984 resultados para construction operations
Resumo:
In the face of increasing concern over global warming and climate change, interest in the utilizzation of solar energy for building operations is rapidly growing. In this entry, the importance of using renewable energy in building operations is first introduced. This is followed by a general overview on the energy from the sun and the methods to utilize solar energy. Possible applications of solar energy in building operations are then discussed, which include the use of solar energy in the forms of daylighting, hot water heating, space heating and cooling, and building-integrated photovoltaics.
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.
Resumo:
The construction industry should be a priority to all governments because it impacts economically and socially on all citizens. Sector turnover in industrialised economies typically averages 8-12% of GDP. Further, construction is critical to economic growth. Recent Australian studies estimate that a 10% gain in efficiency in construction translates to a 2.5% increase in GDP ----- ----- Inefficiencies in the Australian construction industry have been identified by a number of recent studies modelling the building process. They have identified potential savings in time of between 25% and 40% by reducing non-value added steps in the process. A culture of reform is now emerging in the industry – one in which alternate forms of project delivery are being trial. ----- ----- Government and industry have identified Alliance Contracting as a means to increase efficiency in the construction industry as part of a new innovative procurement environment. Alliance contracting requires parties to form relationships and work cooperatively to provide a more complete service. This is a significant cultural change for the construction industry, with its well-known adversarial record in traditional contracting. Alliance contracts offer enormous potential benefits, but the Australian construction industry needs to develop new skills to effectively participate in the new relationship environment. ----- ----- This paper describes a collaborative project identifying skill needs for clients and construction professionals to more effectively participate in an increasingly sophisticated international procurement environment. The aim of identifying these skill needs is to assist industry, government, and skill developers to prepare the Australian construction workforce for the future. The collaborating Australian team has been fortunate to secure the Australian National Museum in Canberra as its live case study. The Acton Peninsula Development is the first major building development in the world awarded on the basis of a joint alliance contract.
Resumo:
Although relatively few studies have been undertaken analyzing the drivers of performance for construction companies in producing and delivering satisfactory quality of project works, findings from previous research reveal that there is a significant correlation between the company’s organisational culture and the quality performance of contractors. It has also been noted that the nature of organisational culture is a major determinant factor for quality improvement. This paper presents a summary of the results of a pilot study investigating the organisational culture profiles of five Indonesian construction companies. The survey utilizes the Organisational Culture Assessment Instrument (OCAI), which is based on the Competing Values Framework (CVF). This instrument assesses six important and significant traits of organisational culture: dominant characteristics, organisational leadership, management of employees, organisational ‘glue’, strategic emphasis, and criteria of success. These assessed cultural dimensions identify the most close-fitting perspective of a company’s inherent culture drawn from four possible types: clan, adhocracy, market, or hierarchy culture. Further discussion is presented, which describes the companies’ dominant cultural profiles in terms of strength and congruence and how an effective quality management system operates within the dominant culture type. This analysis contributes to the finding that a suitably ‘strong’ organisational culture impacts positively on construction organisation success within its own specific sector.
Resumo:
Building construction is a highly competitive and risky business. This competitiveness is compounded where conflicting objectives amongst contracting and subcontracting firms set the stage for an adversarial and potentially destructive business relationship. Clients, especially those from the public sector, need broader tender evaluation criteria to complement the traditional focus on bid price. There is also a need for change in the construction industry—not only to a more cooperative approach between the constructing parties—but also from a confrontationist attitude to a more harmonious relationship between all stakeholders in providing constructed facilities. A strategic alliance is a cooperative relationship between two or more organisations that forms part of their overall strategies, and contributes to achieving their major goals and objectives. Strategic alliances in building construction may provide a useful tool to assist public sector construction managers evaluate tenders and concurrently encourage more cooperative relationships amongst construction stakeholders. This paper begins with an overview of the Australian building construction industry, then reviews the existing strategic alliance literature and describes an analysis framework comprising six attributes of strategic alliances for application to construction organisations—trust, commitment, interdependence, cooperation, communication, and joint problem solving. These attributes are currently being used to collect data from 70 building construction firms in Queensland to assess their respective levels of strategic alliance. Given the trend towards broader indicators of construction firm performance, these attributes are proposed as a tool for use in the tender evaluation process for public works.
