915 resultados para Drilled shaft foundations


Relevância:

20.00% 20.00%

Publicador:

Resumo:

BACKGROUND: The use of conventional implants for intramedullary nailing of humeral shaft fractures is associated with specific difficulties. During antegrade implantation structures of the rotator cuff can be affected leading to a reduced functional result of the shoulder. If the nail is implanted in a retrograde manner problems arise due to a relatively large hole close to or within the olecranon fossa, which is necessary for insertion of the nail. Supracondylar fractures as well as persistent elbow pain and loss of function are reported in the literature. To overcome these disadvantages a flexible nail has been developed that can be stiffened and locked after implantation. METHOD: Between October 2000 and February 2002, 34 patients were treated with the flexible nail at our institution; 29 were available for follow-up. Fracture healing was documented on radiographs and clinical outcome was evaluated with use of the Constant as well as the Kwasny score. RESULTS: Median duration until fracture consolidation was 10 weeks. In two patients fracture union was not achieved within the follow-up period. The median outcome measured with the Constant score was 93 points and 2.5 with the Kwasny score. Both values correspond to a very good functional outcome. CONCLUSION: We conclude that the flexible humeral nail is an excellent treatment option for humeral shaft fractures. Damage to the rotator cuff and the distal humerus can be avoided due to its unique flexible construction, improving the functional outcome of intramedullary nailing for the treatment of humeral shaft fractures.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

BACKGROUND: The inevitable detachment of tendons and the loss of the forefoot in Chopart and Lisfranc amputations result in equinus and varus of the residual foot. In an insensate foot these deformities can lead to keratotic lesions and ulcerations. The currently available prostheses cannot safely counteract the deforming forces and the resulting complications. METHODS: A new below-knee prosthesis was developed, combining a soft socket with a rigid shaft. The mold is taken with the foot in the corrected position. After manufacturing the shaft, the lateral third of the circumference of the shaft is cut away and reattached distally with a hinge, creating a lateral flap. By closing this flap the hindfoot is gently levered from the varus position into valgus. Ten patients (seven amputations at the Chopart-level, three amputations at the Lisfranc-level) with insensate feet were fitted with this prosthesis at an average of 3 (range 1.5 to 9) months after amputation. The handling, comfort, time of daily use, mobility, correction of malposition and complications were recorded to the latest followup (average 31 months, range 24 to 37 months after amputation). RESULTS: Eight patients evaluated the handling as easy, two as difficult. No patient felt discomfort in the prosthesis. The average time of daily use was 12 hours, and all patients were able to walk. All varus deformities were corrected in the prosthesis. Sagittal alignment was kept neutral. Complications were two minor skin lesions and one small ulcer, all of which responded to conservative treatment, and one ulcer healed after debridement and lengthening of the Achilles tendon. CONCLUSIONS: The "flap-shaft" prosthesis is a valuable option for primary or secondary prosthetic fitting of Chopart-level and Lisfranc-level amputees with insensate feet and flexible equinus and varus deformity at risk for recurrent ulceration. It provided safe and sufficient correction of malpositions and enabled the patients to walk as much as their general condition permitted.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Since the introduction of the rope-pump in Nicaragua in the 1990s, the dependence on wells in rural areas has grown steadily. However, little or no attention is paid to rope-pump well performance after installation. Due to financial restraints, groundwater resource monitoring using conventional testing methods is too costly and out of reach of rural municipalities. Nonetheless, there is widespread agreement that without a way to quantify the changes in well performance over time, prioritizing regulatory actions is impossible. A manual pumping test method is presented, which at a fraction of the cost of a conventional pumping test, measures the specific capacity of rope-pump wells. The method requires only sight modifcations to the well and reasonable limitations on well useage prior to testing. The pumping test was performed a minimum of 33 times in three wells over an eight-month period in a small rural community in Chontales, Nicaragua. Data was used to measure seasonal variations in specific well capacity for three rope-pump wells completed in fractured crystalline basalt. Data collected from the tests were analyzed using four methods (equilibrium approximation, time-drawdown during pumping, time-drawdown during recovery, and time-drawdown during late-time recovery) to determine the best data-analyzing method. One conventional pumping test was performed to aid in evaluating the manual method. The equilibrim approximation can be performed while in the field with only a calculator and is the most technologically appropriate method for analyzing data. Results from this method overestimate specific capacity by 41% when compared to results from the conventional pumping test. The other analyes methods, requiring more sophisticated tools and higher-level interpretation skills, yielded results that agree to within 14% (pumping phase), 31% (recovery phase) and 133% (late-time recovery) of the conventional test productivity value. The wide variability in accuracy results principally from difficulties in achieving equilibrated pumping level and casing storage effects in the puping/recovery data. Decreases in well productivity resulting from naturally occuring seasonal water-table drops varied from insignificant in two wells to 80% in the third. Despite practical and theoretical limitations on the method, the collected data may be useful for municipal institutions to track changes in well behavior, eventually developing a database for planning future ground water development projects. Furthermore, the data could improve well-users’ abilities to self regulate well usage without expensive aquifer characterization.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Manual drilling is a popular solution for programs seeking to increase drinking water supply in rural Madagascar. Lightweight, affordable and locally produced drilling equipment allows rapid implementation where access is problematic and funds are limited. This report will look at the practical implications of using manual drilling as a one-step solution to potable water in rural development. The main benefits of using these techniques are time and cost savings. The author uses his experience managing a drilling campaign in northeastern Madagascar to explore the benefits and limitations of one particular drilling methodology – BushProof’s Madrill technique. Just under 200 wells were drilled using this method in the course of one fiscal year (September 2011-September 2012). The paper explores what compromises must be considered in the quest for cost-effective boreholes and whether everybody - from the implementers to project managers to clients and lawmakers - are in agreement about the consequences of such compromises. The paper also discusses water quality issues encountered when drilling in shallow aquifers.

Relevância:

20.00% 20.00%

Publicador: