988 resultados para Dominant process
Resumo:
Business process models are becoming available in large numbers due to their popular use in many industrial applications such as enterprise and quality engineering projects. On the one hand, this raises a challenge as to their proper management: How can it be ensured that the proper process model is always available to the interested stakeholder? On the other hand, the richness of a large set of process models also offers opportunities, for example with respect to the re-use of existing model parts for new models. This paper describes the functionalities and architecture of an advanced process model repository, named APROMORE. This tool brings together a rich set of features for the analysis, management and usage of large sets of process models, drawing from state-of-the art research in the field of process modeling. A prototype of the platform is presented in this paper, demonstrating its feasibility, as well as an outlook on the further development of APROMORE.
Resumo:
Climate change is becoming increasingly apparent that is largely caused by human activities such as asset management processes, from planning to disposal, of property and infrastructure. One essential component of asset management process is asset identification. The aims of the study are to identify the information needed in asset identification and inventory as one of public asset management process in addressing the climate change issue; and to examine its deliverability in developing countries’ local governments. In order to achieve its aims, this study employs a case study in Indonesia. This study only discusses one medium size provincial government in Indonesia. The information is gathered through interviews of the local government representatives in South Sulawesi Province, Indonesia and document analysis provided by interview participants. The study found that for local government, improving the system in managing their assets is one of emerging biggest challenge. Having the right information in the right place and at the right time are critical factors in response to this challenge. Therefore, asset identification as the frontline step in public asset management system is holding an important and critical role. Furthermore, an asset identification system should be developed to support the mainstream of adaptation to climate change vulnerability and to help local government officers to be environmentally sensitive. Finally, findings from this study provide useful input for the policy makers, scholars and asset management practitioners to develop an asset inventory system as a part of public asset management process in addressing the climate change.
Resumo:
Process modeling is a central element in any approach to Business Process Management (BPM). However, what hinders both practitioners and academics is the lack of support for assessing the quality of process models – let alone realizing high quality process models. Existing frameworks are highly conceptual or too general. At the same time, various techniques, tools, and research results are available that cover fragments of the issue at hand. This chapter presents the SIQ framework that on the one hand integrates concepts and guidelines from existing ones and on the other links these concepts to current research in the BPM domain. Three different types of quality are distinguished and for each of these levels concrete metrics, available tools, and guidelines will be provided. While the basis of the SIQ framework is thought to be rather robust, its external pointers can be updated with newer insights as they emerge.
Resumo:
In response to the growing proliferation of Business Process Management (BPM) in industry and the demand this creates for BPM expertise, universities across the globe are at various stages of incorporating knowledge and skills in their teaching offerings. However, there are still only a handful of institutions that offer specialized education in BPM in a systematic and in-depth manner. This article is based on a global educators’ panel discussion held at the 2009 European Conference on Information Systems in Verona, Italy. The article presents the BPM programs of five universities from Australia, Europe, Africa, and North America, describing the BPM content covered, program and course structures, and challenges and lessons learned. The article also provides a comparative content analysis of BPM education programs illustrating a heterogeneous view of BPM. The examples presented demonstrate how different courses and programs can be developed to meet the educational goals of a university department, program, or school. This article contributes insights on how best to continuously sustain and reshape BPM education to ensure it remains dynamic, responsive, and sustainable in light of the evolving and ever-changing marketplace demands for BPM expertise.
Resumo:
Since the 1970s the internationalisation process of firms has attracted wide research interest. One of the dominant explanations of firm internationalisation resulting from this research activity is the Uppsala stages model. In this paper, a pre-internationalisation phase is incorporated into the traditional Uppsala model to address the question: What are the antecedents of this model? Four concepts are proposed as the key components that define the experiential learning process underlying a firm’s pre-export phase: export stimuli, attitudinal/psychological commitment, resources and lateral rigidity. Through a survey of 290 Australian exporting and non-exporting small-medium sized firms, data relating to the four pre-internationalisation concepts is collected and an Export Readiness Index (ERI) is constructed through factor analysis. Using logistic regression, the ERI is tested as a tool for analysing export readiness among Australian SMEs.
