821 resultados para environmental management strategies
Resumo:
Waste management and minimisation is considered to be an important issue for achieving sustainability in the construction industry. Retrofit projects generate less waste than demolitions and new builds, but they possess unique features and require waste management approaches that are different to traditional new builds. With the increasing demand for more energy efficient and environmentally sustainable office spaces, the office building retrofit market is growing in capital cities around Australia with a high level of refurbishment needed for existing aging properties. Restricted site space and uncertain delivery process in these projects make it a major challenge to manage waste effectively. The labour-intensive nature of retrofit projects creates the need for the involvement of small and medium enterprises (SMEs) as subcontractors in on-site works. SMEs are familiar with on-site waste generation but are not as actively motivated and engaged in waste management activities as the stakeholders in other construction projects in the industry. SMEs’ responsibilities for waste management in office building retrofit projects need to be identified and adapted to the work delivery processes and the waste management system supported by project stakeholders. The existing literature provides an understanding of how to manage construction waste that is already generated and how to increase the waste recovery rate for office building retrofit projects. However, previous research has not developed theories or practical solutions that can guide project stakeholders to understand the specific waste generation process and effectively plan for and manage waste in ongoing project works. No appropriate method has been established for the potential role and capability of SMEs to manage and minimise waste from their subcontracting works. This research probes into the characteristics of office building retrofit project delivery with the aim to develop specific tools to manage waste and incorporate SMEs in this process in an appropriate and effective way. Based on an extensive literature review, the research firstly developed a questionnaire survey to identify the critical factors of on-site waste generation in office building retrofit projects. Semi-structured interviews were then utilised to validate the critical waste factors and establish the interrelationships between the factors. The interviews served another important function of identifying the current problems of waste management in the industry and the performance of SMEs in this area. Interviewees’ opinions on remedies to the problems were also collected. On the foundation of the findings from the questionnaire survey and semi-structured interviews, two waste planning and management strategies were identified for the dismantling phase and fit-out phase of office building retrofit projects, respectively. Two models were then established to organize SMEs’ waste management activities, including a work process-based integrated waste planning model for the dismantling phase and a system dynamics model for the fit-out phase. In order to apply the models in real practice, procedures were developed to guide SMEs’ work flow in on-site waste planning and management. In addition, a collaboration framework was established for SMEs and other project stakeholders for effective waste planning and management. Furthermore, an organisational engagement strategy was developed to improve SME waste management practices. Three case studies were conducted to validate and finalise the research deliverables. This research extends the current literature that mostly covers waste management plans in new build projects, by presenting the knowledge and understanding of addressing waste problems in retrofit projects. It provides practical tools and guidance for industry practitioners to effectively manage the waste generation processes in office building retrofit projects. It can also promote industry-level recognition of the role of SMEs and their performance in on-site waste management.
Resumo:
Background: Bicycle commuting in an urban environment of high air pollution is known as a potential health risk, especially for susceptible individuals. While risk management strategies aimed to reduce motorised traffic emissions exposure have been suggested, limited studies have assessed the utility of such strategies in real-world circumstances. Objectives: The potential of reducing exposure to ultrafine particles (UFP; < 0.1 µm) during bicycle commuting by lowering interaction with motorised traffic was investigated with real-time air pollution and acute inflammatory measurements in healthy individuals using their typical, and an alternative to their typical, bicycle commute route. Methods: Thirty-five healthy adults (mean ± SD: age = 39 ± 11 yr; 29% female) each completed two return trips of their typical route (HIGH) and a pre-determined altered route of lower interaction with motorised traffic (LOW; determined by the proportion of on-road cycle paths). Particle number concentration (PNC) and diameter (PD) were monitored in real-time in-commute. Acute inflammatory indices of respiratory symptom incidence, lung function and spontaneous sputum (for inflammatory cell analyses) were collected immediately pre-commute, and one and three hours post-commute. Results: LOW resulted in a significant reduction in mean PNC (1.91 x e4 ± 0.93 x e4 ppcc vs. 2.95 x e4 ± 1.50 x e4 ppcc; p ≤ 0.001). Besides incidence of in-commute offensive odour detection (42 vs. 56 %; p = 0.019), incidence of dust and soot observation (33 vs. 47 %; p = 0.038) and nasopharyngeal irritation (31 vs. 41 %; p = 0.007), acute inflammatory indices were not significantly associated to in-commute PNC, nor were these indices reduced with LOW compared to HIGH. Conclusions: Exposure to PNC, and the incidence of offensive odour and nasopharyngeal irritation, can be significantly reduced when utilising a strategy of lowering interaction with motorised traffic whilst bicycle commuting, which may bring important benefits for both healthy and susceptible individuals.
Resumo:
Despite significant research, there is still little agreement over how to define safety culture or of what it is comprised. Due to this lack of agreement, much of the safety culture research has little more than safety management strategies in common. There is, however, a degree of acceptance of the close relationship between safety culture and organisational culture. Organisational culture can be described using traditional views of culture drawn from the anthropology and cultural psychology literature. However, the safety culture literature rarely ventures beyond organisational culture into discussions of these more traditional concepts of culture. There is a need to discuss how these concepts of culture can be applied to safety culture to provide greater understanding of safety culture and additional means by which to approach safety in the workplace. This review explores how three traditional conceptualisations of culture; the normative, anthropological and pragmatist conceptualisations, can and have been be applied to safety culture. Finally the review proposes a synthesised conceptualisation of safety culture which can be used to provide greater depth and practical applicability of safety culture, by increasing our understanding of the interactions between cultural and contextual variables in a given workplace and the effect they have on safety.
Resumo:
This original study creates a philosophy of regeneration reuse, which is a conceptual framework that utilises construction and demolition waste products by building component, relocation and adaptive reuse. Case studies from the greater Brisbane, wider southeast Queensland region and greater London area are used to demonstrate the principles of regeneration reuse through research activities, analysis and evaluation. The regeneration reuse conceptual process draws upon assessing embodied carbon and sustainable benefits to deconstruct rather than destruct, and consider alternative options to waste treatment technologies in the built environment. The importance of waste management is examined, specifically the impacts of governance to the principles of regeneration reuse through analysis of legislation in the Australian and UK jurisdictions. Design process considerations when incorporating the principles of regeneration reuse are defined, and phasing and staging assessment explored to determine the most effective point of intervention in the design process to include waste management strategies.
Resumo:
Recent experimental evidence has shown that learning occurs in the host selection behaviour of Helicoverpa armigera (Hübner), one of the world‘s most important agricultural pests. This paper discusses how the occurrence of learning changes our understanding of the host selection behaviour of this polyphagous moth. Host preferences determined from previous laboratory studies may be vastly different from preferences exhibited by moths in the field, where the abundance of particular hosts may be more likely to determine host preference. In support of this prediction, a number of field studies have shown that the ‘attractiveness’ of different hosts for H. armigera oviposition may depend on the relative abundance of these host species. Insect learning may play a fundamental role in the design and application of present and future integrated pest management strategies such as the use of host volatiles, trap crops and resistant crop varieties for monitoring and controlling this important pest species
Resumo:
An estuary is formed at the mouth of a river where the tides meet a freshwater flow and it may be classified as a function of the salinity distribution and density stratification. An overview of the broad characteristics of the estuaries of South-East Queensland(Australia) is presented herein, where the small peri-urban estuaries may provide an useful indicator of potential changes which might occur in larger systems with growing urbanisation. Small peri-urban estuaries exhibits many key hydrological features and associated with ecosystem types of larger estuaries, albeit at smaller scales, often with a greater extent of urban development as a proportion of catchment area. We explore the potential for some smaller peri-urban estuaries to be used as natural laboratories to gain some much needed information on the estuarine processes, although any dynamics similarity is presently limited by critical absence of in-depth physical investigation in larger estuarine systems. The absence of the detailed turbulence and sedimentary data hampers the understanding and modelling of the estuarine zones. The interactions between the various stake holders are likely to define the vision for the future of South-East Queensland's peri-urban estuaries. This will require a solid understanding of the bio-physical function and capacity of the peri-urban estuaries. Based upon the knowledge gap, it is recommended that an adaptive trial and error approach be adopted for the future of investigation and management strategies.
Resumo:
Emergency management and climate change adaptation will increasingly challenge all levels of government because of three main factors. First, Australia is extremely vulnerable to the impacts of climate change, particularly through the increasing frequency, duration and/or intensity of disasters such as floods and bushfires. Second, the system of government that divides powers by function and level can often act as a barrier to a well-integrated response. Third, policymaking processes struggle to cope with such complex inter-jurisdictional issues. This paper discusses these factors and explores the nature of the challenge for Australian governments. Investigations into the 2009 Victorian bushfires, the 2011 Perth Hills bushfires, and the 2011 Brisbane floods offer an indication of the challenges ahead and it is argued that there is a need to: improve community engagement and communication; refocus attention on resilience; improve interagency communication and collaboration; and, develop institutional arrangements that support continual improvement and policy learning. These findings offer an opportunity for improving responses as well as a starting point for integrating disaster risk management and climate change adaptation policies. The paper is based on the preliminary findings of an NCCARF funded research project: The Right Tool for the Job: Achieving climate change adaptation outcomes through improved disaster management policies, planning and risk management strategies involving Griffith University and RMIT. It should be noted from the outset that the purpose of this research project is not to criticise the actions of emergency service workers and volunteers who do an incredible job under extreme circumstances, often risking their own lives in the process. The aim is simply to offer emergency management agencies the opportunity to step back and rethink their overall approach to the challenge they face in the light of the impacts of climate change.
Resumo:
This thesis explored the current state of knowledge management in policing. A psychometric instrument was created and validated for use within police agencies as a means of facilitating the capture and transferral of critical investigative knowledge. The aim is to ensure that investigative expertise is not lost when detectives retire or leave the service. Improved knowledge management strategies that rely on this psychometric instrument can lead to greater efficiency and effectiveness in criminal investigation.
