984 resultados para Control digital


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The first objective of this study was to determine normative digital X-ray radiogrammetry (DXR) values, based on original digital images, in a pediatric population (aged 6-18 years). The second aim was to compare these reference data with patients suffering from distal radius fractures, whereas both cohorts originated from the same geographical region and were evaluated using the same technical parameters as well as inclusion and exclusion criteria. DXR-BMD and DXR-MCI of the metacarpal bones II-IV were assessed on standardized digital hand radiographs, without printing or scanning procedures. DXR parameters were estimated separately by gender and among six age groups; values in the fracture group were compared to age- and gender-matched normative data using Student's t tests and Z scores. In the reference cohort (150 boys, 138 girls), gender differences were found in bone mineral density (DXR-BMD), with higher values for girls from 11 to 14 years and for boys from 15 to 18 years (p < 0.05). Girls had higher normative metacarpal index (DXR-MCI) values than boys, with significant differences at 11-14 years (p < 0.05). In the case-control investigation, the fracture group (95 boys, 69 girls) presented lower DXR-BMD at 15-18 years in boys and 13-16 years in girls vs. the reference cohort (p < 0.05); DXR-MCI was lower at 11-18 years in boys and 11-16 years in girls (p < 0.05). Mean Z scores in the fracture group for DXR-BMD were -0.42 (boys) and -0.46 (girls), and for DXR-MCI were -0.51 (boys) and -0.53 (girls). These findings indicate that the fully digital DXR technique can be accurately applied in pediatric populations ≥ 6 years of age. The lower DXR-BMD and DXR-MCI values in the fracture group suggest promising early identification of individuals with increased fracture risk, without the need for additional radiation exposure, enabling the initiation of prevention strategies to possibly reduce the incidence of osteoporosis later in life.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

PURPOSE To compare time-efficiency in the production of implant crowns using a digital workflow versus the conventional pathway. MATERIALS AND METHODS This prospective clinical study used a crossover design that included 20 study participants receiving single-tooth replacements in posterior sites. Each patient received a customized titanium abutment plus a computer-aided design/computer-assisted manufacture (CAD/CAM) zirconia suprastructure (for those in the test group, using digital workflow) and a standardized titanium abutment plus a porcelain-fused-to-metal crown (for those in the control group, using a conventional pathway). The start of the implant prosthetic treatment was established as the baseline. Time-efficiency analysis was defined as the primary outcome, and was measured for every single clinical and laboratory work step in minutes. Statistical analysis was calculated with the Wilcoxon rank sum test. RESULTS All crowns could be provided within two clinical appointments, independent of the manufacturing process. The mean total production time, as the sum of clinical plus laboratory work steps, was significantly different. The mean ± standard deviation (SD) time was 185.4 ± 17.9 minutes for the digital workflow process and 223.0 ± 26.2 minutes for the conventional pathway (P = .0001). Therefore, digital processing for overall treatment was 16% faster. Detailed analysis for the clinical treatment revealed a significantly reduced mean ± SD chair time of 27.3 ± 3.4 minutes for the test group compared with 33.2 ± 4.9 minutes for the control group (P = .0001). Similar results were found for the mean laboratory work time, with a significant decrease of 158.1 ± 17.2 minutes for the test group vs 189.8 ± 25.3 minutes for the control group (P = .0001). CONCLUSION Only a few studies have investigated efficiency parameters of digital workflows compared with conventional pathways in implant dental medicine. This investigation shows that the digital workflow seems to be more time-efficient than the established conventional production pathway for fixed implant-supported crowns. Both clinical chair time and laboratory manufacturing steps could be effectively shortened with the digital process of intraoral scanning plus CAD/CAM technology.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

