900 resultados para Mapping the Building and Construction Product System


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Audit report of the Iowa Public Employees’ Retirement System (IPERS) as of June 30, 2013 and 2012

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A score system integrating the evolution of efficacy and tolerability over time was applied to a subpopulation of the STRATHE trial, a trial performed according to a parallel group design, with a double-blind, random allocation to either a fixed-dose combination strategy (perindopril/indapamide 2 mg/0.625 mg, with the possibility to increase the dose to 3 mg/0.935 mg, and 4 mg/1.250 mg if needed, n = 118), a sequential monotherapy approach (atenolol 50 mg, followed by losartan 50 mg and amlodipine 5 mg if needed, n = 108), or a stepped-care strategy (valsartan 40 mg, followed by valsartan 80 mg and valsartan 80 mg+ hydrochlorothiazide 12.5 mg if needed, n = 103). The aim was to lower blood pressure below 140/90 mmHg within a 9-month period. The treatment could be adjusted after 3 and 6 months. Only patients in whom the study protocol was strictly applied were included in this analysis. At completion of the trial the total score averaged 13.1 +/- 70.5 (mean +/- SD) using the fixed-dose combination strategy, compared with -7.2 +/- 81.0 using the sequential monotherapy approach and -17.5 +/- 76.4 using the stepped-care strategy. In conclusion, the use of a score system allows the comparison of antihypertensive therapeutic strategies, taking into account at the same time efficacy and tolerability. In the STRATHE trial the best results were observed with the fixed-dose combination containing low doses of an angiotensin enzyme converting inhibitor (perindopril) and a diuretic (indapamide).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report on a review of selected general and application controls over the Iowa Public Employees’ Retirement System I-Que Pension Administration System for the period May 20, 2013 through July 12, 2013

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report of recommendations of the Iowa Public Employees’ Retirement System for the years ended June 30, 2013 and June 30, 2012

Relevância:

100.00% 100.00%

Publicador:

Resumo:

High-grade gliomas represent a group of aggressive brain tumors with poor prognosis due to an inherent capacity of persistent cell growth and survival. The ubiquitin-proteasome system (UPS) is an intracellular machinery responsible for protein turnover. Emerging evidence implicates various proteins targeted for degradation by the UPS in key survival and proliferation signaling pathways of these tumors. In this review, we discuss the involvement of UPS in the regulation of several mediators and effectors of these pathways in malignant gliomas.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This phase of the research project involved two major efforts: (1) Complete the implementation of AEC-Sync (formerly known as Attolist) on the Iowa Falls Arch Bridge project and (2) develop a web-based project management system (WPMS) for projects under $10 million. For the first major effort, AEC-Sync was provided for the Iowa Department of Transportation (DOT) in a software as a service agreement, allowing the Iowa DOT to rapidly implement the solution with modest effort. During the 2010 fiscal year, the research team was able to help with the implementation process for the solution. The research team also collected feedback from the Broadway Viaduct project team members before the start of the project and implementation of the solution. For the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The result of the AEC-Sync implementation in the Broadway Viaduct project was a positive one. The project members were satisfied with the performance of AEC-Sync and how it facilitated document management and transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge project. During the 2012 fiscal year, the research team analyzed the post-project surveys for the Iowa Falls Arch Bridge project AEC-Sync implementation and found a positive outcome when compared to the pre-project surveys. The second major effort for this project involved the identification and implementation of a WPMS solution for smaller bridge and highway projects. During the 2011 fiscal year, Microsoft SharePoint was selected to be implemented on these smaller highway projects. In this year, workflows for the shop/working drawings for the smaller highway projects specified in Section 1105 of the Iowa DOT Specifications were developed. These workflows will serve as the guide for the development of the SharePoint pages. In order to implement the Microsoft SharePoint pages, the effort of an integrated team proved to be vital because it brought together the expertise required from researchers, programmers, and webpage developers to develop the SharePoint pages.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report on a review of selected general and application controls over the Iowa Public Employees’ Retirement System I-Que Pension Administration System for the period May 5, 2014 through July 1, 2014

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pseudomonas fluorescens CHA0, an effective biological control agent of soilborne plant diseases, is naturally non-mucoid. We have isolated a highly mucoid Tn5 insertion mutant of strain CHA0. The mucoid phenotype was found to be due to the overproduction of exopolysaccharide (EPS), as a result of a mutation in the mucA gene. The wild-type mucA gene was cloned by a two-step, Tn5-dependent cloning procedure previously described and the deduced amino acid sequence showed 71% identity with MucA of P. aeruginosa, a negative regulator of the alternative sigma factor AlgU (=s22, sE). As in P. aeruginosa, mucA is preceded by the algU gene encoding s22 (91% identity at the amino acid sequence level). A mucA in-frame deletion mutant of CHA0 overproduced EPS and formed mucoid colonies, whereas an algU in-frame deletion mutant showed a non-mucoid phenotype. Pyoluteorin, an antibiotic produced by P. fluorescens, was found to be entrapped in EPS of a mucoid mutant. In natural soil, mucoidy negatively affected survival of the bacteria, suggesting that under these conditions the potential to produce abundant EPS does not confer a selective advantage on the bacteria.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report on the Iowa Public Employees’ Retirement System and schedules of employer allocations and collective pension amounts allocated by employer for the year ended June 30, 2014

