1000 resultados para Bed dip direction
Resumo:
We have studied the disassembly and assembly of two morphologically and functionally distinct parts of the Golgi complex, the cis/middle and trans cisterna/trans network compartments. For this purpose we have followed the redistribution of three cis/middle- (GMPc-1, GMPc-2, MG 160) and two trans- (GMPt-1 and GMPt-2) Golgi membrane proteins during and after treatment of normal rat kidney (NRK) cells with brefeldin A (BFA). BFA induced complete disassembly of the cis/middle- and trans-Golgi complex and translocation of GMPc and GMPt to the ER. Cells treated for short times (3 min) with BFA showed extensive disorganization of both cis/middle- and trans-Golgi complexes. However, complete disorganization of the trans part required much longer incubations with the drug. Upon removal of BFA the Golgi complex was reassembled by a process consisting of three steps: (a) exist of cis/middle proteins from the ER and their accumulation into vesicular structures scattered throughout the cytoplasm; (b) gradual relocation and accumulation of the trans proteins in the vesicles containing the cis/middle proteins; and (c) assembly of the cisternae, and reconstruction of the Golgi complex within an area located in the vicinity of the centrosome from which the ER was excluded. Reconstruction of the cis/middle-Golgi complex occurred under temperature conditions inhibitory of the reorganization of the trans-Golgi complex, and was dependent on microtubules. Reconstruction of the trans-Golgi complex, disrupted with nocodazole after selective fusion of the cis/middle-Golgi complex with the ER, occurred after the release of cis/middle-Golgi proteins from the ER and the assembly of the cis/middle cisternae.
Resumo:
This plan makes 25 recommendations that, when takes together, will take Iowa's infrastructure to the next level, ensure quality of life, and allow the economy to be globally competitive. It requires two fundamental changes in Iowans' prectices: cooperative planning and integration of infrastructure sectors.
Resumo:
The main objective of this study was to evaluate the hydraulic performance of riprap spurs and weirs in controlling bank erosion at the Southern part of the Raccoon River upstream U.S. Highway 169 Bridge utilizing the commercially available model FESWMS and field monitoring. It was found based on a 2 year monitoring and numerical modeling that the design of structures was overall successful, including their spacing and stability. The riprap material incorporated into the structures was directly and favorably correlated to the flow transmission through the structure, or in other words, dictated the permeable nature of the structure. It was found that the permeable dikes and weirs chosen in this study created less volume of scour in the vicinity of the structure toes and thus have less risk comparatively to other impermeable structures to collapse. The fact that the structures permitted the transmission of flow through them it allowed fine sand particles to fill in the gaps of the rock interstices and thus cement and better stabilize the structures. During bank-full flows the maximum scour hole was recorded away from the structures toe and the scourhole size was directly related to the protrusion angle of the structure to the flow. It was concluded that the proposed structure inclination with respect to the main flow direction was appropriate since it provides maximum bank protection while creating the largest volume of local scour away from the structure and towards the center of the channel. Furthermore, the lowest potential for bank erosion also occurs with the present set-up design chosen by the IDOT. About 2 ft of new material was deposited in the area located between the structures for the period extending from the construction day to May 2007. Surveys obtained by sonar and the presence of vegetation indicate that new material has been added at the bank toes. Finally, the structures provided higher variability in bed topography forming resting pools, creating flow shade on the leeward side of the structure, and separation of bed substrate due to different flow conditions. Another notable environmental benefit to rock riprap weirs and dikes is the creation of resting pools, especially in year 2007 (2nd year of the project). The magnitude of these benefits to aquatic habitat has been found in the literature that is directly related to the induced scour-hole volume.