934 resultados para Congestion Charging
Resumo:
By an analysis of the exchange of carriers through a semiconductor junction, a general relationship for the nonequilibrium population of the interface states in Schottky barrier diodes has been derived. Based on this relationship, an analytical expression for the ideality factor valid in the whole range of applied bias has been given. This quantity exhibits two different behaviours depending on the value of the applied bias with respect to a critical voltage. This voltage, which depends on the properties of the interfacial layer, constitutes a new parameter to complete the characterization of these junctions. A simple interpretation of the different behaviours of the ideality factor has been given in terms of the nonequilibrium charging properties of interface states, which in turn explains why apparently different approaches have given rise to similar results. Finally, the relevance of our results has been considered on the determination of the density of interface states from nonideal current-voltage characteristics and in the evaluation of the effects of the interfacial layer thickness in metal-insulator-semiconductor tunnelling diodes.
Resumo:
As an expansion of SF2088, the Department of Administrative Services-Information Technology Enterprise (DAS-ITE) was asked to further analyze the potential costs and savings if the current practice of charging credit card and overhead fees (“value-added fees”) were to be eliminated. Value-added fees reflect the costs an agency incurs while providing online services, and those costs will always exist.. DAS-ITE researched these costs and identified ways of making the associated fees less burdensome to the citizens of Iowa. The three alternatives provide different ways in which agencies can recover those costs; they could be borne by either an annual appropriation or adjustment of the online service “price” to include the fees within the cost of the online transaction. An additional alternative is presented to leave the current value-added fee practices in place. Recognition must also be made of the fact that traditional forms of conducting business with the State of Iowa, face-to-face and paper-based transactions, are inherently more costly. These delivery channels are effectively subsidized by the agency as a “cost of doing business” and the associated expense of the transactions is not passed on to the customer.
Resumo:
This paper analyzes the relationship between spatial density of economic activity and interregional differences in the productivity of industrial labour in Spain during the period 1860-1999. In the spirit of Ciccone and Hall (1996) and Ciccone (2002), we analyze the evolution of this relationship over the long term in Spain. Using data on the period 1860-1999 we show the existence of an agglomeration effect linking the density of economic activity with labour productivity in the industry. This effect was present since the beginning of the industrialization process in the middle of the 19th century but has been decreasing over time. The estimated elasticity of labour productivity with respect to employment density was close to 8% in the subperiod 1860-1900, reduces to a value of around 7% in the subperiod 1914-1930, to 4% in the subperiod 1965-1979 and becomes insignificant in the final subperiod 1985-1999. At the end of the period analyzed there is no evidence of the existence of net agglomeration effects in the industry. This result could be explained by an important increase in the congestion effects in large industrial metropolitan areas that would have compensated the centripetal or agglomeration forces at work. Furthermore, this result is also consistent with the evidence of a dispersion of industrial activity in Spain during the last decades.
Resumo:
The development of new rail systems in the first part of the 21st century is the result of a wide range of trends that are making it increasingly difficult to maintain regional mobility using the two dominant intercity travel modes, auto and air. These trends include the changing character of the economic structure of industry. The character of the North American industrial structure is moving rapidly from a manufacturing base to a service based economy. This is increasing the need for business travel while the increase in disposable income due to higher salaries has promoted increased social and tourist travel. Another trend is the change in the regulatory environment. The trend towards deregulation has dramatically reduced the willingness of the airlines to operate from smaller airports and the level of service has fallen due to the creation of hub and spoke systems. While new air technology such as regional jets may mitigate this trend to some degree in medium-size airports, smaller airports will continue to lose out. Finally, increasing environmental concerns have reduced the ability of the automobile to meet intercity travel needs because of increased suburban congestion and limited highway capacity in big cities. Against this background the rail mode offers new options due to first, the existing rail rights-of-way offering direct access into major cities that, in most cases, have significant capacity available and, second, a revolution in vehicle technology that makes new rail rolling stock faster and less expensive to purchase and operate. This study is designed to evaluate the potential for rail service making an important contribution to maintaining regional mobility over the next 30 to 50 years in Iowa. The study evaluates the potential for rail service on three key routes across Iowa and assesses the impact of new train technology in reducing costs and improving rail service. The study also considers the potential for developing the system on an incremental basis. The service analysis and recommendations do not involve current Amtrak intercity service. That service is presumed to continue on its current route and schedule. The study builds from data and analyses that have been generated for the Midwest Rail Initiative (MWRI) Study. For example, the zone system and operating and capital unit cost assumptions are derived from the MWRI study. The MWRI represents a cooperative effort between nine Midwest states, Amtrak and the Federal Railroad Administration (FRA) contracting with Transportation Economics & Management Systems, Inc. to evaluate the potential for a regional rail system. The 1 The map represents the system including the decision on the Iowa route derived from the current study. Iowa Rail Route Alternatives Analysis TEMS 1-2 system is to offer modern, frequent, higher speed train service to the region, with Chicago as the connecting hub. Exhibit 1-1 illustrates the size of the system, and how the Iowa route fits in to the whole.
Resumo:
This paper analyzes the relationship between spatial density of economic activity and interregional differences in the productivity of industrial labour in Spain during the period 1860-1999. In the spirit of Ciccone and Hall (1996) and Ciccone (2002), we analyze the evolution of this relationship over the long term in Spain. Using data on the period 1860-1999 we show the existence of an agglomeration effect linking the density of economic activity with labour productivity in the industry. This effect was present since the beginning of the industrialization process in the middle of the 19th century but has been decreasing over time. The estimated elasticity of labour productivity with respect to employment density was close to 8% in the subperiod 1860-1900, reduces to a value of around 7% in the subperiod 1914-1930, to 4% in the subperiod 1965-1979 and becomes insignificant in the final subperiod 1985-1999. At the end of the period analyzed there is no evidence of the existence of net agglomeration effects in the industry. This result could be explained by an important increase in the congestion effects in large industrial metropolitan areas that would have compensated the centripetal or agglomeration forces at work. Furthermore, this result is also consistent with the evidence of a dispersion of industrial activity in Spain during the last decades.
Resumo:
OBJECTIVES In extreme scenarios, such as hyperacute rejection of heart transplant, an urgent heart explantation might be necessary. The aim of this experimental study was to determine the feasibility and to improve the haemodynamics of a venoarterial cardiopulmonary bypass after cardiectomy. METHODS A venoarterial cardiopulmonary bypass was established in seven calves (56.4 ± 7 kg) by the transjugular insertion to the caval axis of a self-expanding cannula, with a carotid artery return. After baseline measurements (A), ventricular fibrillation was induced (B), great arteries were clamped (C), the heart was excised and the right and left atria remnants, containing the pulmonary veins, were sutured together leaving an atrial septal defect over the cannula in the caval axis (D). Measurements were taken with the pulmonary artery clamped and declamped. RESULTS Initial pump flow was 4.16 ± 0.75 l/min dropping to 2.9 ± 0.63 l/min (P(AB )< 0.001) 10 min after induction of ventricular fibrillation. After cardiectomy with the pulmonary artery clamped, the pump flow increased non-significantly to 3.20 ± 0.78 l/min. After declamping, the flow significantly increased close to baseline levels (3.61 ± 0.73 l/min, P(DB )= 0.009, P(DC )= 0.017), supporting the notion that full cardiopulmonary bypass in acardia is feasible only if adequate drainage of pulmonary circulation is assured to avoid pulmonary congestion and loss of volume from the left-to-right shunt of bronchial vessels.
Resumo:
Ramp metering has been successfully implemented in many states to improve traffic operations on freeways. Studies have documented the positive mobility and safety benefits of ramp metering. However, there have been no studies on the use of ramp metering for work zones. This report documents the results from the first deployment of temporary ramp meters in work zones in the United States. Temporary ramp meters were deployed at seven urban short-term work zones in Missouri. Safety measures such as driver compliance, merging behavior, and speed differentials were extracted from video-based field data. Mobility analysis was conducted using a calibrated simulation model and the total delays were obtained for under capacity, at capacity, and over capacity conditions. This evaluation suggests that temporary ramp meters should only be deployed at work zone locations where there is potential for congestion and turned on only during above-capacity conditions. The compliance analysis showed that non-compliance could be a major safety issue in the deployment of temporary ramp meters for under-capacity conditions. The use of a three-section instead of a traditional two-section signal head used for permanent ramp metering produced significantly higher compliance rates. Ramp metering decreased ramp platoons by increasing the percentage of single-vehicle merges to over 70% from under 50%. The accepted-merge-headway results were not statistically significant even though a slight shift towards longer headways was found with the use of ramp meters. Mobility analysis revealed that ramp metering produced delay savings for both mainline and ramp vehicles for work zones operating above capacity. On average a 24% decrease in total delay (mainline plus ramp) at low truck percentage and a 19% decrease in delay at high truck percentage conditions resulted from ramp metering.