OBJECTIVES The aim of this prospective cohort trial was to perform a cost/time analysis for implant-supported single-unit reconstructions in the digital workflow compared to the conventional pathway. MATERIALS AND METHODS A total of 20 patients were included for rehabilitation with 2 × 20 implant crowns in a crossover study design and treated consecutively each with customized titanium abutments plus CAD/CAM-zirconia-suprastructures (test: digital) and with standardized titanium abutments plus PFM-crowns (control conventional). Starting with prosthetic treatment, analysis was estimated for clinical and laboratory work steps including measure of costs in Swiss Francs (CHF), productivity rates and cost minimization for first-line therapy. Statistical calculations were performed with Wilcoxon signed-rank test. RESULTS Both protocols worked successfully for all test and control reconstructions. Direct treatment costs were significantly lower for the digital workflow 1815.35 CHF compared to the conventional pathway 2119.65 CHF [P = 0.0004]. For subprocess evaluation, total laboratory costs were calculated as 941.95 CHF for the test group and 1245.65 CHF for the control group, respectively [P = 0.003]. The clinical dental productivity rate amounted to 29.64 CHF/min (digital) and 24.37 CHF/min (conventional) [P = 0.002]. Overall, cost minimization analysis exhibited an 18% cost reduction within the digital process. CONCLUSION The digital workflow was more efficient than the established conventional pathway for implant-supported crowns in this investigation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A three-level satellite to ground monitoring scheme for conservation easement monitoring has been implemented in which high-resolution imagery serves as an intermediate step for inspecting high priority sites. A digital vertical aerial camera system was developed to fulfill the need for an economical source of imagery for this intermediate step. A method for attaching the camera system to small aircraft was designed, and the camera system was calibrated and tested. To ensure that the images obtained were of suitable quality for use in Level 2 inspections, rectified imagery was required to provide positional accuracy of 5 meters or less to be comparable to current commercially available high-resolution satellite imagery. Focal length calibration was performed to discover the infinity focal length at two lens settings (24mm and 35mm) with a precision of O.1mm. Known focal length is required for creation of navigation points representing locations to be photographed (waypoints). Photographing an object of known size at distances on a test range allowed estimates of focal lengths of 25.lmm and 35.4mm for the 24mm and 35mm lens settings, respectively. Constants required for distortion removal procedures were obtained using analytical plumb-line calibration procedures for both lens settings, with mild distortion at the 24mm setting and virtually no distortion found at the 35mm setting. The system was designed to operate in a series of stages: mission planning, mission execution, and post-mission processing. During mission planning, waypoints were created using custom tools in geographic information system (GIs) software. During mission execution, the camera is connected to a laptop computer with a global positioning system (GPS) receiver attached. Customized mobile GIs software accepts position information from the GPS receiver, provides information for navigation, and automatically triggers the camera upon reaching the desired location. Post-mission processing (rectification) of imagery for removal of lens distortion effects, correction of imagery for horizontal displacement due to terrain variations (relief displacement), and relating the images to ground coordinates were performed with no more than a second-order polynomial warping function. Accuracy testing was performed to verify the positional accuracy capabilities of the system in an ideal-case scenario as well as a real-world case. Using many welldistributed and highly accurate control points on flat terrain, the rectified images yielded median positional accuracy of 0.3 meters. Imagery captured over commercial forestland with varying terrain in eastern Maine, rectified to digital orthophoto quadrangles, yielded median positional accuracies of 2.3 meters with accuracies of 3.1 meters or better in 75 percent of measurements made. These accuracies were well within performance requirements. The images from the digital camera system are of high quality, displaying significant detail at common flying heights. At common flying heights the ground resolution of the camera system ranges between 0.07 meters and 0.67 meters per pixel, satisfying the requirement that imagery be of comparable resolution to current highresolution satellite imagery. Due to the high resolution of the imagery, the positional accuracy attainable, and the convenience with which it is operated, the digital aerial camera system developed is a potentially cost-effective solution for use in the intermediate step of a satellite to ground conservation easement monitoring scheme.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of this study was to evaluate the effectiveness of Bt corn and soil insecticides, either alone or in combination, for the control of corn rootworm. Evaluation of Bt hybrids included SmartStax, SmartStax with refuge in a bag, and Herculex XTRA. Soil insecticides evaluated were SmartChoice-SB, Counter-SB, Aztec, and Force.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of this study was to evaluate the effectiveness of Bt corn and soil insecticides, either alone or in combination, for the control of corn rootworm. Evaluation of Bt hybrids included SmartStax, SmartStax with a blended refuge (refuge in the bag), and Herculex XTRA. Soil insecticides evaluated were SmartChoice-SB, Counter-SB, Aztec, and Force.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Fil: Salvo, Graciela Silvia. Universidad Nacional de Cuyo. Facultad de Ciencias Económicas

