844 resultados para Project 2006-036-A : Multi-Outcome Construction Policies


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Management (or perceived mismanagement) of large-scale, complex projects poses special problems and often results in spectacular failures, cost overruns, time blowouts and stakeholder dissatisfaction. While traditional project management responds with increasingly administrative constraints, we argue that leaders of such projects also need to display adaptive and enabling behaviours to foster adaptive processes, such as opportunity recognition, which requires an interaction of cognitive and affective processes of individual, project, and team leader attributes and behaviours. At the core of this model we propose is an interaction of cognitive flexibility, affect and emotional intelligence. The result of this interaction is enhanced leader opportunity recognition that, in turn, facilitates multilevel outcomes.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Despite an increasing highlight on the sustainability agenda by the construction industry, sustainable development is often treated with different philosophy, interpretation, and responsibility at various stages of project development by various stakeholders involved. The actual sustainability deliverables from the industry is not substantially tangible, especially at project levels. For infrastructure projects which typically span over long periods of time, achieving consistent sustainability outcomes during various stages of development remains as a formidable task. The absence of common understanding among stakeholders and the lack of appropriate sustainability reporting mechanism are possible causes. Many policies dealing with these issues tend to be too generic and broad-based for practical adaptation. While there had been a plenty of research initiatives on sustainability assessment, there is often a gap between sustainability deliverables during project implementation and the grandeur of promises during project conception. This paper reviews the historical context of sustainable development and its principles, and past studies on sustainable construction, focusing on infrastructure projects. It goes on to introduce a QUT research project aimed at identifying and integrating the different perceptions and priority needs of the stakeholders, along with identifying issues that impact on the gap between sustainability foci and its actual realization at project end level, in order to generate a framework of enhancing sustainable deliverables. It is expected that the research will help promote more integrated approaches to decision-making on the implementation of sustainability strategies and foci during the construction project delivery processes.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Many academic researchers have conducted studies on the selection of design-build (DB) delivery method; however, there are few studies on the selection of DB operational variations, which poses challenges to many clients. The selection of DB operational variation is a multi-criteria decision making process that requires clients to objectively evaluate the performance of each DB operational variation with reference to the selection criteria. This evaluation process is often characterized by subjectivity and uncertainty. In order to resolve this deficiency, the current investigation aimed to establish a fuzzy multicriteria decision-making (FMCDM) model for selecting the most suitable DB operational variation. A three-round Delphi questionnaire survey was conducted to identify the selection criteria and their relative importance. A fuzzy set theory approach, namely the modified horizontal approach with the bisector error method, was applied to establish the fuzzy membership functions, which enables clients to perform quantitative calculations on the performance of each DB operational variation. The FMCDM was developed using the weighted mean method to aggregate the overall performance of DB operational variations with regard to the selection criteria. The proposed FMCDM model enables clients to perform quantitative calculations in a fuzzy decision-making environment and provides a useful tool to cope with different project attributes.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This report discusses findings of a case study into "Road Construction Safety" undertaken as a part of the retrospective analysis component of Sustainable Built Environment National Research Centre (SBEnrc) Project 2.7 Leveraging R&D investment for the Australian Built Environment. The Queensland Department of Transport and Main Roads (QTMR) has taken a leadership role in developing a safer working environment for road construction workers. In the past decades, a range of initiatives have been introduced to contribute to improved performance in this area. Several initiatives have been undertaken by QTMR as part of their overarching commitment to safety. Three such initiatives form the basis for this case study investigation, in order to better illustrate the nature of R&D investment and its impact on day-to-day operations and the supply chain. These are the development and implementation of: (i) the Mechanical Traffic Aid: (ii) the Thermal Imaging Camera; and (iii) the Trailer-based CCTV (camera). This case study should be read in conjunction with Part 1 of this suite of reports.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Growth in productivity is the key determinant of the long-term health and prosperity of an economy. The construction industry being one of major strategic importance, its productivity performance has a significant effect on national economic growth. The relationship between construction output and economy has received intensive studies, but there is lack of empirical study on the relationship between construction productivity and economic fluctuations. Fluctuations in construction output are endemic in the industry. In part they are caused by the boom and slump of the economy as a whole and in part by the nature of the construction product. This research aims to uncover how the productivity of construction sector is influenced in the course of economic fluctuations in Malaysia. Malaysia has adopted three economic policies – New Economic Policy (1971-1990), National Development Policy (1991-2000) and the National Vision Policy (2001-2010) since gaining independence in 1959. The Privatisation Master Plan was introduced in 1991. Operating within this historical context, the Malaysian construction sector has experienced four business cycles since 1960. A mixed-method design approach is adopted in this study. Quantitative analysis was conducted on the published official statistics of the construction industry and the overall economy in Malaysia between 1970 and 2009. Qualitative study involved interviews with a purposive sample of 21 industrial participants. This study identified a 32-year long building cycle appears in 1975-2006. It is superimposed with three shorter construction business cycles in 1975-1987, 1987-1999 and 1999-2006. The correlations of Construction labour productivity (CLP) and GDP per capita are statistically significant for the 1975-2006 building cycle, 1987-1999 and 1999-2006 construction business cycles. It was not significant in 1975-1987 construction business cycles. The Construction Industry Surveys/Census over the period from 1996 to 2007 show that the average growth rate of total output per employee expanded but the added value per employee contracted which imply high cost of bought-in materials and services and inefficient usage of purchases. The construction labour productivity is peaked at 2004 although there is contraction of construction sector in 2004. The residential subsector performed relatively better than the other sub-sectors in most of the productivity indicators. Improvements are found in output per employee, value added per employee, labour competitiveness and capital investment but declines are recorded in value added content and capital productivity. The civil engineering construction is most productive in the labour productivity nevertheless relatively poorer in the capital productivity. The labour cost is more competitive in the larger size establishment. The added value per labour