971 resultados para Effective range
Resumo:
Despite recent developments in fixed-film combined biological nutrients removal (BNR) technology; fixed-film systems (i.e., biofilters), are still at the early stages of development and their application has been limited to a few laboratory-scale experiments. Achieving enhanced biological phosphorus removal in fixed-film systems requires exposing the micro-organisms and the waste stream to alternating anaerobic/aerobic or anaerobic/anoxic conditions in cycles. The concept of cycle duration (CD) as a process control parameter is unique to fixed-film BNR systems, has not been previously investigated, and can be used to optimise the performance of such systems. The CD refers to the elapsed time before the biomass is re-exposed to the same environmental conditions in cycles. Fixed-film systems offer many advantages over suspended growth systems such as reduced operating costs, simplicity of operation, absence of sludge recycling problems, and compactness. The control of nutrient discharges to water bodies, improves water quality, fish production, and allow water reuse. The main objective of this study was to develop a fundamental understanding of the effect of CD on the transformations of nutrients in fixed-film biofilter systems subjected to alternating aeration I no-aeration cycles A fixed-film biofilter system consisting of three up-flow biofilters connected in series was developed and tested. The first and third biofilters were operated in a cyclic mode in which the biomass was subjected to aeration/no-aeration cycles. The influent wastewater was simulated aquaculture whose composition was based on actual water quality parameters of aquacuture wastewater from a prawn grow-out facility. The influent contained 8.5 - 9:3 mg!L a111monia-N, 8.5- 8.7 mg/L phosphate-P, and 45- 50 mg!L acetate. Two independent studies were conducted at two biofiltration rates to evaluate and confirm the effect of CD on nutrient transformations in the biofilter system for application in aquaculture: A third study was conducted to enhance denitrification in the system using an external carbon- source at a rate varying from 0-24 ml/min. The CD was varied in the range of0.25- 120 hours for the first two studies and fixed at 12 hours for the third study. This study identified the CD as an important process control parameter that can be used to optimise the performance of full-scale fixed-film systems for BNR which represents a novel contribution in this field of research. The CD resulted in environmental conditions that inhibited or enhanced nutrient transformations. The effect of CD on BNR in fixed-film systems in terms of phosphorus biomass saturation and depletion has been established. Short CDs did not permit the establishment of anaerobic activity in the un-aerated biofilter and, thus, inhibited phosphorus release. Long CDs resulted in extended anaerobic activity and, thus, resulted in active phosphorus release. Long CDs, however, resulted in depleting the biomass phosphorus reservoir in the releasing biofilter and saturating the biomass phosphorus reservoir in the up-taking biofilter in the cycle. This phosphorus biomass saturation/depletion phenomenon imposes a practical limit on how short or long the CD can be. The length of the CD should be somewhere just before saturation or depletion occur and for the system tested, the optimal CD was 12 hours for the biofiltration rates tested. The system achieved limited net phosphorus removal due to the limited sludge wasting and lack of external carbon supply during phosphorus uptake. The phosphorus saturation and depletion reflected the need to extract phosphorus from the phosphorus-rich micro-organisms, for example, through back-washing. The major challenges of achieving phosphorus removal in the system included: (I) overcoming the deterioration in the performance of the system during the transition period following the start of each new cycle; and (2) wasting excess phosphorus-saturated biomass following the aeration cycle. Denitrification occurred in poorly aerated sections of the third biofilter and generally declined as the CD increased and as the time progressed in the individual cycle. Denitrification and phosphorus uptake were supplied by an internal organic carbon source, and the addition of an external carbon source (acetate) to the third biofilter resulted in improved denitrification efficiency in the system from 18.4 without supplemental carbon to 88.7% when the carbon dose reached 24 mL/min The removal of TOC and nitrification improved as the CD increased, as a result of the reduction in the frequency of transition periods between the cycles. A conceptual design of an effective fixed-film BNR biofilter system for the treatment of the influent simulated aquaculture wastewater was proposed based on the findings of the study.
