996 resultados para Queensland buildings
Resumo:
Construction procurement organisations in the Australian framework provide broad guidelines on project management in setting benchmark performance measurements and processes for evaluating their projects. Despite this, little has been known in the project management practise in transport construction projects in Australia, in particular Queensland. Questionnaire data from 53 project management practitioners employed in State and City public sector organisations in Queensland,suggested that many practitioners in the public sector have little or a lack of understanding of government regulatory policies, which are used as economic evaluation tools for project options. Public sector project managers perceive socio-economic evaluation tools as inappropriate for public sector projects. The survey results also found conducting risk management analysis, developing a risk register and mitigation of risks were most effective way of managing risk. This study provides an opportunity for the public sector to review and provide training on project management practices and government regulatory policies governing public projects. This will improve project management practitioners’ understanding and interpretation of government regulatory policies.
Resumo:
Water Sensitive Urban Design (WSUD) systems have the potential mitigate the hydrologic disturbance and water quality concerns associated with stormwater runoff from urban development. In the last few years WSUD has been strongly promoted in South East Queensland (SEQ) and new developments are now required to use WSUD systems to manage stormwater runoff. However, there has been limited field evaluation of WSUD systems in SEQ and consequently knowledge of their effectiveness in the field, under storm events, is limited. The objective of this research project was to assess the effectiveness of WSUD systems installed in a residential development, under real storm events. To achieve this objective, a constructed wetland, bioretention swale and a bioretention basin were evaluated for their ability to improve the hydrologic and water quality characteristics of stormwater runoff from urban development. The monitoring focused on storm events, with sophisticated event monitoring stations measuring the inflow and outflow from WSUD systems. Data analysis undertaken confirmed that the constructed wetland, bioretention basin and bioretention swale improved the hydrologic characteristics by reducing peak flow. The bioretention systems, particularly the bioretention basin also reduced the runoff volume and frequency of flow, meeting key objectives of current urban stormwater management. The pollutant loads were reduced by the WSUD systems to above or just below the regional guidelines, showing significant reductions to TSS (70-85%), TN (40-50%) and TP (50%). The load reduction of NOx and PO4 3- by the bioretention basin was poor (<20%), whilst the constructed wetland effectively reduced the load of these pollutants in the outflow by approximately 90%. The primary reason for the load reduction in the wetland was due to a reduction in concentration in the outflow, showing efficient treatment of stormwater by the system. In contrast, the concentration of key pollutants exiting the bioretention basin were higher than the inflow. However, as the volume of stormwater exiting the bioretention basin was significantly lower than the inflow, a load reduction was still achieved. Calibrated MUSIC modelling showed that the bioretention basin, and in particular, the constructed wetland were undersized, with 34% and 62% of stormwater bypassing the treatment zones in the devices. Over the long term, a large proportion of runoff would not receive treatment, considerably reducing the effectiveness of the WSUD systems.
Resumo:
Differential distortion comprising axial shortening and consequent rotation in concrete buildings is caused by the time dependent effects of “shrinkage”, “creep” and “elastic” deformation. Reinforcement content, variable concrete modulus, volume to surface area ratio of elements and environmental conditions influence these distortions and their detrimental effects escalate with increasing height and geometric complexity of structure and non vertical load paths. Differential distortion has a significant impact on building envelopes, building services, secondary systems and the life time serviceability and performance of a building. Existing methods for quantifying these effects are unable to capture the complexity of such time dependent effects. This paper develops a numerical procedure that can accurately quantify the differential axial shortening that contributes significantly to total distortion in concrete buildings by taking into consideration (i) construction sequence and (ii) time varying values of Young’s Modulus of reinforced concrete and creep and shrinkage. Finite element techniques are used with time history analysis to simulate the response to staged construction. This procedure is discussed herein and illustrated through an example.
Resumo:
Media articles have promoted the view that cyclists are risktakers who disregard traffic regulations, but little is known about the contribution of cyclist risk-taking behaviours to crashes. This study examines the role of traffic violations in the 6774 police-reported bicycle crashes in Queensland between January 2000 and December 2008. Of the 6328 crashes involving bicycles and motor vehicles, cyclists were deemed to be at fault in 44.4% of the incidents. When motorists were determined to be at-fault, ‘failure to yield’ violations accounted for three of the four most reported contributing factors. In crashes where the cyclist was at fault, attention and inexperience were the most frequent contributing factors. There were 67 collisions between bicycles and pedestrians, with the cyclist at fault in 65.7%. During the data period, 302 single-bicycle crashes were reported. The most frequent contributing factors were avoidance actions to miss another road user and inattention or negligence.
Resumo:
In this study, the host-sensitivity and -specificity of JCV and BKV polyomaviruses were evaluated by testing wastewater/fecal samples from nine host groups in Southeast Queensland, Australia. The JCV and BKV polyomaviruses were detected in 48 human wastewater samples collected from the primary and secondary effluent suggesting high sensitivity of these viruses in human wastewater. Of the 81 animal wastewater/fecal samples tested, 80 were PCR negative for this marker. Only one sample from pig wastewater was positive. Nonetheless, the overall host-specificity of these viruses to differentiate between human and animal wastewater/fecal samples was 0.99. To our knowledge, this is the first study in Australia that reports the high specificity of JCV and BKV polyomaviruses. To evaluate the field application of these viruses to detect human fecal pollution, 20 environmental samples were collected from a coastal river. Of the 20 samples tested, 15% and 70% samples exceeded the regulatory guidelines for E. coli and enterococci levels for marine waters. In all, 5 (25%) samples were PCR positive for JCV and BKV indicated the presence of human fecal pollution in the studied river. The results suggest that JCV and BKV detection using PCR could be a useful tool for the identification of human sourced fecal pollution in coastal waters.
Resumo:
The diversity of community voices in the SEQ ‘bellwether region’ has grown from a muted murmur in the mid twentieth century supporting provision of urban services, rural conservation and green belts, to the current clamour against over-development, and in favour of protecting local and regional open space, wetlands and natural habitats. This in turn has often resulted in vigorous campaigns against unpopular roads, dams, dumps and tall buildings. In the last twenty years community issues have played a major part in local government elections throughout the region and have even helped unseat (in 1995-1996) a state government which discounted their authenticity and community resolve.
Resumo:
The reliability of Critical Infrastructure is considered to be a fundamental expectation of modern societies. These large-scale socio-technical systems have always, due to their complex nature, been faced with threats challenging their ongoing functioning. However, increasing uncertainty in addition to the trend of infrastructure fragmentation has made reliable service provision not only a key organisational goal, but a major continuity challenge: especially given the highly interdependent network conditions that exist both regionally and globally. The notion of resilience as an adaptive capacity supporting infrastructure reliability under conditions of uncertainty and change has emerged as a critical capacity for systems of infrastructure and the organisations responsible for their reliable management. This study explores infrastructure reliability through the lens of resilience from an organisation and system perspective using two recognised resilience-enhancing management practices, High Reliability Theory (HRT) and Business Continuity Management (BCM) to better understand how this phenomenon manifests within a partially fragmented (corporatised) critical infrastructure industry – The Queensland Electricity Industry. The methodological approach involved a single case study design (industry) with embedded sub-units of analysis (organisations), utilising in-depth interviews and document analysis to illicit findings. Derived from detailed assessment of BCM and Reliability-Enhancing characteristics, findings suggest that the industry as a whole exhibits resilient functioning, however this was found to manifest at different levels across the industry and in different combinations. Whilst there were distinct differences in respect to resilient capabilities at the organisational level, differences were less marked at a systems (industry) level, with many common understandings carried over from the pre-corporatised operating environment. These Heritage Factors were central to understanding the systems level cohesion noted in the work. The findings of this study are intended to contribute to a body of knowledge encompassing resilience and high reliability in critical infrastructure industries. The research also has value from a practical perspective, as it suggests a range of opportunities to enhance resilient functioning under increasingly interdependent, networked conditions.