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper, a new digital elevation model (DEM) is derived for the ice sheet in western Dronning Maud Land, Antarctica. It is based on differential interferometric synthetic aperture radar (SAR) from the European Remote Sensing 1/2 (ERS-1/2) satellites, in combination with ICESat's Geoscience Laser Altimeter System (GLAS). A DEM mosaic is compiled out of 116 scenes from the ERS-1 ice phase in 1994 and the ERS-1/2 tandem mission between 1996 and 1997 with the GLAS data acquired in 2003 that served as ground control. Using three different SAR processors, uncertainties in phase stability and baseline model, resulting in height errors of up to 20 m, are exemplified. Atmospheric influences at the same order of magnitude are demonstrated, and corresponding scenes are excluded. For validation of the DEM mosaic, covering an area of about 130,000 km**2 on a 50-m grid, independent ICESat heights (2004-2007), ground-based kinematic GPS (2005), and airborne laser scanner data (ALS, 2007) are used. Excluding small areas with low phase coherence, the DEM differs in mean and standard deviation by 0.5 +/- 10.1, 1.1 +/- 6.4, and 3.1 +/- 4.0 m from ICESat, GPS, and ALS, respectively. The excluded data points may deviate by more than 50 m. In order to suppress the spatially variable noise below a 5-m threshold, 18% of the DEM area is selectively averaged to a final product at varying horizontal spatial resolution. Apart from mountainous areas, the new DEM outperforms other currently available DEMs and may serve as a benchmark for future elevation models such as from the TanDEM-X mission to spatially monitor ice sheet elevation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Mining in the Iberian Pyrite Belt (IPB), the biggest VMS metallogenetic province known in the world to date, has to face a deep crisis in spite of the huge reserves still known after ≈5 000 years of production. This is due to several factors, as the difficult processing of complex Cu-Pb-Zn-Ag- Au ores, the exhaustion of the oxidation zone orebodies (the richest for gold, in gossan), the scarce demand for sulphuric acid in the world market, and harder environmental regulations. Of these factors, only the first and the last mentioned can be addressed by local ore geologists. A reactivation of mining can therefore only be achieved by an improved and more efficient ore processing, under the constraint of strict environmental controls. Digital image analysis of the ores, coupled to reflected light microscopy, provides a quantified and reliable mineralogical and textural characterization of the ores. The automation of the procedure for the first time furnishes the process engineers with real-time information, to improve the process and to preclude or control pollution; it can be applied to metallurgical tailings as well. This is shown by some examples of the IPB.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

GEODA project started in 2006 as a complex and ambitious project in the smart antenna field. GEODA is a multiple planar array smart antenna working at 1.7 GHz designed to receive and automatically track several LEO satellite signals simultaneously [1-4]. GEODA evolved to GEODA-GRUA since transmission capabilities were given to the original idea [5-6], so that radiofrequency sub-systems had to be re-designed and digital management subsystem modified accordingly. In this paper, improvements in the reception/transmission (T/R) modules as well as in the Control Subsystem are presented, keeping the original radiating element.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents a general systems that can be taken into account to control between elements in an antenna array. Because the digital phase shifter devices have become a strategic element and also some steps have been taken for their export by U.S. Government, this element has increased its price to the low supply in the market. Therefore, it is necessary to adopt some solutions that allow us to deal with the design and construction of antenna arrays. system based on a group of a staggered phase shift with external switching is shown, which is extrapolated array.