947 resultados para DISTRIBUTION SYSTEM


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Elétrica - FEIS

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper presents the development and the main results for an interleaved boost rectifier operating as a special input power stage for a trolleybus type vehicle, allowing its feeding by alternate current (AC) or direct current (DC) distribution power systems. When feeding with two wires (single phase) alternate current distribution system, the converter accomplish active power factor correction, providing a relatively sinusoidal current with low total harmonic distortion (THD) and fully complying with IEC 61000-3-4 standards. In addition, a management control system promotes the required automatic operation changes for the proposed rectifier when the vehicle is changing from the DC distribution power system to the AC distribution power system and vice-versa, keeping its original electrical DC system characteristics for the adjustable speed driver sub-system. The main experimental results for a prototype rated at 150kW are presented, considering its application for a trolleybus with DC adjustable speed driver, demonstrating the proposed converter benefits and the possibility of AC feeding system for trolleybus type vehicle.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Elétrica - FEIS

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The first approach in this work is the concept of the electric power transmission and distribution system, as well as the survey of the current condition of substations chosen to thus identify the importance of having a suitable design with respect to security due to the need to obtain the approval for the operation of the substation according to the standards valid in the country. Present the guidelines and present needs when designing improvements, thus ensuring the company for more safety and reliability. From the company's point of view is an opportunity to reduce the cost of maintenance, and the professional point of view is an opportunity that allows a comprehensive study of legal requirements for the operation of substations

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Over the past two years, Brazil has been facing a major water crisis in its history and the state of Sao Paulo is the one that has been going through worst difficulties. In this scenario, all water users should do everything possible so that the consumption of water resources is carried out in a sustainable manner. In this context, the companies responsible for the public water supply must increase the efficiency of water resource management. It is indispensable combating losses in the public supply system. When there is a non-visible leak in a pipe, the wastewater volume can be high, but in this case, the water returns to nature and continues to participate in the hydrological cycle. The economic loss corresponds to the value added to the product water, which includes the intrinsic costs of exploration, processing and distribution. This damage results in a reduced availability of financial resources of sanitation companies to invest in environmentally friendly solutions. This study aimed to diagnose the water distribution system in the city of Guaratinguetá (SP), held by the Companhia de Serviços de Água, Esgoto e Resíduos de Guaratinguetá (SAEG), to propose measures to combat water loss. Among the proposed measures, there is the monitoring of losses, planning for replacement of old pipes and company awareness as a whole in relation to combat water losses

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The first approach in this work is the concept of the electric power transmission and distribution system, as well as the survey of the current condition of substations chosen to thus identify the importance of having a suitable design with respect to security due to the need to obtain the approval for the operation of the substation according to the standards valid in the country. Present the guidelines and present needs when designing improvements, thus ensuring the company for more safety and reliability. From the company's point of view is an opportunity to reduce the cost of maintenance, and the professional point of view is an opportunity that allows a comprehensive study of legal requirements for the operation of substations

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Over the past two years, Brazil has been facing a major water crisis in its history and the state of Sao Paulo is the one that has been going through worst difficulties. In this scenario, all water users should do everything possible so that the consumption of water resources is carried out in a sustainable manner. In this context, the companies responsible for the public water supply must increase the efficiency of water resource management. It is indispensable combating losses in the public supply system. When there is a non-visible leak in a pipe, the wastewater volume can be high, but in this case, the water returns to nature and continues to participate in the hydrological cycle. The economic loss corresponds to the value added to the product water, which includes the intrinsic costs of exploration, processing and distribution. This damage results in a reduced availability of financial resources of sanitation companies to invest in environmentally friendly solutions. This study aimed to diagnose the water distribution system in the city of Guaratinguetá (SP), held by the Companhia de Serviços de Água, Esgoto e Resíduos de Guaratinguetá (SAEG), to propose measures to combat water loss. Among the proposed measures, there is the monitoring of losses, planning for replacement of old pipes and company awareness as a whole in relation to combat water losses

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The design of a network is a solution to several engineering and science problems. Several network design problems are known to be NP-hard, and population-based metaheuristics like evolutionary algorithms (EAs) have been largely investigated for such problems. Such optimization methods simultaneously generate a large number of potential solutions to investigate the search space in breadth and, consequently, to avoid local optima. Obtaining a potential solution usually involves the construction and maintenance of several spanning trees, or more generally, spanning forests. To efficiently explore the search space, special data structures have been developed to provide operations that manipulate a set of spanning trees (population). For a tree with n nodes, the most efficient data structures available in the literature require time O(n) to generate a new spanning tree that modifies an existing one and to store the new solution. We propose a new data structure, called node-depth-degree representation (NDDR), and we demonstrate that using this encoding, generating a new spanning forest requires average time O(root n). Experiments with an EA based on NDDR applied to large-scale instances of the degree-constrained minimum spanning tree problem have shown that the implementation adds small constants and lower order terms to the theoretical bound.