Resumo:
This paper outlines how the project agreement operating on the Australian National Museum project in Canberra, Australia facilitated a responsible and responsive workplace environment for construction workers. A project alliancing approach was adopted and designed to encourage industrial relations innovation in the workplace. The trigger for this approach was the perceived success of the alliancing working arrangements between key project delivery teams and a desire to extend this arrangement to subcontractors, suppliers and the workforce. Changes in the Australian workplace relations environment and introduction of a national code of practice for the Australian construction industry provided impetus for reaching a new type of workplace agreement. The workplace culture and characteristics of relationships formed between workers and management on that site shaped the agreed terms and conditions of work. It also spurred the pursuit of innovative approaches to project delivery from a technology, management and workplace culture perspective.
Resumo:
In an environment where economic, political and technological change is the rule, a fundamental business strategy should be the defence of traditional markets and thoughtful entry into new markets, with an aim to increase market penetration and stimulate profit. The success of such a strategy will depend on the success of firms to do more and better for customers than their competitors. In other words, the firm’s primary competitive advantage will come from changes they implement to please their customers. In the construction industry, complexity of technical knowledge and construction processes have traditionally encouraged clients to play a largely passive role in the management of their project. However, today’s clients not only want to know about internal efficiency of their projects but also need to know how they and their contractors compare and compete against their competitors. Given the vulnerability of construction activities in the face of regional financial crisis, constructors need to be proactive in the search to improve their internal firm and project processes to ensure profitability and market responsiveness. In this context, reengineering is a radical design that emphasises customer satisfaction rather than cost reduction This paper discusses the crucial role of the client-project interface and how project networks could facilitate and improve information dissemination and sharing, collaborative efforts, decision-making and improved project climate. An intra-project network model is presented, and project managers’ roles and competencies in forming and coordinating project workgroups is discussed.
Resumo:
Pragmatic construction professionals, accustomed to intense price competition and focused on the bottom line, have difficulty justifying investments in advanced technology. Researchers and industry professionals need improved tools to analyze how technology affects the performance of the firm. This paper reports the results of research to begin answering the question, “does technology matter?” The researchers developed a set of five dimensions for technology strategy, collected information regarding these dimensions along with four measures of competitive performance in five bridge construction firms, and analyzed the information to identify relationships between technology strategy and competitive performance. Three technology strategy dimensions—competitive positioning, depth of technology strategy, and organizational fit—showed particularly strong correlations with the competitive performance indicators of absolute growth in contract awards and contract award value per technical employee. These findings indicate that technology does matter. The research also provides ways to analyze options for approaching technology and ways to relate technology to competitive performance for use by managers. It also provides a valuable set of research measures for technology strategy.
Resumo:
The building and construction sector is one of the five largest contributors to the Australian economy and is a key performance component in the economy of many other jurisdictions. However, the ongoing viability of this sector is increasingly reliant on its ability to foster and transfer innovated products and practices. Interorganisational networks, which bring together key industry stakeholders and facilitate the flows of information, resources and trust necessary to secure innovation, have emerged as a key growth strategy within this and other arenas. The blending of organisations, resources and purposes creates new, hybrid institutional forms that draw on a mix of contract, structure and interpersonal relationship as integration processes. This paper argues that hybrid networked arrangements, because they incorporate relational elements, require management strategies and techniques that not always synonymous with conventional management approaches, including those used within the building and construction sector. It traces the emergence of the Construction Innovation Project in Australia as a hybrid institutional arrangement moulding public, private and academic stakeholders of the building and construction industry into a coherent collective force aimed at fostering innovation and its application within all levels of the industry. Specifically, the paper examines the Construction Innovation Project to ascertain the impact of relational governance and its management to harness and leverage the skills, resources and capacities of members to secure innovative outcomes. Finally, the paper offers some prospects to guide the ongoing work of this body and any other charged with a similar integrative responsibility.