Resumo:
The focus of this report is a capacity analysis of two long-term urban freeway Work Zones. Work Zone #1 tapered four mainline lanes to two, using two separate tapers; Work Zone #2 tapered two mainline lanes to one. Work Zone throughput was analyzed throughout the day over multiple days and traffic operations conditions were analyzed up to a distance of five miles upstream of the Work Zone entrance. Historical data from pavement-embedded detectors were used to analyze traffic conditions. The database consisted of five-minute volume, speed and occupancy data collected from 78 detectors for a total of 50 days. Congestion during each analyzed Work Zone existed for more than fourteen hours each day; Work Zone impacts adversely affected freeway operations over distances of 3.7 to 4.2 miles. Speed and occupancy conditions further upstream were, however, not affected, or even improved due to significant trip diversion. Work Zone capacity was defined based on the maximum traffic flows observed over a one-hour period; throughput values were also compiled over longer periods of time when traffic was within 90% of the maximum observed one-hour flows, as well as over the multi-hour mid-day period. The Highway Capacity Manual freeway capacity definition based on the maximum observed 15-min period was not used, since it would have no practical application in estimating Work Zone throughput when congested conditions prevail for the majority of the hours of the day. Certain noteworthy changes took place for the duration of the analyzed Work Zones: per-lane throughput dropped; morning peak periods started earlier, evening peak periods ended later and lasted longer; mid-day volumes dropped accompanied by the highest occupancies of the day. Trip diversion was evident in lower volumes entering the analyzed freeway corridor, higher volumes using off-ramps and lower volumes using onramps upstream of the Work Zones. The majority of diverted traffic comprised smaller vehicles (vehicles up to 21 feet in length); combination truck volumes increased and their use of the median lane increased, contrary to smaller vehicles that shifted toward a heavier use of the shoulder lane.
Resumo:
This report presents the results of work zone field data analyzed on interstate highways in Missouri to determine the mean breakdown and queue-discharge flow rates as measures of capacity. Several days of traffic data collected at a work zone near Pacific, Missouri with a speed limit of 50 mph were analyzed in both the eastbound and westbound directions. As a result, a total of eleven breakdown events were identified using average speed profiles. The traffic flows prior to and after the onset of congestion were studied. Breakdown flow rates ranged between 1194 to 1404 vphpl, with an average of 1295 vphpl, and a mean queue discharge rate of 1072 vphpl was determined. Mean queue discharge, as used by the Highway Capacity Manual 2000 (HCM), in terms of pcphpl was found to be 1199, well below the HCM’s average capacity of 1600 pcphpl. This reduced capacity found at the site is attributable mainly to narrower lane width and higher percentage of heavy vehicles, around 25%, in the traffic stream. The difference found between mean breakdown flow (1295 vphpl) and queue-discharge flow (1072 vphpl) has been observed widely, and is due to reduced traffic flow once traffic breaks down and queues start to form. The Missouri DOT currently uses a spreadsheet for work zone planning applications that assumes the same values of breakdown and mean queue discharge flow rates. This study proposes that breakdown flow rates should be used to forecast the onset of congestion, whereas mean queue discharge flow rates should be used to estimate delays under congested conditions. Hence, it is recommended that the spreadsheet be refined accordingly.
Resumo:
This project develops a smartphone-based prototype system that supplements the 511 system to improve its dynamic traffic routing service to state highway users under non-recurrent congestion. This system will save considerable time to provide crucial traffic information and en-route assistance to travelers for them to avoid being trapped in traffic congestion due to accidents, work zones, hazards, or special events. It also creates a feedback loop between travelers and responsible agencies that enable the state to effectively collect, fuse, and analyze crowd-sourced data for next-gen transportation planning and management. This project can result in substantial economic savings (e.g. less traffic congestion, reduced fuel wastage and emissions) and safety benefits for the freight industry and society due to better dissemination of real-time traffic information by highway users. Such benefits will increase significantly in future with the expected increase in freight traffic on the network. The proposed system also has the flexibility to be integrated with various transportation management modules to assist state agencies to improve transportation services and daily operations.
Resumo:
Although extensive research has been conducted on urban freeway capacity estimation methods, minimal research has been carried out for rural highway sections, especially sections within work zones. This study attempted to fill that void for rural highways in Kansas, by estimating capacity of rural highway work zones in Kansas. Six work zone locations were selected for data collection and further analysis. An average of six days’ worth of field data was collected, from mid-October 2013 to late November 2013, at each of these work zone sites. Two capacity estimation methods were utilized, including the Maximum Observed 15-minute Flow Rate Method and the Platooning Method divided into 15-minute intervals. The Maximum Observed 15-minute Flow Rate Method provided an average capacity of 1469 passenger cars per hour per lane (pcphpl) with a standard deviation of 141 pcphpl, while the Platooning Method provided a maximum average capacity of 1195 pcphpl and a standard deviation of 28 pcphpl. Based on observed data and analysis carried out in this study, the suggested maximum capacity can be considered as 1500 pcphpl when designing work zones for rural highways in Kansas. This proposed standard value of rural highway work zone capacity could be utilized by engineers and planners so that they can effectively mitigate congestion at or near work zones that would have otherwise occurred due to construction/maintenance.