Resumo:
This thesis deals with the problem of the instantaneous frequency (IF) estimation of sinusoidal signals. This topic plays significant role in signal processing and communications. Depending on the type of the signal, two major approaches are considered. For IF estimation of single-tone or digitally-modulated sinusoidal signals (like frequency shift keying signals) the approach of digital phase-locked loops (DPLLs) is considered, and this is Part-I of this thesis. For FM signals the approach of time-frequency analysis is considered, and this is Part-II of the thesis. In part-I we have utilized sinusoidal DPLLs with non-uniform sampling scheme as this type is widely used in communication systems. The digital tanlock loop (DTL) has introduced significant advantages over other existing DPLLs. In the last 10 years many efforts have been made to improve DTL performance. However, this loop and all of its modifications utilizes Hilbert transformer (HT) to produce a signal-independent 90-degree phase-shifted version of the input signal. Hilbert transformer can be realized approximately using a finite impulse response (FIR) digital filter. This realization introduces further complexity in the loop in addition to approximations and frequency limitations on the input signal. We have tried to avoid practical difficulties associated with the conventional tanlock scheme while keeping its advantages. A time-delay is utilized in the tanlock scheme of DTL to produce a signal-dependent phase shift. This gave rise to the time-delay digital tanlock loop (TDTL). Fixed point theorems are used to analyze the behavior of the new loop. As such TDTL combines the two major approaches in DPLLs: the non-linear approach of sinusoidal DPLL based on fixed point analysis, and the linear tanlock approach based on the arctan phase detection. TDTL preserves the main advantages of the DTL despite its reduced structure. An application of TDTL in FSK demodulation is also considered. This idea of replacing HT by a time-delay may be of interest in other signal processing systems. Hence we have analyzed and compared the behaviors of the HT and the time-delay in the presence of additive Gaussian noise. Based on the above analysis, the behavior of the first and second-order TDTLs has been analyzed in additive Gaussian noise. Since DPLLs need time for locking, they are normally not efficient in tracking the continuously changing frequencies of non-stationary signals, i.e. signals with time-varying spectra. Nonstationary signals are of importance in synthetic and real life applications. An example is the frequency-modulated (FM) signals widely used in communication systems. Part-II of this thesis is dedicated for the IF estimation of non-stationary signals. For such signals the classical spectral techniques break down, due to the time-varying nature of their spectra, and more advanced techniques should be utilized. For the purpose of instantaneous frequency estimation of non-stationary signals there are two major approaches: parametric and non-parametric. We chose the non-parametric approach which is based on time-frequency analysis. This approach is computationally less expensive and more effective in dealing with multicomponent signals, which are the main aim of this part of the thesis. A time-frequency distribution (TFD) of a signal is a two-dimensional transformation of the signal to the time-frequency domain. Multicomponent signals can be identified by multiple energy peaks in the time-frequency domain. Many real life and synthetic signals are of multicomponent nature and there is little in the literature concerning IF estimation of such signals. This is why we have concentrated on multicomponent signals in Part-H. An adaptive algorithm for IF estimation using the quadratic time-frequency distributions has been analyzed. A class of time-frequency distributions that are more suitable for this purpose has been proposed. The kernels of this class are time-only or one-dimensional, rather than the time-lag (two-dimensional) kernels. Hence this class has been named as the T -class. If the parameters of these TFDs are properly chosen, they are more efficient than the existing fixed-kernel TFDs in terms of resolution (energy concentration around the IF) and artifacts reduction. The T-distributions has been used in the IF adaptive algorithm and proved to be efficient in tracking rapidly changing frequencies. They also enables direct amplitude estimation for the components of a multicomponent
Resumo:
LiteSteel Beam (LSB) is a new cold-formed steel beam produced by OneSteel Australian Tube Mills. The new beam is effectively a channel section with two rectangular hollow flanges and a slender web, and is manufactured using a combined cold-forming and electric resistance welding process. OneSteel Australian Tube Mills is promoting the use of LSBs as flexural members in a range of applications, such as floor bearers. When LSBs are used as back to back built-up sections, they are likely to improve their moment capacity and thus extend their applications further. However, the structural behaviour of built-up beams is not well understood. Many steel design codes include guidelines for connecting two channels to form a built-up I-section including the required longitudinal spacing of connections. But these rules were found to be inadequate in some applications. Currently the safe spans of builtup beams are determined based on twice the moment capacity of a single section. Research has shown that these guidelines