Resumo:
Emergency management and climate change adaptation will increasingly challenge all levels of government because of three main factors. First, Australia is extremely vulnerable to the impacts of climate change, particularly through the increasing frequency and/or intensity of disasters such as floods and bushfires. Second, the system of government that divides powers by function and level can often act as a barrier to a well-integrated response. Third, policymaking processes struggle to cope with such complex inter-jurisdictional issues. This paper discusses these factors and explores the nature of the challenge for Australian governments. Investigations into the 2009 Victorian bushfires, the 2011 Perth Hills bushfires, and the 2011 Brisbane floods offer an indication of the challenges ahead and it is argued that there is a need to: improve community engagement and communication; refocus attention on resilience; improve interagency communication and collaboration; and, develop institutional arrangements that support continual improvement and policy learning. These findings offer an opportunity for improving responses as well as a starting point for integrating disaster risk management and climate change adaptation policies. The paper is based on the preliminary findings of an NCCARF funded research project: The Right Tool for the Job – Achieving climate change adaptation outcomes through improved disaster management policies, planning and risk management strategies involving Griffith University and RMIT.
Resumo:
The cycling interaction between climate change and buildings is of dynamic nature. On one hand, buildings have contributed significantly to the process of human‐induced climate change. On the other hand, climate change is also expected to impact on many aspects of buildings, including building design, construction, and operation. In this entry, these two aspects of knowledge are reviewed. The potential strategies of building design and operation to reduce the greenhouse gas emissions from buildings and to prepare the buildings to withstand a range of possible climate change scenarios are also discussed.
Resumo:
The movement of exotic biota into native ecosystems are central to debates about the acclimatisation of plants in the settler colonies of the nineteenth century. For example, plants like lucerne from Europe and sudan grass from South Africa were transferred to Australia to support pastoral economies. The saltbush Atriplex spp. is an anomaly-it too, eventually, became the subject of acclimatisation within its native Australia because it was also deemed useful to the pastoralists of arid and semi-arid New South Wales. When settlers first came to this part of Australia, however, initial perceptions were that the plants were useless. We trace this transformation from the desert 'desperation' plant during early settlement to the 'precious' conservation species, from the 1880s, when there were changes in both management strategies and cultural responses to saltbush in Australia. This reconsideration can be seen in scientific assessments and experiments, in the way that it was commoditised by seeds and nursery traders, and in its use as a metaphor in bush poetry to connote a gendered nationalist figure in Saltbush Bill. We argue that while initial settlers were often so optimistic about European management techniques, they had nothing but contempt for indigenous plants. The later impulses to the conservation of natives arose from experiences of bitter failure and despair over attempts to impose European methods, which in turn forced this re-evaluation of Australian species.
Resumo:
Human Resources (HR) policies and practices have changed due to global environmental instability. These policies and practices are key factors for successful environmental management. Using the Theory of Planned Behaviour, this article aims to understand the critical factors which influence senior management’s decision to adopt ‘green’ HR practices. Data were collected from 210 organisations in Australia using two separate surveys. Survey one, which was addressed directly to HR managers and directors, contained questions relating to HR policies (the dependent variables), while survey two, which was addressed directly to CEOs and senior managers, contained questions about environmental-related attitudes, subjective norms and perceived control (the independent variables). Results indicated that senior management’s environmental-related attitudes, subjective norms from stakeholders and perceived green resource readiness influenced their decision to adopt green HR initiatives. However, attitudes and green resource readiness in particular had greater impacts than subjective norms. Limitations, implications and future research are also outlined.
Resumo:
Public engagement is a defining feature of collaborative approaches to environmental management (Petts 2006, Whelan and Oliver 2005). Public engagement in this context is focused on incorporating residents and communities of interest in activities like ecological restoration, catchment management, and environmental conservation in a wide range of situations (Nelson and Pettit 2004, Petts 2007). Some authors consider public engagement to be a sign of healthy democratic functioning in society (Skocpol and Fiorina 1999). Others draw attention to overcoming widely noted practical limitations of top-down mechanisms, emphasising that public engagement results in programs being implemented more effectively (Broderick 2005, Leach et al. 1999).
Resumo:
Ecological principles have been employed to assist in the sustainability of a suite of 'gateway' marinas currently being developed in Queensland. Tasks included (a) location and fostering of core remnant native vegetation areas, (b) understanding the dynamic patterns of region behaviour using the ecological strategies employed by key flora and fauna species, (c) promoting those native wildlife species best characterising the region, and (d) allocating management actions along elongated buffer zones to the catchment headwaters (rather than only peripheral to the property). The design of infrastructure and its relationship to sustainable landscape development is lacking such a response int eh planning and detailing of new marinas. This paper distinguishes between the practice of landscape ecology and the design of ecological landscapes, offering examples of the principles of the latter in support of the concept of ecological landscape practice.