Resumo:
The research is based on studying the early stage of the design process. It aims to identify differences in design approaches across two design domains. The research is based on the analysis of the observational data from the conceptual stage of (i) product and (ii) software design process. The activities captured from the analysis of the design process are utilized to outline similarities and differences across the two domains. This will contribute to a better understanding of the connections between, and integration of, design process variables, and to a better understanding of design expertise transfer to other domain (e.g., science or nursing).
Resumo:
Business processes have emerged as a well-respected variable in the design of successful corporations. However, unlike other key managerial variables, such as products and services, customers and employees, physical or digital assets, the conceptualization and management of business processes are in many respects in their infancy. In this book, Jan Recker investigates the notion of quality of business process modeling grammars. His evaluation is based on an ontological-, qualitative-, and quantitative analysis, applied to BPMN, a widely-used business process modeling grammar. His results reveal the ontological shortcomings of BPMN and how these manifest themselves in actual process modeling practice, as well as how they influence the usage behavior of modeling practitioners. More generally, his book constitutes a landmark for empirical technology assessment, analyzing the way in which design flaws in technology influence usage behavior.
Resumo:
Delegation is a powerful mechanism to provide flexible and dynamic access control decisions. Delegation is particularly useful in federated environments where multiple systems, with their own security autonomy, are connected under one common federation. Although many delegation schemes have been studied, current models do not seriously take into account the issue of delegation commitment of the involved parties. In order to address this issue, this paper introduces a new mechanism to help parties involved in the delegation process to express commitment constraints, perform the commitments and track the committed actions. This mechanism looks at two different aspects: pre-delegation commitment and post-delegation commitment. In pre-delegation commitment, this mechanism enables the involved parties to express the delegation constraints and address those constraints. The post-delegation commitment phase enables those parties to inform the delegator and service providers how the commitments are conducted. This mechanism utilises a modified SAML assertion structure to support the proposed delegation and constraint approach.
Resumo:
Process modeling is an emergent area of Information Systems research that is characterized through an abundance of conceptual work with little empirical research. To fill this gap, this paper reports on the development and validation of an instrument to measure user acceptance of process modeling grammars. We advance an extended model for a multi-stage measurement instrument development procedure, which incorporates feedback from both expert and user panels. We identify two main contributions: First, we provide a validated measurement instrument for the study of user acceptance of process modeling grammars, which can be used to assist in further empirical studies that investigate phenomena associated with the business process modeling domain. Second, in doing so, we describe in detail a procedural model for developing measurement instruments that ensures high levels of reliability and validity, which may assist fellow scholars in executing their empirical research.
Resumo:
This book is based on a study of a complex project proposal by governments and corporations for a futuristic city, the Multifunction Polis (MFP). It encompasses issues and challenges symptomatic of growth initiatives in the global competitive environment. Academic rigor is applied using corporate strategy and business principles to undertake a detailed analysis of the project proposal & feasibility study and to subsequently construct practical guidelines on how to effectively manage the interpretation & implementation of a large-scale collaborative venture. It specifically addresses a venture which involves fragmented groups representing a diversity of interests but which aspire to related goals and, to this end, there is a need for cooperation & synergy across the planning process.This is an easy to read book of general interest and well suited to practitioners and academics alike. Its relevance is far-reaching, extending to venture situations defined by location, industry, community or social interest, the context, scale and scope of the project, and the role of organization management, project management, market and industry development and public policy. flap text of book
Resumo:
A paper presented at the Rockhampton Women's Business Network Breakfast on 6 October 2000. Breakfast presentations were to be sharing, reflective and a light start to the day.
Resumo:
Online dating networks, a type of social network, are gaining popularity. With many people joining and being available in the network, users are overwhelmed with choices when choosing their ideal partners. This problem can be overcome by utilizing recommendation methods. However, traditional recommendation methods are ineffective and inefficient for online dating networks where the dataset is sparse and/or large and two-way matching is required. We propose a methodology by using clustering, SimRank to recommend matching candidates to users in an online dating network. Data from a live online dating network is used in evaluation. The success rate of recommendation obtained using the proposed method is compared with baseline success rate of the network and the performance is improved by double.