Resumo:
Accurate estimation of input parameters is essential to ensure the accuracy and reliability of hydrologic and water quality modelling. Calibration is an approach to obtain accurate input parameters for comparing observed and simulated results. However, the calibration approach is limited as it is only applicable to catchments where monitoring data is available. Therefore, methodology to estimate appropriate model input parameters is critical, particularly for catchments where monitoring data is not available. In the research study discussed in the paper, pollutant build-up parameters derived from catchment field investigations and model calibration using MIKE URBAN are compared for three catchments in Southeast Queensland, Australia. Additionally, the sensitivity of MIKE URBAN input parameters was analysed. It was found that Reduction Factor is the most sensitive parameter for peak flow and total runoff volume estimation whilst Build-up rate is the most sensitive parameter for TSS load estimation. Consequently, these input parameters should be determined accurately in hydrologic and water quality simulations using MIKE URBAN. Furthermore, an empirical equation for Southeast Queensland, Australia for the conversion of build-up parameters derived from catchment field investigations as MIKE URBAN input build-up parameters was derived. This will provide guidance for allowing for regional variations in the estimation of input parameters for catchment modelling using MIKE URBAN where monitoring data is not available.
Resumo:
a presentation about immersive visualised simulation systems, image analysis and GPGPU Techonology
Resumo:
This thesis examines the advanced North American environmental mitigation schemes for their applicability to Queensland. Compensatory wetland mitigation banking, in particular, is concerned with in-perpetuity management and protection - the basic concerns of the Queensland public about its unique environment. The process has actively engaged the North American market and become a thriving industry that (for the most part) effectively designs, creates and builds (or enhances) environmental habitat. A methodology was designed to undertake a comprehensive review of the history, evolution and concepts of the North American wetland mitigation banking system - before and after the implementation of a significant new compensatory wetland mitigation banking regulation in 2008. The Delphi technique was then used to determine the principles and working components of wetland mitigation banking. Results were then applied to formulate a questionnaire to review Australian marketbased instruments (including offsetting policies) against these North American principles. Following this, two case studies established guiding principles for implementation based on two components of the North American wetland mitigation banking program. The subsequent outcomes confirmed that environmental banking is a workable concept in North America and that it is worth applying in Queensland. The majority of offsetting policies in Australia have adopted some principles of the North American mitigation programs. Examination reveals that however, they fail to provide adequate incentives for private landowners to participate because the essential trading mechanisms are not employed. Much can thus be learnt from the North American situation - where private enterprise has devised appropriate free market concepts. The consequent environmental banking process (as adapted from the North American programs) should be implemented in Queensland. It can then focus here on engaging the private sector, where the majority of naturally productive lands are managed.
Resumo:
This thesis consists of three related studies: an ERP Major Issues Study; an Historical Study of the Queensland Government Financial Management System; and a Meta-Study that integrates these and other related studies conducted under the umbrella of the Cooperative ERP Lifecycle Knowledge Management research program. This research provides a comprehensive view of ERP lifecycle issues encountered in SAP R/3 projects across the Queensland Government. This study follows a preliminary ERP issues study (Chang, 2002) conducted in five Queensland Government agencies. The Major Issues Study aims to achieve the following: (1) identify / explicate major issues in relation to the ES life-cycle in the public sector; (2) rank the importance of these issues; and, (3) highlight areas of consensus and dissent among stakeholder groups. To provide a rich context for this study, this thesis includes an historical recount of the Queensland Government Financial Management System (QGFMS). This recount tells of its inception as a centralised system; the selection of SAP and subsequent decentralisation; and, its eventual recentralisation under the Shared Services Initiative and CorpTech. This historical recount gives an insight into the conditions that affected the selection and ongoing management and support of QGFMS. This research forms part of a program entitled Cooperative ERP Lifecycle Knowledge Management. This thesis provides a concluding report for this research program by summarising related studies conducted in the Queensland Government SAP context: Chan (2003); Vayo et al (2002); Ng (2003); Timbrell et al (2001); Timbrell et al (2002); Chang (2002); Putra (1998); and, Niehus et al (1998). A study of Oracle in the United Arab Emirates by Dhaheri (2002) is also included. The thesis then integrates the findings from these studies in an overarching Meta-Study. The Meta-Study discusses key themes across all of these studies, creating an holistic report for the research program. Themes discussed in the meta-study include common issues found across the related studies; knowledge dynamics of the ERP lifecycle; ERP maintenance and support; and, the relationship between the key players in the ERP lifecycle.