905 resultados para Residential building construction
Resumo:
Many studies have been carried out in relation to construction procurement methods. Evidence shows that there needs to be a change of culture and attitude in the construction industry, moving away from traditional adversarial relationship into cooperative and collaborative relationship. At the same time there is also an increasing concern and discussion on alternative procurement methods, drifting away from traditional procurement systems. Relational contracting approaches have become more popular in recent years, and have appeared in common forms such as partnering, alliancing and relationship management contracts. This paper reports the findings of a survey undertaken with a private organisation based on an alliance project during its design stage, identifying the critical factors that influence the success of the alliance project. Legal aspects focusing on dispute resolution in alliancing are also highlighted.
Resumo:
The design of a building is a complicated process, having to formulate diverse components through unique tasks involving different personalities and organisations in order to satisfy multi-faceted client requirements. To do this successfully, the project team must encapsulate an integrated design that accommodates various social, economic and legislative factors. Therefore, in this era of increasing global competition integrated design has been increasingly recognised as a solution to deliver value to clients.----- The ‘From 3D to nD modelling’ project at the University of Salford aims to support integrated design; to enable and equip the design and construction industry with a tool that allows users to create, share, contemplate and apply knowledge from multiple perspectives of user requirements (accessibility, maintainability, sustainability, acoustics, crime, energy simulation, scheduling, costing etc.). Thus taking the concept of 3-dimensional computer modelling of the built environment to an almost infinite number of dimensions, to cope with whole-life construction and asset management issues in the design of modern buildings. This paper reports on the development of a vision for how integrated environments that will allow nD-enabled construction and asset management to be undertaken. The project is funded by a four-year platform grant from the Engineering and Physical Sciences Research Council (EPSRC) in the UK; thus awarded to a multi-disciplinary research team, to enable flexibility in the research strategy and to produce leading innovation. This paper reports on the development of a business process and IT vision for how integrated environments will allow nD-enabled construction and asset management to be undertaken. It further develops many of the key issues of a future vision arising from previous CIB W78 conferences.
Resumo:
This conference is a landmark gathering of those from around the world concerned with the future of Built environment education and Research. It takes place at a time of great change and opportunity. Around the world the long-standing principles of what, how and who we teach for graduate entry into Built environment professions, is increasingly under review. The need for research and the way in which it is funded, conducted and knowledge shared is also under increasing pressure. Both changes are being triggered by a fast changing and increasingly challenging competitive environment for education and research. Competition for the highest quality of graduate entrants in the right numbers is becoming more intense. Competition between Universities, as funding for education and research comes under ever close scrutiny, is intensifying and we are all being forced to look for more effective and exciting ways of recruting, retaining, enhancing and maximising the achievement of our students and of our staff in their research activities. Competition amongst employees in industry is becoming more intense as professional employers increasingly recognise that people and knowledge are their key strategic resources. Universities are increasingly looking to partnerships with industry, the professions and other Universities to further improve their eduacation, research and innovation activities. These challenges are unfolding at a time of accelerating development in information technologies and systems and in our understanding of principles of knowledge management and pedagogical advancement. This environment presents both opportunities and threats to the world of education.
Resumo:
This project report presents the results of a study on wireless communication data transfer rates for a mobile device running a custombuilt construction defect reporting application. The study measured the time taken to transmit data about a construction defect, which included digital imagery and text, in order to assess the feasibility of transferring various types and sizes of data and the ICT-supported construction management applications that could be developed as a consequence. Data transfer rates over GPRS through the Telstra network and WiFi over a private network were compared. Based on the data size and data transfer time, the rate of transfer was calculated to determine the actual data transmission speeds at which the information was being sent using the wireless mobile communication protocols. The report finds that the transmission speeds vary considerably when using GPRS and can be significantly slower than what is advertised by mobile network providers. While WiFi is much faster than GPRS, the limited range of WiFi limits the protocol to residential-scale construction sites.
Resumo:
This report was commissioned by the Built Environment Industry Innovation Council and funded by the Australian Government Department of Innovation, Industry, Science and Research.
Resumo:
This paper describes a work-in-progress on developing design environments that combine wireless and mobile technologies with augmented reality to facilitate bringing context from the physical environment to the virtual models for design work. One of the challenges for designers in a variety of end-user-oriented design disciplines such as architecture and industrial design has been capturing and replaying the contextual information of the intended domain of the artifact being designed. Either the technology is decidedly low-tech, such as charcoal drawings in a sketchbook, out-of-reach, such as immersive virtual reality CAVEs, or a “make-do” with existing technologies, such as a collage of digital photos. This paper describes a novel combination of “off-the-shelf” technologies that may allow designers more capability to create models using standard computer-aided design applications and augmented reality to combine the current, physical context with the projected, digital context. We demonstrate this approach in the building design domain to address a common problem in building construction, construction defect resolution.