are conservative. Therefore large scale lateral buckling tests and advanced numerical analyses were undertaken to investigate the flexural behaviour of back to back LSBs connected by fasteners (bolts) at various longitudinal spacings under uniform moment conditions. In this research an experimental investigation was first undertaken to study the flexural behaviour of back to back LSBs including its buckling characteristics. This experimental study included tensile coupon tests, initial geometric imperfection measurements and lateral buckling tests. The initial geometric imperfection measurements taken on several back to back LSB specimens showed that the back to back bolting process is not likely to alter the imperfections, and the measured imperfections are well below the fabrication tolerance limits. Twelve large scale lateral buckling tests were conducted to investigate the behaviour of back to back built-up LSBs with various longitudinal fastener spacings under uniform moment conditions. Tests also included two single LSB specimens. Test results showed that the back to back LSBs gave higher moment capacities in comparison with single LSBs, and the fastener spacing influenced the ultimate moment capacities. As the fastener spacing was reduced the ultimate moment capacities of back to back LSBs increased. Finite element models of back to back LSBs with varying fastener spacings were then developed to conduct a detailed parametric study on the flexural behaviour of back to back built-up LSBs. Two finite element models were developed, namely experimental and ideal finite element models. The models included the complex contact behaviour between LSB web elements and intermittently fastened bolted connections along the web elements. They were validated by comparing their results with experimental results and numerical results obtained from an established buckling analysis program called THIN-WALL. These comparisons showed that the developed models could accurately predict both the elastic lateral distortional buckling moments and the non-linear ultimate moment capacities of back to back LSBs. Therefore the ideal finite element models incorporating ideal simply supported boundary conditions and uniform moment conditions were used in a detailed parametric study on the flexural behaviour of back to back LSB members. In the detailed parametric study, both elastic buckling and nonlinear analyses of back to back LSBs were conducted for 13 LSB sections with varying spans and fastener spacings. Finite element analysis results confirmed that the current design rules in AS/NZS 4600 (SA, 2005) are very conservative while the new design rules developed by Anapayan and Mahendran (2009a) for single LSB members were also found to be conservative. Thus new member capacity design rules were developed for back to back LSB members as a function of non-dimensional member slenderness. New empirical equations were also developed to aid in the calculation of elastic lateral distortional buckling moments of intermittently fastened back to back LSBs. Design guidelines were developed for the maximum fastener spacing of back to back LSBs in order to optimise the use of fasteners. A closer fastener spacing of span/6 was recommended for intermediate spans and some long spans where the influence of fastener spacing was found to be high. In the last phase of this research, a detailed investigation was conducted to investigate the potential use of different types of connections and stiffeners in improving the flexural strength of back to back LSB members. It was found that using transverse web stiffeners was the most cost-effective and simple strengthening method. It is recommended that web stiffeners are used at the supports and every third points within the span, and their thickness is in the range of 3 to 5 mm depending on the size of LSB section. The use of web stiffeners eliminated most of the lateral distortional buckling effects and hence improved the ultimate moment capacities. A suitable design equation was developed to calculate the elastic lateral buckling moments of back to back LSBs with the above recommended web stiffener configuration while the same design rules developed for unstiffened back to back LSBs were recommended to calculate the ultimate moment capacities.
Resumo:
With the increasing complexity of modern day threats and the growing sophistication of interlinked and interdependent operating environments, Business Continuity Management (BCM) has emerged as a new discipline, offering a strategic approach to safeguarding organisational functions. Of significant interest is the application of BCM frameworks and strategies within critical infrastructure, and in particular the aviation industry. Given the increased focus on security and safety for critical infrastructures, research into the adoption of BCM principles within an airport environment provides valuable management outcomes and research into a previously neglected area of inquisition. This research has used a single case study methodology to identify possible impediments to BCM adoption and implementation by the Brisbane Airport Corporation (BAC). It has identified a number of misalignments between the required breadth of focus for a BCM program, identified differing views on specific roles and responsibilities required during a major disruptive event and illustrated the complexities of the Brisbane Airport which impede the understanding and implementation of effective Business Continuity Management Strategies.
