808 resultados para Proceedings of personnel management
Resumo:
This article presents the results of a study using satellite remote sensing techniques to evaluate the current status of canal system performance in terms of the spatial and temporal mismatch between water requirements and water releases within the command area The Rajolibanda Diversion Scheme(RDS)is the only operational major irrigation project in the drought prone district of Mahaboobnagar in Andra Pradesh. It is an inter-state project between Karnataka and Andra Pradesh which comprises of an anicut constructed in Karnataka in 1995 across river Thungabhdra and a 143 km long left bank main canel. The initial 42.6 km of the canel lies in Karnataka consisting of 12 distributaries and servers and serves an localised ayacut of 2739ha. In Andra Pradesh, the latter stretch of the main canal consists of distributaries 12A to 40, is localised to serve an ayacut of 35,410 ha.of which 14,215 ha during kharif season,19,332 ha, during rabi season and 1,863 ha.of perennial crops
Proceedings of the 5th Cambridge Workshop on Universal Access and Assistive Technology (CWUAAT 2010)
Proceedings of the 4th Cambridge Workshop on Universal Access and Assistive Technology (CWUAAT 2008)
Proceedings of the 3rd Cambridge Workshop on Universal Access and Assistive Technology (CWUAAT 2006)
Proceedings of the 3rd Cambridge Workshop on Universal Access and Assistive Technology (CWUAAT 2006)