Resumo:
PROJECT BRIEF Information provided by the Built Environment Industry Innovation Council as background to this project includes the following information on construction and innovation within the industry. • The construction industry contributes around $67 billion to GDP and employs around 970,000 and generates exports of nearly $150 million. • The industry has one of the lowest innovation rates of any industry in Australia, ranking third last across all Australian industries in terms of its proportion of business expenditure on innovation, and second last in terms of the proportion of income generated from innovation (ABS, 2006). • Key innovation challenges include addressing energy and water use efficiency, and housing costs in preparing for the implementation of the Carbon Pollution Reduction Scheme. The sector will need to build its capability and capacity to deliver the technical and operational expertise required.The broader Built Environment Innovation Project aims to address the following two objectives: 1. Identify current innovative practice across the Built Environment industry. 2. Develop a knowledge exchange strategy for this information to be disseminated to all industry stakeholders. Industry practice issues are critical to the built environment industry’s ability to innovate, and the BRITE project from the CRC for Construction Innovation has previously undertaken work to identify the key factors that drive innovation. Part 1 of the current project aims to extend this work by conducting a stocktake of current and emerging innovative practices within the built environment industry. Part 2 of the project addresses the second of these objectives, that is, to recommend a knowledge exchange strategy for promoting the wider uptake of innovative practices that makes the information identified in Part 1 of the study (on emerging innovative practices) accessible to Australian built environment industry stakeholders. The project brief was for the strategy to include a mechanism to enable this information resource to be updated as new initiatives/practices are developed. A better understanding of the built environment industry’s own knowledge infrastructure also has the potential to enhance innovation outcomes for the industry. This project will develop a coordinated knowledge exchange strategy, informed by the best available information on current innovation practices within the industry and suggest directions for gaining a better understanding of: the industry contexts that lead to innovative practices; the industry (including enterprise and individual) drivers for innovation; and appropriate knowledge exchange pathways for delivering future industry innovation. A deliverable of Part 2 will be a recommendation for a knowledge exchange strategy to accelerate adoption of innovative practices in the built environment industry, including resource implications and how such a recommendation could be taken forward as an ongoing resource.
Resumo:
Decision Support System (DSS) has played a significant role in construction project management. This has been proven that a lot of DSS systems have been implemented throughout the whole construction project life cycle. However, most research only concentrated in model development and left few fundamental aspects in Information System development. As a result, the output of researches are complicated to be adopted by lay person particularly those whom come from a non-technical background. Hence, a DSS should hide the abstraction and complexity of DSS models by providing a more useful system which incorporated user oriented system. To demonstrate a desirable architecture of DSS particularly in public sector planning, we aim to propose a generic DSS framework for consultant selection. It will focus on the engagement of engineering consultant for irrigation and drainage infrastructure. The DSS framework comprise from operational decision to strategic decision level. The expected result of the research will provide a robust framework of DSS for consultant selection. In addition, the paper also discussed other issues that related to the existing DSS framework by integrating enabling technologies from computing. This paper is based on the preliminary case study conducted via literature review and archival documents at Department of Irrigation and Drainage (DID) Malaysia. The paper will directly affect to the enhancement of consultant pre-qualification assessment and selection tools. By the introduction of DSS in this area, the selection process will be more efficient in time, intuitively aided qualitative judgment, and transparent decision through aggregation of decision among stakeholders.
Resumo:
Purpose: In this research we examined, by means of case studies, the mechanisms by which relationships can be managed and by which communication and cooperation can be enhanced in sustainable supply chains. The research was predicated on the contention that the development of a sustainable supply chain depends, in part, on the transfer of knowledge and capabilities from the larger players in the supply chain. Design/Methodology/Approach: The research adopted a triangulated approach in which quantitative data were collected by questionnaire, interviews were conducted to explore and enrich the quantitative data and case studies were undertaken in order to illustrate and validate the findings. Handy‟s (1985) view of organisational culture, Allen & Meyer‟s (1990) concepts of organisational commitment and Van de Ven & Ferry‟s (1980) measures of organisational structuring have been combined into a model to test and explain how collaborative mechanisms can affect supply chain sustainability. Findings: It has been shown that the degree of match and mismatch between organisational culture and structure has an impact on staff‟s commitment level. A sustainable supply chain depends on convergence – that is the match between organisational structuring, organisation culture and organisation commitment. Research Limitations/implications: The study is a proof of concept and three case studies have been used to illustrate the nature of the model developed. Further testing and refinement of the model in practice should be the next step in this research. Practical implications: The concept of relationship management needs to filter down to all levels in the supply chain if participants are to retain commitment and buy-in to the relationship. A sustainable supply chain requires proactive relationship management and the development of an appropriate organisational culture, and trust. By legitimising individuals‟ expectations of the type of culture which is appropriate to their company and empowering employees to address mismatches that may occur a situation can be created whereby the collaborating organisations develop their competences symbiotically and so facilitate a sustainable supply chain. Originality/value: The culture/commitment/structure model developed from three separate strands of management thought has proved to be a powerful tool for analysing collaboration in supply chains and explaining how and why some supply chains are sustainable, and others are not.