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Rms voltage regulation may be an attractive possibility for controlling power inverters. Combined with a Hall Effect sensor for current control, it keeps its parallel operation capability while increasing its noise immunity, which may lead to a reduction of the Total Harmonic Distortion (THD). Besides, as voltage regulation is designed in DC, a simple PI regulator can provide accurate voltage tracking. Nevertheless, this approach does not lack drawbacks. Its narrow voltage bandwidth makes transients last longer and it increases the voltage THD when feeding non-linear loads, such as rectifying stages. On the other hand, the implementation can fall into offset voltage error. Furthermore, the information of the output voltage phase is hidden for the control as well, making the synchronization of a 3-phase setup not trivial. This paper explains the concept, design and implementation of the whole control scheme, in an on board inverter able to run in parallel and within a 3-phase setup. Special attention is paid to solve the problems foreseen at implementation level: a third analog loop accounts for the offset level is added and a digital algorithm guarantees 3-phase voltage synchronization.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

En este trabajo se ha evaluado la hoja correspondiente a la 1074 del Mapa Topográfico Nacional (Tahivilla) o 13-47 de la “serie L” (1:50.000) según la denominación del Centro Geográfico del Ejército de Tierra en tres formatos distintos; formato en impreso en papel, formato raster, y formato vectorial. Con este Proyecto Fin de Carrera se pretende desarrollar una metodología adecuada para el control de calidad en la exactitud posicional de la serie L del Centro Geográfico del Ejército de Tierra (C.E.G.E.T.), así como aplicar, ampliar y afianzar los conocimientos adquiridos a lo largo de los cursos de la titulación de Ingeniero Técnico en Topografía. Se debe mencionar la necesidad de realizar este tipo de controles a la cartografía editada en los distintos formatos, ya que se pueden obtener enseñanzas que afecten al flujo de producción, además de cumplir los estándares marcados por la alianza para los centros productores de cartografía de los países miembros de la OTAN. Según el estudio expuesto en este proyecto, se puede afirmar que el control de calidad de la exactitud posicional según lo recogido en el STANAG 2215, “Evaluation of land maps, aeronautical charts and digital topographic data”, la clasificación OTAN para dicha serie, es AA-M10. La hoja de “Tahivilla” se eligió por se una de las últimas editadas por el CEGET, y por responder a unas características generales representaticas de la serie L. El Proyecto Fin de Carrera, está dirigido a todos los expertos en la materia, personal docente y alumnos de Ingeniería Técnica en Topografía y alumnos de Grado en Ingeniería Geomática y Topografía. Este proyecto se realiza como parte del control de calidad que el CEGET realiza a la serie L. En concreto de la última edición publicada en el año 2010. Además, la Escuela Técnica Superior de Ingenieros en Topografía Geodesia y Cartografía mediante el convenio firmado con el CEGET, se compromete a colaborar activamente con dicho Centro en las necesidades que cada Proyecto Fin de Carrera surja de este convenio.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

El trabajo presentado ofrece un ejemplo de aplicación de las nuevas tecnologías en el campo de la fotogrametría digital convergente aplicadas al levantamiento arquitectónico, práctica íntimamente conectada al análisis constructivo de edificios. La posibilidad de trabajar con herramientas informáticas de alto potencial pero de fácil utilización que no necesitan instrumentos de alta precisión ni el trabajo conjunto de varios operadores, permite realizar levantamientos indirectos de objetos complejos con cierta sencillez. En este caso se ha elegido como modelo de estudio el intradós de la cúpula del Pantheon en Roma. La especial configuración geométrica del interior de la cúpula permite un fácil reconocimiento de puntos de una imagen a la otra y por ello un control adecuado de los proyectos de restitución mediante fotogrametría. La presencia de los casetones que tiene a nivel perceptivo una fundamental importancia para poder reconstruir mentalmente la forma esférica de la superficie y su enorme tamaño sirve al mismo tiempo como característica de gran eficiencia en este trabajo de restitución. Los datos obtenidos mediante fotogrametría se han utilizado para elaborar una documentación gráfica del intradós de la cúpula y su forma empleando herramientas informáticas de dibujo vectorial que han permitido el estudio y cálculo promediado de los resultados.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

