783 resultados para Construction Industry Development


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry wants graduate employees skilled in relationship building and information technology and communications (ITC). Much of the relationship building at universities has evolved through technology. Government and the ITC industry fund lobby groups to influence both educational establishments and Government to incorporate more ITC in education _ and ultimately into the construction industry. This influencing ignores the technoskeptics’ concerns about student disengagement through excessive online distractions. Construction studies students (n=64) and lecturers (n=16) at a construction university were surveyed to discover the impact of the use and applications of ITC. Contrary to Government and industry technopositivism, construction students and lecturers preferred hard copy documents to online feedback for assignments and marking, more human interface and less technological substitution and to be on campus for lectures and face-to-face meetings rather than viewing on-screen. ITC also distracted users from tasks which, in the case of students, prevented the development of the concentration and deep thinking which a university education should deliver. The research findings are contrary to the promotions of Government, ITC industry and ITC departments and have implications for construction employers where a renewed focus on human communication should mean less stress, fewer delays and cost overruns.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

L’introduction du développement durable apporte de nouvelles préoccupations environnementales au niveau de la construction et de la rénovation résidentielles, une industrie qui représente un marché économique important au Canada. En plus d’engendrer plusieurs impacts sur l’environnement, la conception actuelle ne permet pas d’accommoder le changement initié par l’évolution des pratiques, les avancées technologiques, mais également par l’évolution des patrons de vie des occupants. Dans un premier temps, la revue de littérature dresse le portrait de l’industrie de la construction, rénovation et démolition (CRD) au Canada, ainsi que le profil de gestion des débris de CRD. Ensuite, une analyse documentaire traite de différents outils de conception développés pour améliorer la performance du secteur : 3RV-E, écoconception, écoconstruction et LEED®. De plus, la recension des écrits permet également de cerner les concepts d’adaptabilité et de flexibilité au niveau du bâtiment et dans les approches et mouvements émergents en architecture. Cette démarche nous amène à établir l’hypothèse que l’intégration des critères d’adaptabilité et de flexibilité au niveau du logement aurait pour effet d’améliorer l’adéquation entre les besoins évolutifs des occupants et les nouvelles considérations environnementales. Au niveau méthodologique, l’analyse du cycle de vie simplifiée par l’Eco-indicator99 encadre l’analyse environnementale de l’ossature de trois types de construction de cloison. De cette évaluation, on conclut que c’est la construction traditionnelle à ossature de bois qui produit le moins d’impacts. Dans l’ordre suivant la proposition de construction de cloison à ossature d’aluminium, plus adaptable et flexible, et finalement la construction à ossature d’acier qui est le système le plus dommageable. Par contre, en intégrant le facteur temporel, cette analyse démontre que l’intégration de l’adaptabilité et de la flexibilité procure plusieurs cycles de vie et de rénovation au produit et à ses composantes. Finalement, ces concepts offrent également le potentiel de diminuer les impacts générés par la construction et la rénovation, un constat qui mériterait d’être abordé dans une approche plus systémique.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There is a clear need for financial protection in the construction industry, both to guarantee satisfactory completion of construction projects and to guard against non-payment. However, the cost of financial protection is often felt to be disproportionately high, with unnecessary overlap between different measures. The Reading Construction Forum has commissioned and steered research which is published in this report in an effort to bring the problem out into the open and to clarify the various options open to the various parties and stakeholders in the construction process. "Financial Protection in the UK Building Industry" is the first definitive report on the subject, offering an accurate and simple guide that all levels within the construction industry can understand. This accessible new guide considers the problem of financial protection and clearly lays out the alternative solutions.It looks by turn at the client, the main contractor, and the sub-contractor, discussing which financial protection options are available to each of them, and considers the pros and cons of each option. The cost of each type of financial protection is weighed against the amount of protection provided and the risks involved. The book concludes with guidance for consultants, emphasising relevant points to consider when advising clients and contractors about which type of financial protection to choose. "Financial Protection in the UK Building Industry" was researched by a literature search, collection of statistical data, and financial data, as well as discussions with clients, contractors, sub-contractors and consultants. This investigation has shown that the direct costs of implementing financial protection measures are marginal, and that wider adoption of payment protection would create a more equitable situation between contracting parties.This guide will enable anyone in the construction industry to consider all the options, and determine what is the best solution for them. "Reading Construction Forum Financial Protection for the UK Building Industry" was complied by the University of Reading, funded by the Reading Construction Forum. The Forum has recently commissioned and steered a number of high-profile reports covering important aspects of the construction industry. Members of the Forum include major companies which are concerned with achieving high quality in the design, construction and use of commercial, retail and industrial buildings. All are committed to change and innovation in the British and European construction industries.