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report on the Iowa Public Employees’ Retirement System and schedules of employer allocations and collective pension amounts allocated by employer for the year ended June 30, 2013

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Leishmania spp. are intracellular protozoan parasites that are delivered within the dermis of their vertebrate hosts. Within this peripheral tissue and the draining lymph node, they find and/or rapidly create dynamic microenvironments that determine their ultimate fate, namely their more or less successful expansion, and favour their transmission to another vertebrate host though a blood-feeding vector. Depending on their genetic characteristics as well as the genetic make-up of their hosts, once within the dermis Leishmania spp. very rapidly drive and maintain sustained T cell-dependent immune responses that arbitrate their ultimate fate within their hosts. The analysis of the parasitism exerted by Leishmania major in mice of different genetic backgrounds has allowed us to recognize some of the early and late mechanisms driven by this parasite that lead to either uncontrolled or restricted parasitism. Uncontrolled parasitism by Leishmania major characterizing mice from a few inbred strains (e.g. BALB/c) is associated with the expansion of parasite reactive Th2 CD4 lymphocytes and results from their rapid and sustained activity. In contrast, restricted parasitism characteristic of mice from the majority of inbred strains results from the development of a polarized parasite-specific Th1 CD4 response. This murine model of infection has already been and will continue to be particularly instrumental in dissecting the rules controlling the pathway of differentiation of T cells in vivo. In the long run, the understanding of these rules should contribute to the rational development of novel immunotherapeutic interventions against severe infectious diseases.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report on a review of selected general and application controls over the University of Northern Iowa Facility Administration and Maintenance Information System for the period April 29, 2014 through June 5, 2014

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The global structural connectivity of the brain, the human connectome, is now accessible at millimeter scale with the use of MRI. In this paper, we describe an approach to map the connectome by constructing normalized whole-brain structural connection matrices derived from diffusion MRI tractography at 5 different scales. Using a template-based approach to match cortical landmarks of different subjects, we propose a robust method that allows (a) the selection of identical cortical regions of interest of desired size and location in different subjects with identification of the associated fiber tracts (b) straightforward construction and interpretation of anatomically organized whole-brain connection matrices and (c) statistical inter-subject comparison of brain connectivity at various scales. The fully automated post-processing steps necessary to build such matrices are detailed in this paper. Extensive validation tests are performed to assess the reproducibility of the method in a group of 5 healthy subjects and its reliability is as well considerably discussed in a group of 20 healthy subjects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

With an annual pavement marking program of approximately $2 million and another $750 thousand invested in maintenance of durable markings each year, the Iowa DOT is seeking every opportunity to provide all-year markings staying in acceptable condition under all weather conditions. The goal of this study is to analyze existing pavement marking practices and to develop a prototype Pavement Marking Management System (PMMS). This report documents the first two phases of a three-phase research project. Phase I includes an overview of the Iowa DOT’s existing practices and a literature review regarding pavement marking practices in other states. Based on this information, a work plan was developed for Phases II and III of this study. Phase II organized the key components necessary to develop a prototype PMMS for the Iowa DOT. The two primary components are (1) performance/life cycle curves for pavement marking products, and (2) an application matrix tailored to the pavement marking products and roadway and environmental conditions faced by the Iowa DOT. Both components will continue to be refined and tailored to Iowa materials and conditions as more performance data becomes available.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mixture materials, mix design, and pavement construction are not isolated steps in the concrete paving process. Each affects the other in ways that determine overall pavement quality and long-term performance. However, equipment and procedures commonly used to test concrete materials and concrete pavements have not changed in decades, leaving gaps in our ability to understand and control the factors that determine concrete durability. The concrete paving community needs tests that will adequately characterize the materials, predict interactions, and monitor the properties of the concrete. The overall objectives of this study are (1) to evaluate conventional and new methods for testing concrete and concrete materials to prevent material and construction problems that could lead to premature concrete pavement distress and (2) to examine and refine a suite of tests that can accurately evaluate concrete pavement properties. The project included three phases. In Phase I, the research team contacted each of 16 participating states to gather information about concrete and concrete material tests. A preliminary suite of tests to ensure long-term pavement performance was developed. The tests were selected to provide useful and easy-to-interpret results that can be performed reasonably and routinely in terms of time, expertise, training, and cost. The tests examine concrete pavement properties in five focal areas critical to the long life and durability of concrete pavements: (1) workability, (2) strength development, (3) air system, (4) permeability, and (5) shrinkage. The tests were relevant at three stages in the concrete paving process: mix design, preconstruction verification, and construction quality control. In Phase II, the research team conducted field testing in each participating state to evaluate the preliminary suite of tests and demonstrate the testing technologies and procedures using local materials. A Mobile Concrete Research Lab was designed and equipped to facilitate the demonstrations. This report documents the results of the 16 state projects. Phase III refined and finalized lab and field tests based on state project test data. The results of the overall project are detailed herein. The final suite of tests is detailed in the accompanying testing guide.