cost is higher in larger sized establishment attributed to efficient in utilization of capital. The interview with the industrial participant reveals that the productivity of the construction sector is influenced by the economic environment, the construction methods, contract arrangement, payment chain and regulatory policies. The fluctuations of construction demand have caused companies switched to defensive strategy during the economic downturn and to ensure short-term survival than to make a profit for the long-term survival and growth. It leads the company to take drastic measures to curb expenses, downsizing, employ contract employment, diversification and venture overseas market. There is no empirical evidence supports downsizing as a necessary step in a process of reviving productivity. The productivity does not correlate with size of firm. A relatively smaller and focused firm is more productive than the larger and diversified organisation. However diversified company experienced less fluctuation in both labour and capital productivity. In order to improve the productivity of the construction sector, it is necessary to remove the negatives and flaws from past practices. The recommended measures include long-term strategic planning and coordinated approaches of government agencies in planning of infrastructure development and to provide regulatory environments which encourage competition and facilitate productivity improvement.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper investigates the policies and instruments adopted in Hong Kong to control the carbon emissions of construction facilities, including the whole building life cycle: production of material stage, construction stage, operation stage and demolition stage. This commences with a literature review comparing activities world-wide to those in Hong Kong to identify the main issues at stake, followed by a report on a series of local interviews to evaluate the present situation in Hong Kong, as well as future opportunities for local carbon mitigation. The interviewees included practitioners from engineering contracting firms, consulting firms, clients and energy provider, together with two university experts and a counsellor. A small case study is also provided of a building project in Hong Kong to illustrate some of the innovative design aspects being incorporated into buildings in Hong Kong as a result of the current emphasis on sustainability. The paper concludes with a summary of main findings and proposals for improvement in policy related to carbon mitigation and building sustainability in Hong Kong.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The construction industry demands priority from all governments because it impacts economically and socially on all citizens. A number of recent studies have identified inefficiencies in the Australian construction industry by modelling the building process. A culture of reform supported by industry and government is now emerging in the industry – one in which alternate forms of project delivery are being trialed. The Australian Building and Construction Industry Action Agenda brought together industry and government to identify actions necessary to lift Australia’s innovative and knowledge creating capacity at the sector level. A central activity under this Action Agenda was dissemination of information relating to industry best practice initiatives in innovation, project delivery and the use of information technology. Government and industry identified project alliance contracting and more advanced information technology as means to increase efficiency in construction as part of a new innovative procurement environment.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Commonwealth Department of Industry, Science and Resources is identifying best practice case study examples of supply chain management within the building and construction industry to illustrate the concepts, innovations and initiatives that are at work. The projects provide individual enterprises with examples of how to improve their performance, and the competitiveness of the industry as a whole.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Clients and Design-build (DB) contractors are two key stakeholders in DB projects, and contribute significantly to the successful project performance. This study aims to identify and compare such key competences in the construction market of the PRC. After the survey of available literature and face-to-face interviews, a two-round Delphi questionnaire survey was conducted to identify the key competences of clients and DB contractors in DB projects. Relative importance of these identified competences were ranked and compared. The questionnaire results indicated distinct differences between the key competences of clients and that of contractors. The contractor’s key competences emphasize on DB experience, corporate management capability, building and design expertise, financial capability, enterprise qualification and reputation. While the client’s competences focus on the ability to clearly define the project scope & requirements, financial capacity, contract management ability, adequate staff, effective coordination with DB contractor and similar DB experience. Both clients and DB contractors should clearly understand the competence requirements in DB projects and possess all the necessary competences for the successful outcome of DB projects. The identification of these key competences provides clients and DB contractors with indicators to assess their capabilities before going for the DB option. Furthermore, the comparison of competences for clients and DB contractors will result in better understanding of DB system and improve the communication between these stakeholders.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Numerous different and sometimes discrepant interests can be affected, both positively and negatively, throughout the course of a major infrastructure and construction (MIC) project. Failing to address and meet the concerns and expectations of the stakeholders involved has resulted in many project failures. One way to address this issue is through a participatory approach to project decision making. Whether the participation mechanism is effective or not depends largely on the client/owner. This paper provides a means of systematically evaluating the effectiveness of the public participation exercise, or even the whole project, through the measurement of stakeholder satisfaction. Since the process of satisfaction measurement is complicated and uncertain, requiring approximate reasoning involving human intuition, a fuzzy approach is adopted. From this, a multi-factor hierarchical fuzzy comprehensive evaluation model is established to facilitate the evaluation of satisfaction in both single stakeholder group and overall MIC project stakeholders.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Although the drivers of innovation have been studied extensively in construction, greater attention is required on how innovation diffusion can be effectively assessed within this complex and interdependent project-based industry. The authors draw on a highly cited innovation diffusion model by Rogers (2006) and develop a tailored conceptual framework to guide future empirical work aimed at assessing innovation diffusion in construction. The conceptual framework developed and discussed in this paper supports a five-stage process model of innovation diffusion namely: 1) knowledge and idea generation, 2) persuasion and evaluation; 3) decision to adopt, 4) integration and implementation, and 5) confirmation. As its theoretical contribution, this paper proposes three critical measurements constructs which can be used to assess the effectiveness of the diffusion process. These measurement constructs comprise: 1) nature and introduction of an innovative idea, 2) organizational capacity to acquire, assimilate, transform and exploit an innovation, and 3) rates of innovation facilitation and adoption. The constructs are interpreted in the project-based context of the construction industry, extending the contribution of general management theorists. Research planned by the authors will test the validity and reliability of the constructs developed in this paper.