El origen del proyecto se encuentra en la mejora de un inversor trifásico sinusoidal comercial sobre la base del estudio de las técnicas de excitación óptimas para los IGBTs que lo componen en su etapa de potencia. En las primeras fases de planteamiento del proyecto se propone una idea mucho más ambiciosa, la realización de un nuevo convertidor de emergencia, destinado al sector ferroviario, para dar servicio de climatización. Este convertidor está formado por la asociación en cascada de un bloque DC/DC elevador y un bloque inversor DC/AC trifásico controlado mediante PWM con modulación sinusoidal. Se pretendía así dar solución a las siguientes problemáticas detectadas en los convertidores comercializados hasta el momento: un bloque elevador excesivamente sobredimensionado, subsistemas de control independientes para los dos bloques que configuran el convertidor, adicionalmente, la tarjeta driver se rediseña con cada cambio de especificaciones por parte de un nuevo cliente y finalmente, las comunicaciones tanto de diagnosis como de mantenimiento necesitaban una importante actualización. Inicialmente, se ha realizado un estudio teórico de los bloques elevador e inversor para poder realizar el diseño y dimensionamiento de sus componentes tanto semiconductores como electromagnéticos. Una vez completada la parte de potencia, se estudia el control que se realiza mediante medidas directas y simulación tanto de la estrategia de control del elevador como del inversor. Así se obtiene una información completa de la funcionalidad de las tarjetas existentes. Se desea realizar el diseño de una única tarjeta controladora y una única tarjeta de drivers para ambos bloques. Por problemas ajenos, en el transcurso de este proyecto se cancela su realización comercial, con lo que se decide al menos crear la placa de control y poder gobernar un convertidor ya existente, sustituyendo la tarjeta de control del bloque elevador. Para poder fabricar la placa de control se divide en dos tarjetas que irán conectadas en modo sándwich. En una tarjeta está el microcontrolador y en otra está todo el interface necesario para operar con el sistema: entradas y salidas digitales, entradas y salidas analógicas, comunicación CAN, y un pequeño DC/DC comercial que proporciona alimentación al prototipo. Se realiza un pequeño programa funcional para poder manejar el convertidor, el cual con una tensión de 110V DC, proporciona a la salida una tensión de 380V AC. Como ya se ha expuesto, debido a la cancelación del proyecto industrial no se profundiza más en su mejora y se decide proponerlo para su evaluación en su fase actual. ABSTRACT. The beginning of the project is found in the improvement of a commercial sine wave three phase inverter which is based in a study about optimal excitation techniques to IGBTs which compose in the power stage. In the early phases of project it is proposed a much more ambitious idea, the fact of a new emergency converter, proposed for the rail sector to work in an air condition unit. This converter is formed by an association of a block cascaded DC/DC booster and a block DC/AC inverter three-phase controlled by a sine wave modulation PWM. The purposed was to give a solution to following problems detected in commercial converters nowadays: an excessively oversized block boost, independent control subsystems for two blocks that configure the converter. In addition, driver board is redesigned with each specifications change demand it a new customer, and finally, the communications, diagnostic and maintenance that needed a important upgrade. Initially, it has been performed a theoretical study of boost and the inverter blocks to be able to perform the component’s design and the size (semiconductor and electromagnetic fields). Once finished power study, it is analysed the control performed using direct measures and simulation of boost control strategy and inverter. With this it is obtained complete information about existing cards functionality. The project is looking for the design of just one controller card and one drivers´ card for both blocks. By unrelated problems, during the course of this project a commercial realization. So at least its decided to create control board to be able to existing converter, replacing boost block’s control board. To be able to manufacture control board it is divided in two cards connected in sandwiching mode. In a card is microcontroller and in another is all needed interface to operate with the system: digital inputs and outputs, analogical inputs and outputs, CAN communication, and a small DC / DC business that provide power supply to the prototype. It is performed a small functional program to handle the converter, which with an input voltage 110V DC provides an output voltage 380V AC. As already has been exposed, due to industrial project cancellation it is decided no to continue with all improvements and directly to evaluate it in the current phase.