Resumo:
PPP (Public Private Partnerships) is a new operation mode of infrastructure projects, which usually undergo long periods and have various kinds of risks in technology, market, politics, policy, finance, society, natural conditions and cooperation. So the government and the private agency should establish the risk-sharing mechanism to ensure the successful implementation of the project. As an important branch of the new institutional economics, transaction cost economics and its analysis method have been proved to be beneficial to the proper allocation of risks between the two parts in PPP projects and the improvement of operation efficiency of PPP risk-sharing mechanism. This paper analyzed the transaction cost of the projects risk-sharing method and the both risk carriers. It pointed out that the risk-sharing method of PPP projects not only reflected the spirit of cooperation between public sector and private agency, but also minimized the total transaction cost of the risk sharing mechanism itself. Meanwhile, the risk takers had to strike a balance between the beforehand cost and the afterwards cost so as to control the cost of risk management. The paper finally suggested three ways which might be useful to reduce the transaction cost: to choose appropriate type of contract of PPP risk-sharing mechanism, to prevent information asymmetry and to establish mutual trust between the two participants.
Resumo:
Innovation Management (IM) in most knowledge based firms is used on an adhoc basis where senior managers use this term to leverage competitive edge without understanding its true meaning and how its robust application in organisation impacts organisational performance. There have been attempts in the manufacturing industry to harness the innovative potential of the business and apprehend its use as a point of difference to improve financial and non financial outcomes. However further work is required to innovatively extrapolate the lessons learnt to introduce incremental and/or radical innovation to knowledge based firms. An international structural engineering firm has been proactive in exploring and implementing this idea and has forged an alliance with the Queensland University of Technology to start the Innovation Management Program (IMP). The aim was to develop a permanent and sustainable program with which innovation can be woven through the fabric of the organisation. There was an intention to reinforce the firms’ vision and reinvigorate ideas and create new options that help in its realisation. This paper outlines the need for innovation in knowledge based firms and how this consulting engineering firm reacted to this exigency. The development of the Innovation Management Program, its different themes (and associated projects) and how they integrate to form a holistic model is also discussed. The model is designed around the need of providing professional qualification improvement opportunities for staff, setting-up organised, structured & easily accessible knowledge repositories to capture tacit and explicit knowledge and implement efficient project management strategies with a view to enhance client satisfaction. A Delphi type workshop is used to confirm the themes and projects. Some of the individual projects and their expected outcomes are also discussed. A questionnaire and interviews were used to collect data to select appropriate candidates responsible for leading these projects. Following an in-depth analysis of preliminary research results, some recommendations on the selection process will also be presented.
Resumo:
Purpose – The purpose of this paper is to examine the use of bid information, including both price and non-price factors in predicting the bidder’s performance. Design/methodology/approach – The practice of the industry was first reviewed. Data on bid evaluation and performance records of the successful bids were then obtained from the Hong Kong Housing Department, the largest housing provider in Hong Kong. This was followed by the development of a radial basis function (RBF) neural network based performance prediction model. Findings – It is found that public clients are more conscientious and include non-price factors in their bid evaluation equations. With the input variables used the information is available at the time of the bid and the output variable is the project performance score recorded during work in progress achieved by the successful bidder. It was found that past project performance score is the most sensitive input variable in predicting future performance. Research limitations/implications – The paper shows the inadequacy of using price alone for bid award criterion. The need for a systemic performance evaluation is also highlighted, as this information is highly instrumental for subsequent bid evaluations. The caveat for this study is that the prediction model was developed based on data obtained from one single source. Originality/value – The value of the paper is in the use of an RBF neural network as the prediction tool because it can model non-linear function. This capability avoids tedious ‘‘trial and error’’ in deciding the number of hidden layers to be used in the network model. Keywords Hong Kong, Construction industry, Neural nets, Modelling, Bid offer spreads Paper type Research paper