Resumo:
In this report, the authors present a case of unusual, accidental methadone intoxication in a 40-year-old man, who had inhaled methadone powder. The drug dealer was a pharmacy technician; methadone had been stolen from a pharmacy and sold as cocaine. After having inhaled methadone powder, he suffered cardiopulmonary arrest. He was admitted to hospital where he died after 24 h of intensive care. The autopsy revealed congestion of internal organs and cerebral and pulmonary edema. Microscopically, the heart showed no changes. The toxicological analyses performed on blood and urine taken at the hospital revealed methadone, cannabinoids, and ethanol. The blood methadone concentration was 290 μg/L. The urine methadone concentration was 160 μg/L. Midazolam and lidocaine, which were administered to the patient at the hospital, were also detected in the blood. The cause of death was determined to be methadone intoxication. The literature has been reviewed and discussed. To date, and to our knowledge, only very few cases of accidental death resulting from methadone inhalation have been described up to the case presented herein.
Resumo:
Efforts to improve safety and traffic flow through merge areas on high volume/high speed roadways have included early merge and late merge concepts and several studies of the effectiveness of these concepts, many using Intelligent Transportation Systems for implementation. The Iowa Department of Transportation (Iowa DOT) planned to employ a system of dynamic message signs (DMS) to enhance standard temporary traffic control for lane closures and traffic merges at two bridge construction projects in western Iowa (Adair County and Cass County counties) on I-80 during the 2008 construction season. To evaluate the DMS system’s effectiveness for impacting driver merging actions, the Iowa DOT contracted with Iowa State University’s Center for Transportation Research and Education to perform the evaluation and make recommendations for future use of this system based on the results. Data were collected over four weekends, beginning August 1–4 and ending October 16–20, 2008. Two weekends yielded sufficient data for evaluation, one of transition traffic flow and the other with a period of congestion. For both of these periods, a statistical review of collected data did not indicate a significant impact on driver merging actions when the DMS messaging was activated as compared to free flow conditions with no messaging. Collection of relevant project data proved to be problematic for several reasons. In addition to personnel safety issues associated with the placement and retrieval of counting devices on a high speed roadway, unsatisfactory equipment performance and insufficient congestion to activate the DMS messaging hampered efforts. A review of the data that was collected revealed different results taken by the tube counters compared to the older model plate counters. Although variations were not significant from a practical standpoint, a statistical evaluation showed that the data, including volumes, speeds, and classifications from the two sources were not comparable at a 95% level of confidence. Comparison of data from the Iowa DOT’s automated traffic recorders (ATRs) in the area also suggested variations in results from these data collection systems. Additional comparison studies were recommended.
Resumo:
To address safety concerns on James Avenue NW and 250th Street NW, from the North Corporate Limits (NCL) of Tiffin, north and east to I-380 (at North Liberty), the Johnson County engineer requested a road safety audit (RSA). The audit was conducted on September 1, 2010, through a program supported by the Office of Traffic and Safety at the Iowa Department of Transportation (DOT). This road is a seal-coated roadway, about 25-ft wide, but with only about 0-1 ft of earth shoulders. According to 2006 Iowa DOT estimates, traffic volume is about 820 vehicles per day, north from Tiffin to a commercial entrance on 250th Street, then increasing to 2,990 vehicles per day to the on-ramp of Interstate 380 (I-380). Local traffic uses this road as a short-cut to Cedar Rapids, North Liberty, and the I-380/I-80 interchange (to avoid congestion on IA 965). This report outlines the findings and recommendations of the road safety audit team for addressing the safety concerns on this roadway.
Resumo:
The Iowa Department of Transportation, like many other state transportation agencies, is experiencing growing congestion and traffic delays in work zones on rural interstate highways. The congestion results in unproductive and wasteful delays for both motorists and commercial vehicles. It also results in hazardous conditions where vehicle stopped in queues on rural interstate highways are being approached by vehicles upstream at very high speeds. The delays also result in driver frustration, making some drivers willing to take unsafe risks in an effort to bypass delays. To reduce the safety hazards and unproductive delays of congested rural interstate work zones, the Iowa Department of Transportation would like to improve its traffic management strategies at these locations. Applying better management practices requires knowledge of the traffic flow properties and driver behavior in and around work zones, and knowledge of possible management strategies. The project reported here and in a companion report documents research which seeks to better understand traffic flow behavior at rural interstate highway work zones and to estimate the traffic carrying capacity of work zone lane closures. In addition, this document also reports on technology available to better manage traffic in and around work zones.