1000 resultados para Multi métodos


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Traditional vertically integrated power utilities around the world have evolved from monopoly structures to open markets that promote competition among suppliers and provide consumers with a choice of services. Market forces drive the price of electricity and reduce the net cost through increased competition. Electricity can be traded in both organized markets or using forward bilateral contracts. This article focuses on bilateral contracts and describes some important features of an agent-based system for bilateral trading in competitive markets. Special attention is devoted to the negotiation process, demand response in bilateral contracting, and risk management. The article also presents a case study on forward bilateral contracting: a retailer agent and a customer agent negotiate a 24h-rate tariff. © 2014 IEEE.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper studies a discrete dynamical system of interacting particles that evolve by interacting among them. The computational model is an abstraction of the natural world, and real systems can range from the huge cosmological scale down to the scale of biological cell, or even molecules. Different conditions for the system evolution are tested. The emerging patterns are analysed by means of fractal dimension and entropy measures. It is observed that the population of particles evolves towards geometrical objects with a fractal nature. Moreover, the time signature of the entropy can be interpreted at the light of complex dynamical systems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Collective behaviours can be observed in both natural and man-made systems composed of a large number of elemental subsystems. Typically, each elemental subsystem has its own dynamics but, whenever interaction between individuals occurs, the individual behaviours tend to be relaxed, and collective behaviours emerge. In this paper, the collective behaviour of a large-scale system composed of several coupled elemental particles is analysed. The dynamics of the particles are governed by the same type of equations but having different parameter values and initial conditions. Coupling between particles is based on statistical feedback, which means that each particle is affected by the average behaviour of its neighbours. It is shown that the global system may unveil several types of collective behaviours, corresponding to partial synchronisation, characterised by the existence of several clusters of synchronised subsystems, and global synchronisation between particles, where all the elemental particles synchronise completely.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Kinematic redundancy occurs when a manipulator possesses more degrees of freedom than those required to execute a given task. Several kinematic techniques for redundant manipulators control the gripper through the pseudo-inverse of the Jacobian, but lead to a kind of chaotic inner motion with unpredictable arm configurations. Such algorithms are not easy to adapt to optimization schemes and, moreover, often there are multiple optimization objectives that can conflict between them. Unlike single optimization, where one attempts to find the best solution, in multi-objective optimization there is no single solution that is optimum with respect to all indices. Therefore, trajectory planning of redundant robots remains an important area of research and more efficient optimization algorithms are needed. This paper presents a new technique to solve the inverse kinematics of redundant manipulators, using a multi-objective genetic algorithm. This scheme combines the closed-loop pseudo-inverse method with a multi-objective genetic algorithm to control the joint positions. Simulations for manipulators with three or four rotational joints, considering the optimization of two objectives in a workspace without and with obstacles are developed. The results reveal that it is possible to choose several solutions from the Pareto optimal front according to the importance of each individual objective.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Componentised systems, in particular those with fault confinement through address spaces, are currently emerging as a hot topic in embedded systems research. This paper extends the unified rate-based scheduling framework RBED in several dimensions to fit the requirements of such systems: we have removed the requirement that the deadline of a task is equal to its period. The introduction of inter-process communication reflects the need to communicate. Additionally we also discuss server tasks, budget replenishment and the low level details needed to deal with the physical reality of systems. While a number of these issues have been studied in previous work in isolation, we focus on the problems discovered and lessons learned when integrating solutions. We report on our experiences implementing the proposed mechanisms in a commercial grade OKL4 microkernel as well as an application with soft real-time and best-effort tasks on top of it.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Introdução – A estimativa da função renal relativa (FRR) através de cintigrafia renal (CR) com ácido dimercaptossuccínico marcado com tecnécio-99 metaestável (99mTc-DMSA) pode ser influenciada pela profundidade renal (PR), atendendo ao efeito de atenuação por parte dos tecidos moles que envolvem os rins. Dado que raramente é conhecida esta mesma PR, diferentes métodos de correção de atenuação (CA) foram desenvolvidos, nomeadamente os que utilizam fórmulas empíricas, como os de Raynaud, de Taylor ou de Tonnesen, ou recorrendo à aplicação direta da média geométrica (MG). Objetivos – Identificar a influência dos diferentes métodos de CA na quantificação da função renal relativa através da CR com 99mTc-DMSA e avaliar a respetiva variabilidade dos resultados de PR. Metodologia – Trinta e um pacientes com indicação para realização de CR com 99mTc-DMSA foram submetidos ao mesmo protocolo de aquisição. O processamento foi efetuado por dois operadores independentes, três vezes por exame, variando para o mesmo processamento o método de determinação da FRR: Raynaud, Taylor, Tonnesen, MG ou sem correção de atenuação (SCA). Aplicou-se o teste de Friedman para o estudo da influência dos diferentes métodos de CA e a correlação de Pearson para a associação e significância dos valores de PR com as variáveis idade, peso e altura. Resultados – Da aplicação do teste de Friedman verificaram-se diferenças estatisticamente significativas entre os vários métodos (p=0,000), excetuando as comparações SCA/Raynaud, Tonnesen/MG e Taylor/MG (p=1,000) para ambos os rins. A correlação de Pearson demonstra que a variável peso apresenta uma correlação forte positiva com todos os métodos de cálculo da PR. Conclusões – O método de Taylor, entre os três métodos de cálculo de PR, é o que apresenta valores de FRR mais próximos da MG. A escolha do método de CA influencia significativamente os parâmetros quantitativos de FRR.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We consider the problem of scheduling a multi-mode real-time system upon identical multiprocessor platforms. Since it is a multi-mode system, the system can change from one mode to another such that the current task set is replaced with a new task set. Ensuring that deadlines are met requires not only that a schedulability test is performed on tasks in each mode but also that (i) a protocol for transitioning from one mode to another is specified and (ii) a schedulability test for each transition is performed. We propose two protocols which ensure that all the expected requirements are met during every transition between every pair of operating modes of the system. Moreover, we prove the correctness of our proposed algorithms by extending the theory about the makespan determination problem.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Tese de mestrado. Engenharia Electrotécnica e de Computadores. Faculdade de Engenharia. Universidade do Porto. 199