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose - The purpose of this paper is to provide a quantitative multicriteria decision-making approach to knowledge management in construction entrepreneurship education by means of an analytic knowledge network process (KANP) Design/methodology/approach- The KANP approach in the study integrates a standard industrial classification with the analytic network process (ANP). For the construction entrepreneurship education, a decision-making model named KANP.CEEM is built to apply the KANP method in the evaluation of teaching cases to facilitate the case method, which is widely adopted in entrepreneurship education at business schools. Findings- The study finds that there are eight clusters and 178 nodes in the KANP.CEEM model, and experimental research on the evaluation of teaching cases discloses that the KANP method is effective in conducting knowledge management to the entrepreneurship education. Research limitations/implications- As an experimental research, this paper ignores the concordance between a selected standard classification and others, which perhaps limits the usefulness of KANP.CEEM model elsewhere. Practical implications- As the KANP.CEEM model is built based on the standard classification codes and the embedded ANP, it is thus expected that the model has a wide potential in evaluating knowledge-based teaching materials for any education purpose with a background from the construction industry, and can be used by both faculty and students. Originality/value- This paper fulfils a knowledge management need and offers a practical tool for an academic starting out on the development of knowledge-based teaching cases and other teaching materials or for a student going through the case studies and other learning materials.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The competitiveness of the construction industry is an important issue for many countries as the industry makes up a substantial part of their GDP – about 8% in the UK. A number of competitiveness studies have been undertaken at company, industry and national levels. However, there has been little focus on sustainable competitiveness and the many factors that are involved. This paper addresses that need by investigating what construction industry experts consider to be the most important factors of construction industry competitiveness. It does so by conducting a Delphi survey among industry experts in Finland, Sweden and the UK. A list of 158 factors was compiled from competitiveness reports by institutions such as World Economic Forum and International Institute of Management Development, as well as from explorative workshops in the countries involved in the study. For each of the countries, experts with different perspectives of the industry, including, consultants, contractors and clients, were asked to select their 30 most influential factors. They then ranked their chosen factors in order of importance for the competitiveness of their construction industry. The findings after the first round of the Delphi process underline the complexity of the term competitiveness and the wide range of factors that are considered important contributors to competitiveness. The results also indicate that what are considered to be the most important factors of competitiveness is likely to differ from one country to another.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Since its popularization in the 1980s, competitiveness has received close attention from practitioners and researchers across a wide range of industries. In the construction sector, many works on competitiveness have also been published. So far, however, there seems to be no comprehensive review to summarize and critique existing research on competitiveness in construction. This research, therefore, reviews the extant literature from four aspects: concept of competitiveness, competitiveness research at the construction industry level, competitiveness research at the firm level, and competitiveness research at the project level. The review presents the state-of-the-art development of competitiveness research in construction, identifies the research gaps, and proposes new directions for further studies. Further research is recommended to validate previous studies in construction practices, identify the mechanisms that encourage mutual enhancement of competitiveness at different levels, and how to achieve its sustainability by embracing new management and/or economics techniques.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The complexity of construction projects and the fragmentation of the construction industry undertaking those projects has effectively resulted in linear, uncoordinated and highly variable project processes in the UK construction sector. Research undertaken at the University of Salford resulted in the development of an improved project process, the Process Protocol, which considers the whole lifecycle of a construction project whilst integrating its participants under a common framework. The Process Protocol identifies the various phases of a construction project with particular emphasis on what is described in the manufacturing industry as the ‘fuzzy front end’. The participants in the process are described in terms of the activities that need to be undertaken in order to achieve a successful project and process execution. In addition, the decision-making mechanisms, from a client perspective, are illustrated and the foundations for a learning organization/industry are facilitated within a consistent Process Protocol.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Human resource management (HRM) plays a pivotal role in attracting and retaining talents. However, there is growing recognition in international HRM literature that the adoption of the widely accepted US/Harvard-inspired HRM model ignores the influences of cultural contexts on HRM practices in different countries. This notion has not been empirically investigated in the construction industry. Based on survey responses from 604 construction professionals from Australia and Hong Kong, this study examines whether: (i) national cultural differences influence individuals’ preference for types of remuneration and job autonomy, (ii) actual organizational HRM practices reflect such preferences and (iii) gaps between individuals’ preferences and actual organizational HRM practices affect job satisfaction. Results showed significant difference in HRM preferences between Australian and Hong Kong respondents and these are reflected in the distinct types of HRM practices adopted by construction firms in the two countries. Findings further indicated that the gap between individuals’ preferences and actual organizational HRM practices is associated with job satisfaction. The results support existing mainstream research and highlight the deficiency of the acultural treatment of HRM that is still apparent in construction management literature. An uncritical literature in the area not only hinders theory development but also potentially undermines the ability of construction firms to attract, recruit, and retain scarce talents.