fail in unexpected ways. In the 1990s, three U.S. state departments of motor vehicles (DMV) cancelled major projects due to time and cost overruns and inability to meet project goals (IT-Cortex, 2010). The California DMV failed to revitalize their drivers’ license and registration application process after spending $45 million. The Oregon DMV cancelled their five year, $50 million project to automate their manual, paper-based operation after three years when the estimates grew to $123 million; its duration stretched to eight years or more and the prototype was a complete failure. In 1997, the Washington state DMV cancelled their license application mitigation project because it would have been too big and obsolete by the time it was estimated to be finished. There are countless similar examples of projects that have been abandoned or that have not delivered the requirements.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In pre-Fitzgerald Queensland, the existence of corruption was widely known but its extent and modes of operation were not fully evident. The Fitzgerald Report identified the need for reform of the structure, procedures and efficiency in public administration in Queensland. What was most striking in the Queensland reform process was that a new model for combating corruption had been developed. Rather than rely upon a single law and a single institution, existing institutions were strengthened and new institutions were instituted to create a set of mutually supporting and mutually checking institutions, agencies and laws that jointly sought to improve governmental standards and combat corruption. Some of the reforms were either unique to Queensland or very rare. One of the strengths of this approach was that it avoided creating a single overarching institution to fight corruption. There are many powerful opponents of reform. Influential institutions and individuals resist any interference with their privileges. In order to cause a mass exodus from an entrenched corruption system, a seminal event or defining process is needed to alter expectations and incentives that are sufficient to encourage significant numbers of individuals to desert the corruption system and assist the integrity system in exposing and destroying it. The Fitzgerald Inquiry was such an event. The article also briefly addresses methods for destroying national corruption system where they emerge and exist.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The very act of withdrawing dialysis places renal nurses in a unique practice setting requiring a sudden shift in care delivery from one of providing Ife-sustaining, active treatment to that of palliation. The impact of this act on the renal nurse remains largely invisible. Minimal research has been conducted that explores the significant issues and challenges that exist for renal nurses in the delivery of palliation following withdrawal of dialysis treatment. This paper attempts to highlight the issues and challenges that do exist for renal nurses in providing palliation and the subsequent lack of available research knowledge to inform practice in the renal setting. It recommends further research be conducted into the renal setting so as to inform the development of appropriate education to support renal nurses practice in the future.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Historically, cities as urban forms have been critical to human development. In 1950, 30% of the world’s population lived in major cities. By the year 2000 this had increased to 47% with further expected growth to 50% by the end of 2007. Projections suggest that city-based densities will edge towards 60% of the global total by 2030. Such rapidly increasing urbanisation, in both developed and developing economies, challenges options for governance and planning, as well as crisis and disaster management. A common issue to the livability of cities as urban forms through time has been access to clean and reliable water supply. This is an issue that is particularly important in countries with arid ecosystems, such as Australia. This paper examines preliminary aspects, and theoretical basis, of a study into the resilience of the (potable) water supply system in Southeast Queensland (SEQ), an area with one of the most significant urban growth rates in Australia. The first stage will be to assess needs and requirements for gauging resilience characteristics of a generic water supply system, consisting of supply catchment, storage reservoir/s and treatment plant/s. The second stage will extend the analysis to examine the resilience of the SEQ water supply system incorporating specific characteristics of the SEQ water grid made increasingly vulnerable due to climate variability and projected impacts on rainfall characteristics and compounded by increasing demands due to population growth. Longer-term findings will inform decision making based on the application of the concept of resilience to designing and operating stand-alone and networked water supply infrastructure systems as well as its application to water resource systems more generally.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The extant literature suggests that community participation is an important ingredient for the successful delivery of post-disaster housing reconstruction projects. Even though policy-makers, international funding bodies and non-governmental organisations broadly appreciate the value of community participation, post-disaster reconstruction practices systematically fail to follow, or align with, existing policy statements. Research into past experiences has led many authors to argue that post-disaster reconstruction is the least successful physically visible arena of international cooperation. Why is the principle of community participation not evident in the veracity of reconstructions already carried out on the ground? This paper discusses and develops the concepts of, and challenges to, community participation and the subsequent negative and positive effects on post-disaster reconstruction projects outcomes.