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We discuss the development of a simple globally prioritized multi-channel medium access control (MAC) protocol for wireless networks. This protocol provides “hard” pre-run-time real-time guarantees to sporadic message streams, exploits a very large fraction of the capacity of all channels for “hard” real-time traffic and also makes it possible to fully utilize the channels with non real-time traffic when hard real-time messages do not request to be transmitted. The potential of such protocols for real-time applications is discussed and a schedulability analysis is also presented.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Este estudo pretende mostrar algumas aplicações dos métodos computacionais na actividade de projecto em Engenharia Mecânica. Apresentam-se problemas concretos de engenharia que foram abordados durante um estágio realizado no CERN – Centre Européen pour la Recherche Nucléaire, e onde foram utilizados: a) o método dos elementos finitos para cálculo de temperaturas e fluxos de calor e a sua influência sobre os deslocamentos, tensões e deformações que ocorrem numa peça; b) o método híbrido dos elementos finitos/volumes finitos para a discretização das equações de Navier-Stokes e a análise do escoamento de fluidos; c) um algoritmo genético para a obtenção da solução óptima de um problema estrutural. O projecto em engenharia é uma actividade cada vez mais complexa, que requer o uso de ferramentas computacionais sofisticadas tais como os programas ANSYS e MATLAB que foram utilizados no estudo. A criação de modelos numéricos e a análise do seu comportamento com estas ferramentas requer simultaneamente um bom conhecimento dos princípios que estão na base do seu desenvolvimento e uma boa perícia na sua manipulação. Com elas é possível obter soluções quando os constrangimentos do projecto são exigentes e análises detalhadas do comportamento estrutural são necessárias. Neste estudo pretende-se também demonstrar que uma combinação inovadora destas ferramentas pode contribuir para obter aplicações úteis para a actividade de projecto em engenharia.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia do Ambiente - Sistemas Ambientais

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Radio frequency (RF) energy harvesting is an emerging technology that will enable to drive the next generation of wireless sensor networks (WSNs) without the need of using batteries. In this paper, we present RF energy harvesting circuits specifically developed for GSM bands (900/1800) and a wearable dual-band antenna suitable for possible implementation within clothes for body worn applications. Besides, we address the development and experimental characterization of three different prototypes of a five-stage Dickson voltage multiplier (with match impedance circuit) responsible for harvesting the RF energy. Different printed circuit board (PCB) fabrication techniques to produce the prototypes result in different values of conversion efficiency. Therefore, we conclude that if the PCB fabrication is achieved by means of a rigorous control in the photo-positive method and chemical bath procedure applied to the PCB it allows for attaining better values for the conversion efficiency. All three prototypes (1, 2 and 3) can power supply the IRIS sensor node for RF received powers of -4 dBm, -6 dBm and -5 dBm, and conversion efficiencies of 20, 32 and 26%, respectively. © 2014 IEEE.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this work we present a classification of some of the existing Penalty Methods (denominated the Exact Penalty Methods) and describe some of its limitations and estimated. With these methods we can solve problems of optimization with continuous, discrete and mixing constrains, without requiring continuity, differentiability or convexity. The boarding consists of transforming the original problem, in a sequence of problems without constrains, derivate of the initial, making possible its resolution for the methods known for this type of problems. Thus, the Penalty Methods can be used as the first step for the resolution of constrained problems for methods typically used in by unconstrained problems. The work finishes discussing a new class of Penalty Methods, for nonlinear optimization, that adjust the penalty parameter dynamically.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para a obtenção do grau de Mestre em Engenharia Electrotécnica e de Computadores

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A construction project is a group of discernible tasks or activities that are conduct-ed in a coordinated effort to accomplish one or more objectives. Construction projects re-quire varying levels of cost, time and other resources. To plan and schedule a construction project, activities must be defined sufficiently. The level of detail determines the number of activities contained within the project plan and schedule. So, finding feasible schedules which efficiently use scarce resources is a challenging task within project management. In this context, the well-known Resource Constrained Project Scheduling Problem (RCPSP) has been studied during the last decades. In the RCPSP the activities of a project have to be scheduled such that the makespan of the project is minimized. So, the technological precedence constraints have to be observed as well as limitations of the renewable resources required to accomplish the activities. Once started, an activity may not be interrupted. This problem has been extended to a more realistic model, the multi-mode resource con-strained project scheduling problem (MRCPSP), where each activity can be performed in one out of several modes. Each mode of an activity represents an alternative way of combining different levels of resource requirements with a related duration. Each renewable resource has a limited availability for the entire project such as manpower and machines. This paper presents a hybrid genetic algorithm for the multi-mode resource-constrained pro-ject scheduling problem, in which multiple execution modes are available for each of the ac-tivities of the project. The objective function is the minimization of the construction project completion time. To solve the problem, is applied a two-level genetic algorithm, which makes use of two separate levels and extend the parameterized schedule generation scheme. It is evaluated the quality of the schedules and presents detailed comparative computational re-sults for the MRCPSP, which reveal that this approach is a competitive algorithm.