911 resultados para Small construction firms
Resumo:
Construction of a bispecific single-chain antibody derivative is described that consists of two different single-chain Fv fragments joined through a Gly-Ser linker. One specificity of the two Fv fragments is directed against the CD3 antigen of human T cells and the other is directed against the epithelial 17-1A antigen; the latter had been found in a clinical trial to be a suitable target for antibody therapy of minimal residual colorectal cancer. The construct could be expressed in CHO cells as a fully functional protein, while its periplasmic expression in Escherichia coli resulted in a nonfunctional protein only. The antigen-binding properties of the bispecific single-chain antibody are indistinguishable from those of the corresponding univalent single-chain Fv fragments. By redirecting human peripheral T lymphocytes against 17-1A-positive tumor cells, the bispecific antibody proved to be highly cytotoxic at nanomolar concentrations as demonstrated by 51Cr release assay on various cell lines. The described bispecific construct has a molecular mass of 60 kDa and can be easily purified by its C-terminal histidine tail on a Ni-NTA chromatography column. As bispecific antibodies have already been shown to be effective in vivo in experimental tumor systems as well as in phase-one clinical trials, the small CD3/17-1A-bispecific antibody may be more efficacious than intact antibodies against minimal residual cancer cells.
Resumo:
This paper defines a sustainable energy plan to provide the basis for renewable energy initiatives that will increase energy security, reduce negative economic impacts and provide a cleaner environment. The hotel, agriculture, transportation, construction, utility, government and private sectors will play pivotal roles in achieving targets and will see significant gains. Government policies, educational campaigns and financial incentives will be required to facilitate and encourage renewable energy development and entrepreneurship. Utilization of solar energy, energy conservation measures and the use of efficient and alternative fuel vehicles by the commercial/industrial and private sectors will be crucial in meeting targets. The utility company will be charged with developing large scale renewable energy applications and with improving efficiency of the electrical system.
Resumo:
Nowadays, on a global level, the Higher Education System has a complex and broad horizon of curricular tools to use in the teaching and learning process. In addition to these new educational instruments, full of possibilities, we face specific socio-economic conditions that affect in a significantly way the Curriculum Development in certain knowledge areas (areas traditionally built on a methodology based on a physical presence of students in the classroom). Some areas such as Restoration, Rehabilitation or Construction Pathologies, and the construction sector in general, require very defined and particular knowledge that only a small number of experts claim as specialized training. All these aspects condition the teaching methodology performed in a physical classroom at a university campus (the only option used until recent years) and made us consider the integration of online teaching in these areas too. The present work shows the teaching methodology used for the development of two online courses, where we offer distance learning for "highly specialized" formation in the Edification area (an area where traditionally there was only classroom training). At the beginning, both courses were designed by classroom training, but got a really small number of applications due to the specialized topic proposed. Later, we proposed a "Curriculum Redesign" of the contents, offering an online modality, which implied a significant demand both within and outside the university area. A notable feature of this educational experience is the great spectrum opened for attendees of both courses in the online version. This situation improved significantly the "Curriculum Development" for the student and implied an interesting new proposal on the offered contents and materials (what would have been really difficult to get in a face to face classroom). In conclusion, the absence of certain types of specialized contents in the academic university curricula makes essential to raise new methodologies to save the gap in this area through additional training courses as those analyzed in this paper. Thus, our experience opens a debate on the appropriateness of implementing online training in relation to the face to face training in constructive content subjects and, especially, presents a new scheme, not without controversy, for the curriculum design.
Resumo:
As BIM adoption continues, the goal of a totally collaborative model with multiple contributors is attainable. Many initiatives such as the 2016 UK government level 2 BIM deadline are putting pressure on the construction industry to speed up the changeover. Clients and collaborators have higher expectations of using digital 3D models to communicate design ideas and solve practical problems. Contractors and clients are benefitting from cost saving scheduling and clash detection offered by BIM. Effective collaboration on the project will also give speed and efficiency gains. Despite this, many businesses of varying sizes are still having problems. The cost of the software and the training provides an obvious barrier for micro-enterprises and could explain a delay in adoption. Many studies have looked at these problems faced by SME and micro-enterprises. Larger companies have different problems. The efforts made by government to encourage them are quite comprehensive, but is anything being done to help smaller sectors and keep the industry cohesive? This limited study examines several companies of varying size and varying project type: architectural design businesses, main contractor, structural engineer and building consultancy. The study examines the barriers to a truly collaborative BIM workflow facing different specialities on a larger project and a contrasting small/medium project. The findings will establish that different barriers for each sector are actually pushing further apart, thus potentially creating a BIM-only construction elite, leaving the small companies remaining on 2D based drawing.