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry, one of the most important ones in the development of a country, generates unavoidable impacts on the environment. The social demand towards greater respect for the environment is a high and general outcry. Therefore, the construction industry needs to reduce the impact it produces. Proper waste management is not enough; we must take a further step in environmental management, where new measures need to be introduced for the prevention at source, such as good practices to promote recycling. Following the amendment of the legal frame applicable to Construction and Demolition Waste (C&D waste), important developments have been incorporated in European and International laws, aiming to promote the culture of reusing and recycling. This change of mindset, that is progressively taking place in society, is allowing for the consideration of C&D waste no longer as an unusable waste, but as a reusable material. The main objective of the work presented in this paper is to enhance C&D waste management systems through the development of preventive measures during the construction process. These measures concern all the agents intervening in the construction process as only the personal implication of all of them can ensure an efficient management of the C&D waste generated. Finally, a model based on preventive measures achieves organizational cohesion between the different stages of the construction process, as well as promoting the conservation of raw materials through the use and waste minimization. All of these in order to achieve a C&D waste management system, whose primary goal is zero waste generation

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Today, the requirement of professional skills to university students is constantly increasing in our society. In our opinion, the content offered in official degrees need to be nourished with different variables, enriching their global professional knowledge in a parallel way; that is why, in recent years, there is a great multiplicity of complementary courses at university. One of the most socially demanded technical requirements within the architectural, design or engineering field is the management of 3D drawing software, becoming an indispensable reality in these sectors. Thus, this specific training becomes essential over two-dimension traditional design, because the inclusion of great possibilities of spatial development that go beyond conventional orthographic projections (plans, sections or elevations), allowing modelling and rotation of the selected items from multiple angles and perspectives. Therefore, this paper analyzes the teaching methodology of a complementary course for those technicians in the construction industry interested in computer-aided design, using modelling (SketchupMake) and rendering programs (Kerkythea). The course is developed from the technician point of view, by learning computer management and its application to professional development from a more general to a more specific view through practical examples. The proposed methodology is based on the development of real examples in different professional environments such as rehabilitation, new constructions, opening projects or architectural design. This multidisciplinary contribution improves criticism of students in different areas, encouraging new learning strategies and the independent development of three-dimensional solutions. Thus, the practical implementation of new situations, even suggested by the students themselves, ensures active participation, saving time during the design process and the increase of effectiveness when generating elements which may be represented, moved or virtually tested. In conclusion, this teaching-learning methodology improves the skills and competencies of students to face the growing professional demands of society. After finishing the course, technicians not only improved their expertise in the field of drawing but they also enhanced their capacity for spatial vision; both essential qualities in these sectors that can be applied to their professional development with great success.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

On a global level the population growth and increase of the middle class lead to a growing demand on material resources. The built environment has an enormous impact on this scarcity. In addition, a surplus of construction and demolition waste is a common problem. The construction industry claims to recycle 95% of this waste but this is in fact mainly downcycling. Towards the circular economy, the quality of reuse becomes of increasing importance. Buildings are material warehouses that can contribute to this high quality reuse. However, several aspects to achieve this are unknown and a need for more insight into the potential for high quality reuse of building materials exists. Therefore an instrument has been developed that determines the circularity of construction waste in order to maximise high quality reuse. The instrument is based on three principles: ‘product and material flows in the end of life phase’, ‘future value of secondary materials and products’ and ‘the success of repetition in a new life cycle’. These principles are further divided into a number of criteria to which values and weighting factors are assigned. A degree of circularity can then be determined as a percentage. A case study for a typical 70s building is carried out. For concrete, the circularity is increased from 25% to 50% by mapping out the potential for high quality reuse. During the development of the instrument it was clarified that some criteria are difficult to measure. Accurate and reliable data are limited and assumptions had to be made. To increase the reliability of the instrument, experts have reviewed the instrument several times. In the long-term, the instrument can be used as a tool for quantitative research to reduce the amount of construction and demolition waste and contribute to the reduction of raw material scarcity.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Concern for the environment has lately heightened awareness about the need for recycling in the construction industry. However, some standards, such as the Spanish standard, only accept the recycling of aggregates derived from concrete, which limits the extensive use of construction and demolition waste, which are produced in much bigger volumes. The aim of this work was to explore the possibility of using recycled mixed aggregates (RMA) in the preparation of precast non-structural concretes. To that end different percentages of natural aggregate were replaced by RMA in non-structural elements (25, 50, 75 and 100%). Contents of cement, water, and the dosages commonly used by companies were unchanged by the introduction of RMA. The characterization of the prepared elements has been done using the specific tests for each type of non-structural element (terrazzo for indoor use, hollow tiles, kerbstones and paving blocks): compression and flexural strength, water absorption, dimensional tolerances, abrasion and slipping resistance. The paving blocks, kerbstones, and hollow tiles prepared were tested for 360 days. The stability of the tested properties confirmed the possibility of using these wastes on an industrial scale satisfying the standard requirements. However, the surface of terrazzo with RMA is not as good as that prepared with natural aggregate.