Resumo:
Process models are used by information professionals to convey semantics about the business operations in a real world domain intended to be supported by an information system. The understandability of these models is vital to them being used for information systems development. In this paper, we examine two factors that we predict will influence the understanding of a business process that novice developers obtain from a corresponding process model: the content presentation form chosen to articulate the business domain, and the user characteristics of the novice developers working with the model. Our experimental study provides evidence that novice developers obtain similar levels of understanding when confronted with an unfamiliar or a familiar process model. However, previous modeling experience, the use of English as a second language, and previous work experience in BPM are important influencing factors of model understanding. Our findings suggest that education and research in process modeling should increase the focus on human factors and how they relate to content and content presentation formats for different modeling tasks. We discuss implications for practice and research.
Resumo:
The Granadilla eruption at 600 ka was one of the largest phonolitic explosive eruptions from the Las Cañadas volcano on Tenerife, producing a classical plinian eruptive sequence of a widespread pumice fall deposit overlain by an ignimbrite. The eruption resulted in a major phase of caldera collapse that probably destroyed the shallow-level magma chamber system. Granadilla pumices contain a diverse phenocryst assemblage of alkali feldspar + biotite + sodian diopside to aegirine–augite + titanomagnetite + ilmenite + nosean/haüyne + titanite + apatite; alkali feldspar is the dominant phenocryst and biotite is the main ferromagnesian phase. Kaersutite and partially resorbed plagioclase (oligoclase to sodic andesine) are present in some eruptive units, particularly in pumice erupted during the early plinian phase, and in the Granadilla ignimbrite at the top of the sequence. Associated with the kaersutite and plagioclase are small clots of microlitic plagioclase and kaersutite interpreted as quenched blebs of tephriphonolitic magma within the phonolite pumice. The Granadilla Member has previously been recognized as an example of reverse-then-normal compositional zonation, where the zonation is primarily expressed in terms of substantial variations in trace element abundances with limited major element variation (cryptic zonation). Evidence for cryptic zonation is also provided by the chemistry of the phenocryst phases, and corresponding changes in intensive parameters (e.g. T, f O2, f H2O). Geothermometry estimates indicate that the main body of phonolite magma had a temperature gradient from 860 °C to ∼790 °C, with hotter magma (≥900 °C) tapped at the onset and terminal phases of the eruption. The reverse-then-normal chemical and thermal zonation reflects the initial tapping of a partially hybridized magma (mixing of phonolite and tephriphonolite), followed by the more sequential tapping of a zoned and relatively large body of highly evolved phonolite at a new vent and during the main plinian phase. This suggests that the different magma types within the main holding chamber could have been laterally juxtaposed, as well as in a density-stratified arrangement. Correlations between the presence of mixed phenocryst populations (i.e. presence of plagioclase and kaersutite) and coarser pumice fall layers suggest that increased eruption vigour led to the tapping of hybridized and/or less evolved magma probably from greater depths in the chamber. New oxygen isotope data for glass and mineral separates preclude syn-eruptive interaction between the vesiculating magma and hydrothermal fluids as the cause of the Sr isotope disequilibrium identified previously for the deposit. Enrichment in radiogenic Sr in the pumice glass has more likely been due to low-temperature exchange with meteoric water that was enriched in 87Sr by sea spray, which may be a common process affecting porous and glassy pyroclastic deposits on oceanic islands.
Resumo:
IEC Technical Committee 57 (TC57) published a series of standards and technical reports for “Communication networks and systems for power utility automation” as the IEC 61850 series. Sampled value (SV) process buses allow for the removal of potentially lethal voltages and damaging currents inside substation control rooms and marshalling kiosks, reduce the amount of cabling required in substations, and facilitate the adoption of non-conventional instrument transformers. IEC 61850-9-2 provides an inter-operable solution to support multi-vendor process bus solutions. A time synchronisation system is required for a SV process bus, however the details are not defined in IEC 61850-9-2. IEEE Std 1588-2008, Precision Time Protocol version 2 (PTPv2), provides the greatest accuracy of network based time transfer systems, with timing errors of less than 100 ns achievable. PTPv2 is proposed by the IEC Smart Grid Strategy Group to synchronise IEC 61850 based substation automation systems. IEC 61850-9-2, PTPv2 and Ethernet are three complementary protocols that together define the future of sampled value digital process connections in substations. The suitability of PTPv2 for use with SV is evaluated, with preliminary results indicating that steady state performance is acceptable (jitter < 300 ns), and that extremely stable grandmaster oscillators are required to ensure SV timing requirements are met when recovering from loss of external synchronisation (such as GPS).