Resumo:
This thesis is the result of an investigation of a Queensland example of curriculum reform based on outcomes, a type of reform common to many parts of the world during the last decade. The purpose of the investigation was to determine the impact of outcomes on teacher perspectives of professional practice. The focus was chosen to permit investigation not only of changes in behaviour resulting from the reform but also of teachers' attitudes and beliefs developed during implementation. The study is based on qualitative methodology, chosen because of its suitability for the investigation of attitudes and perspectives. The study exploits the researcher's opportunities for prolonged, direct contact with groups of teachers through the selection of an over-arching ethnography approach, an approach designed to capture the holistic nature of the reform and to contextualise the data within a broad perspective. The selection of grounded theory as a basis for data analysis reflects the open nature of this inquiry and demonstrates the study's constructivist assumptions about the production of knowledge. The study also constitutes a multi-site case study by virtue of the choice of three individual school sites as objects to be studied and to form the basis of the report. Three primary school sites administered by Brisbane Catholic Education were chosen as the focus of data collection. Data were collected from three school sites as teachers engaged in the first year of implementation of Student Performance Standards, the Queensland version of English outcomes based on the current English syllabus. Teachers' experience of outcomes-driven curriculum reform was studied by means of group interviews conducted at individual school sites over a period of fourteen months, researcher observations and the collection of artefacts such as report cards. Analysis of data followed grounded theory guidelines based on a system of coding. Though classification systems were not generated prior to data analysis, the labelling of categories called on standard, non-idiosyncratic terminology and analytic frames and concepts from existing literature wherever practicable in order to permit possible comparisons with other related research. Data from school sites were examined individually and then combined to determine teacher understandings of the reform, changes that have been made to practice and teacher responses to these changes in terms of their perspectives of professionalism. Teachers in the study understood the reform as primarily an accountability mechanism. Though teachers demonstrated some acceptance of the intentions of the reform, their responses to its conceptualisation, supporting documentation and implications for changing work practices were generally characterised by reduced confidence, anger and frustration. Though the impact of outcomes-based curriculum reform must be interpreted through the inter-relationships of a broad range of elements which comprise teachers' work and their attitudes towards their work, it is proposed that the substantive findings of the study can be understood in terms of four broad themes. First, when the conceptual design of outcomes did not serve teachers' accountability requirements and outcomes were perceived to be expressed in unfamiliar technical language, most teachers in the study lost faith in the value of the reform and lost confidence in their own abilities to understand or implement it. Second, this reduction of confidence was intensified when the scope of outcomes was outside the scope of the teachers' existing curriculum and assessment planning and teachers were confronted with the necessity to include aspects of syllabuses or school programs which they had previously omitted because of a lack of understanding or appreciation. The corollary was that outcomes promoted greater syllabus fidelity when frameworks were closely aligned. Third, other benefits the teachers associated with outcomes included the development of whole school curriculum resources and greater opportunity for teacher collaboration, particularly among schools. The teachers, however, considered a wide range of factors when determining the overall impact of the reform, and perceived a number of them in terms of the costs of implementation. These included the emergence of ethical dilemmas concerning relationships with students, colleagues and parents, reduced individual autonomy, particularly with regard to the selection of valued curriculum content and intensification of workload with the capacity to erode the relationships with students which teachers strongly associated with the rewards of their profession. Finally, in banding together at the school level to resist aspects of implementation, some teachers showed growing awareness of a collective authority capable of being exercised in response to top-down reform. These findings imply that Student Performance Standards require review and, additional implementation resourcing to support teachers through times of reduced confidence in their own abilities. Outcomes prove an effective means of high-fidelity syllabus implementation, and, provided they are expressed in an accessible way and aligned with syllabus frameworks and terminology, should be considered for inclusion in future syllabuses across a range of learning areas. The study also identifies a range of unintended consequences of outcomes-based curriculum and acknowledges the complexity of relationships among all the aspects of teachers' work. It also notes that the impact of reform on teacher perspectives of professional practice may alter teacher-teacher and school-system relationships in ways that have the potential to influence the effectiveness of future curriculum reform.
Resumo:
This thesis is a problematisation of the teaching of art to young children. To problematise a domain of social endeavour, is, in Michel Foucault's terms, to ask how we come to believe that "something ... can and must be thought" (Foucault, 1985:7). The aim is to document what counts (i.e., what is sayable, thinkable, feelable) as proper art teaching in Queensland at this point ofhistorical time. In this sense, the thesis is a departure from more recognisable research on 'more effective' teaching, including critical studies of art teaching and early childhood teaching. It treats 'good teaching' as an effect of moral training made possible through disciplinary discourses organised around certain epistemic rules at a particular place and time. There are four key tasks accomplished within the thesis. The first is to describe an event which is not easily resolved by means of orthodox theories or explanations, either liberal-humanist or critical ones. The second is to indicate how poststructuralist understandings of the self and social practice enable fresh engagements with uneasy pedagogical moments. What follows this discussion is the documentation of an empirical investigation that was made into texts generated by early childhood teachers, artists and parents about what constitutes 'good practice' in art teaching. Twenty-two participants produced text to tell and re-tell the meaning of 'proper' art education, from different subject positions. Rather than attempting to capture 'typical' representations of art education in the early years, a pool of 'exemplary' teachers, artists and parents were chosen, using "purposeful sampling", and from this pool, three videos were filmed and later discussed by the audience of participants. The fourth aspect of the thesis involves developing a means of analysing these texts in such a way as to allow a 're-description' of the field of art teaching by attempting to foreground the epistemic rules through which such teacher-generated texts come to count as true ie, as propriety in art pedagogy. This analysis drew on Donna Haraway's (1995) understanding of 'ironic' categorisation to hold the tensions within the propositions inside the categories of analysis rather than setting these up as discursive oppositions. The analysis is therefore ironic in the sense that Richard Rorty (1989) understands the term to apply to social scientific research. Three 'ironic' categories were argued to inform the discursive construction of 'proper' art teaching. It is argued that a teacher should (a) Teach without teaching; (b) Manufacture the natural; and (c) Train for creativity. These ironic categories work to undo modernist assumptions about theory/practice gaps and finding a 'balance' between oppositional binary terms. They were produced through a discourse theoretical reading of the texts generated by the participants in the study, texts that these same individuals use as a means of discipline and self-training as they work to teach properly. In arguing the usefulness of such approaches to empirical data analysis, the thesis challenges early childhood research in arts education, in relation to its capacity to deal with ambiguity and to acknowledge contradiction in the work of teachers and in their explanations for what they do. It works as a challenge at a range of levels - at the level of theorising, of method and of analysis. In opening up thinking about normalised categories, and questioning traditional Western philosophy and the grand narratives of early childhood art pedagogy, it makes a space for re-thinking art pedagogy as "a game oftruth and error" (Foucault, 1985). In doing so, it opens up a space for thinking how art education might be otherwise.
Resumo:
The effective daylighting of multistorey commercial building interiors poses an interesting problem for designers in Australia’s tropical and subtropical context. Given that a building exterior receives adequate sun and skylight as dictated by location-specific factors such as weather, siting and external obstructions; then the availability of daylight throughout its interior is dependant on certain building characteristics: the distance from a window façade (room depth), ceiling or window head height, window size and the visible transmittance of daylighting apertures. The daylighting of general stock, multistorey commercial buildings is made difficult by their design limitations with respect to some of these characteristics. The admission of daylight to these interiors is usually exclusively by vertical windows. Using conventional glazing, such windows can only admit sun and skylight to a depth of approximately 2 times the window height. This penetration depth is typically much less than the depth of the office interiors, so that core areas of these buildings receive little or no daylight. This issue is particularly relevant where deep, open plan office layouts prevail. The resulting interior daylight pattern is a relatively narrow perimeter zone bathed in (sometimes too intense) light, contrasted with a poorly daylit core zone. The broad luminance range this may present to a building occupant’s visual field can be a source of discomfort glare. Furthermore, the need in most tropical and subtropical regions to restrict solar heat gains to building interiors for much of the year has resulted in the widespread use of heavily tinted or reflective glazing on commercial building façades. This strategy reduces the amount of solar radiation admitted to the interior, thereby decreasing daylight levels proportionately throughout. However this technique does little to improve the way light is distributed throughout the office space. Where clear skies dominate weather conditions, at different times of day or year direct sunlight may pass unobstructed through vertical windows causing disability or discomfort glare for building occupants and as such, its admission to an interior must be appropriately controlled. Any daylighting system to be applied to multistorey commercial buildings must consider these design obstacles, and attempt to improve the distribution of daylight throughout these deep, sidelit office spaces without causing glare conditions. The research described in this thesis delineates first the design optimisation and then the actual prototyping and manufacture process of a daylighting device to be applied to such multistorey buildings in tropical and subtropical environments.