Resumo:
Freeways are divided roadways designed to facilitate the uninterrupted movement of motor vehicles. However, many freeways now experience demand flows in excess of capacity, leading to recurrent congestion. The Highway Capacity Manual (TRB, 1994) uses empirical macroscopic relationships between speed, flow and density to quantify freeway operations and performance. Capacity may be predicted as the maximum uncongested flow achievable. Although they are effective tools for design and analysis, macroscopic models lack an understanding of the nature of processes taking place in the system. Szwed and Smith (1972, 1974) and Makigami and Matsuo (1990) have shown that microscopic modelling is also applicable to freeway operations. Such models facilitate an understanding of the processes whilst providing for the assessment of performance, through measures of capacity and delay. However, these models are limited to only a few circumstances. The aim of this study was to produce more comprehensive and practical microscopic models. These models were required to accurately portray the mechanisms of freeway operations at the specific locations under consideration. The models needed to be able to be calibrated using data acquired at these locations. The output of the models needed to be able to be validated with data acquired at these sites. Therefore, the outputs should be truly descriptive of the performance of the facility. A theoretical basis needed to underlie the form of these models, rather than empiricism, which is the case for the macroscopic models currently used. And the models needed to be adaptable to variable operating conditions, so that they may be applied, where possible, to other similar systems and facilities. It was not possible to produce a stand-alone model which is applicable to all facilities and locations, in this single study, however the scene has been set for the application of the models to a much broader range of operating conditions. Opportunities for further development of the models were identified, and procedures provided for the calibration and validation of the models to a wide range of conditions. The models developed, do however, have limitations in their applicability. Only uncongested operations were studied and represented. Driver behaviour in Brisbane was applied to the models. Different mechanisms are likely in other locations due to variability in road rules and driving cultures. Not all manoeuvres evident were modelled. Some unusual manoeuvres were considered unwarranted to model. However the models developed contain the principal processes of freeway operations, merging and lane changing. Gap acceptance theory was applied to these critical operations to assess freeway performance. Gap acceptance theory was found to be applicable to merging, however the major stream, the kerb lane traffic, exercises only a limited priority over the minor stream, the on-ramp traffic. Theory was established to account for this activity. Kerb lane drivers were also found to change to the median lane where possible, to assist coincident mergers. The net limited priority model accounts for this by predicting a reduced major stream flow rate, which excludes lane changers. Cowan's M3 model as calibrated for both streams. On-ramp and total upstream flow are required as input. Relationships between proportion of headways greater than 1 s and flow differed for on-ramps where traffic leaves signalised intersections and unsignalised intersections. Constant departure onramp metering was also modelled. Minimum follow-on times of 1 to 1.2 s were calibrated. Critical gaps were shown to lie between the minimum follow-on time, and the sum of the minimum follow-on time and the 1 s minimum headway. Limited priority capacity and other boundary relationships were established by Troutbeck (1995). The minimum average minor stream delay and corresponding proportion of drivers delayed were quantified theoretically in this study. A simulation model was constructed to predict intermediate minor and major stream delays across all minor and major stream flows. Pseudo-empirical relationships were established to predict average delays. Major stream average delays are limited to 0.5 s, insignificant compared with minor stream delay, which reach infinity at capacity. Minor stream delays were shown to be less when unsignalised intersections are located upstream of on-ramps than signalised intersections, and less still when ramp metering is installed. Smaller delays correspond to improved merge area performance. A more tangible performance measure, the distribution of distances required to merge, was established by including design speeds. This distribution can be measured to validate the model. Merging probabilities can be predicted for given taper lengths, a most useful performance measure. This model was also shown to be applicable to lane changing. Tolerable limits to merging probabilities require calibration. From these, practical capacities can be estimated. Further calibration is required of traffic inputs, critical gap and minimum follow-on time, for both merging and lane changing. A general relationship to predict proportion of drivers delayed requires development. These models can then be used to complement existing macroscopic models to assess performance, and provide further insight into the nature of operations.