Resumo:
The UK construction industry comprises a very high proportion of SMEs that is companies employing up to 250. A Department for Business, Innovation and Skills research paper, found that SMEs had a 71.2% share of work in the construction industry. Micro and small firms (i.e. those employing up to 50) had a share of 46.7% of work (Ive and Murray 2013). The Government has high ambitions for UK construction. Having been found by successive government commissioned studies to be inefficient and highly fragmented, ambitious targets have been set for the industry to achieve 33% reduction in costs and 50% faster delivery by 2025. As a significant construction client, the Government has mandated the use of Level 2 BIM from 2016 on publicly funded projects over £5 million. The adoption of BIM plays a key role in the 2025 vision but a lack of clarity persists in the industry over BIM and significant barriers are perceived to its implementation, particularly amongst SMEs. However, industry wide transformation will be challenging without serious consideration of the capabilities of this large majority. Many larger firms, having implemented Level 2 BIM are now working towards Level 3 BIM while many of the smaller firms in the industry have not even heard of BIM. It would seem that fears of a ‘two tier’ industry are perhaps being realised. This paper builds on an earlier one (Mellon & Kouider 2014) and investigates, through field work, the level of Level 2 BIM implementation amongst SMEs compared to a large organisation. Challenges and innovative solutions identified through collected data are fully discussed and compared. It is suggested that where the SME perceives barriers towards adoption of the technologies which underpin BIM, they may consider collaborative methods of working as an interim step in order to work towards realising the efficiencies and benefits that these methods can yield. While the barriers to adoption of BIM are significant, it is suggested that they are not insurmountable for the SME and some recommendations for possible solutions are made.
Resumo:
In this chapter we center our attention on the performance drivers of family firms in Switzerland and Germany and compare the corresponding results with the findings generated in the US. Investigating family firms is justified as this organizational form not only constitutes the majority of all firms globally (Sharma and Carney, 2012), but in particular in Switzerland and Germany. In fact, more than 88 percent of all firms in Switzerland are defined as family firms (Frey, Halter, Klein, and Zellweger, 2004), and numbers for Germany are similar (Klein, 2000). While more than 99 percent of all companies in Switzerland are small and medium-sized (Frey et al., 2004), the share of family firms varies with firm size; more specifically, the share of family firms decreases with increasing firm size, which is in line with findings from Germany (Klein, 2000). The social and economic impact of family firms is remarkable. In Germany for instance, family controlled firms provide 60 percent of all jobs and account for 51 percent of the total sales of the German economy (cf. www.familienunternehmen.de). Even though the interest of both academics and practitioners in family firms has been rising significantly in recent years, the existing body of knowledge in the field is still rather fragmented (Sharma, 2004; Sharma and Carney, 2012).
Resumo:
We apply a key construct from the entrepreneurship field, entrepreneurial orientation (EO), in the context of long-lived family firms. Our qualitative in-depth case studies show that a permanently high level of the five EO dimensions is not a necessary condition for long-term success, as traditional entrepreneurship and EO literature implicitly suggest. Rather, we claim that the level of EO is dynamically adapted over time and that the original EO scales (autonomy, innovativeness, risk taking, proactiveness, and competitive aggressiveness) do not sufficiently capture the full extent of entrepreneurial behaviors in long-lived family firms. Based on these considerations we suggest extending the existing EO scales to provide a more fine-grained depiction of firm-level corporate entrepreneurship in long-lived family firms.
Resumo:
This is a photocopy reproduction.
Resumo:
Cover title.
Resumo:
Shipping list no.: 92-056-P.
Resumo:
Mode of access: Internet.
Resumo:
The Community Development Block Grant (CDBG) Program was established by the federal Housing and Community Development Act of 1974 (Act). Administered nationally by the U.S. Department of Housing and Urban Development (HUD), the Act combined eight existing categorical programs into a single block grant program. In 1981, Congress amended the Act to allow states to directly administer the block grant for small cities. At the designation of the Governor, the Department of Commerce and Community Affairs assumed operation of the State of Illinois Community Development Block Grant -- Small Cities Program in the same year. The Illinois Block grant program is known as the Community Development Assistance Program (CDAP). Through this program, funds are available to assist Illinois communities meet their greatest economic and community development needs, with an emphasis upon helping persons of low-to-moderate income.
Resumo:
The Community Development Block Grant (CDBG) Program was established by the federal Housing and Community Development Act of 1974 (Act). Administered nationally by the U.S. Department of Housing and Urban Development (HUD), the Act combined eight existing categorical programs into a single block grant program. In 1981, Congress amended the Act to allow states to directly administer the block grant for small cities. At the designation of the Governor, the Department of Commerce and Community Affairs assumed operation of the State of Illinois Community Development Block Grant -- Small Cities Program in the same year. The Illinois Block grant program is known as the Community Development Assistance Program (CDAP). Through this program, funds are available to assist Illinois communities meet their greatest economic and community development needs, with an emphasis upon helping persons of low-to-moderate income.
Resumo:
The following activities are considered ineligible. 1. Construction of buildings, or portions thereof, used predominantly for general conduct of government (e.g. city halls, courthouses, jails, police stations, etc.) 2. General government expenses. 3. Costs of operating and maintaining public facilities and services (e.g. mowing parks and replacing street light bulbs). 4. Servicing or refinancing existing debt.