910 resultados para Airport buildings.
Resumo:
The assessment of settlement induced damage on buildings during the preliminary phase of tunnel excavation projects, is nowadays receiving greater attention. Analyses at different levels of detail are performed on the surface building in proximity to the tunnel, to evaluate the risk of structural damage and the need of mitigation measures. In this paper, the possibility to define a correlation between the main parameters that influence the structural response to settlement and the potential damage is investigated through numerical analysis. The adopted 3D finite element model allows to take into account important features that are neglected in more simplified approaches, like the soil-structure interaction, the nonlinear behaviour of the building, the three dimensional effect of the tunnelling induced settlement trough and the influence of openings in the structure. Aim of this approach is the development of an improved classification system taking into account the intrinsic vulnerability of the structure, which could have a relevant effect on the final damage assessment. Parametric analyses are performed, focusing on the effect of the orientation and the position of the structure with respect to the tunnel. The obtained results in terms of damage are compared with the Building Risk Assessment (BRA) procedure. This method was developed by Geodata Engineering (GDE) on the basis of empirical observations and building monitoring and applied during the construction of different metro lines in urban environment. The comparison shows a substantial agreement between the two procedures on the influence of the analysed parameters. The finite element analyses suggest a refinement of the BRA procedure for pure sagging conditions.
Resumo:
Excavation works in urban areas require a preliminary risk damage assessment. In historical cities, the prediction of building response to settlements is necessary to reduce the risk of damage of the architectural heritage. The current method used to predict the building damage due to ground deformations is the Limiting Tensile Strain Method (LTSM). In this approach the building is modelled as an elastic beam subjected to imposed Greenfield settlements and the induced tensile strains are compared with a limit value for the material. These assumptions can lead to a non realistic evaluation of the damage. In this paper, the possibility to apply a settlement risk assessment derived from the seismic vulnerability approach is considered. The parameters that influence the structural response to settlements can be defined through numerical analyses which take into account the nonlinear behaviour of masonry and the soil-structure interaction. The effects of factors like material quality, geometry of the structure, amount of openings, type of foundation or the actual state of preservation can be included in a global vulnerability index, which should indicate the building susceptibility to damage by differential settlements of a given magnitude. Vulnerability curves will represent the expected damage of each vulnerability class of building as a function of the settlement.
Resumo:
An investigation of 24 buildings in the Greater Boston Area revealed that one-third (8 of 24) contained caulking materials with polychlorinated biphenyl (PCB) content exceeding 50 ppm by weight, which is the U.S. Environmental Protection Agency (U.S. EPA) specified limit above which this material is considered to be PCB bulk product waste. These buildings included schools and other public buildings. In a university building where similar levels of PCB were found in caulking material, PCB levels in indoor air ranged from 111 to 393 ng/m3; and in dust taken from the building ventilation system, < 1 ppm to 81 ppm. In this building, the U.S. EPA mandated requirements for the removal and disposal of the PCB bulk product waste as well as for confirmatory sampling to ensure that the interior and exterior of the building were decontaminated. Although U.S. EPA regulations under the Toxic Substances Control Act stipulate procedures by which PCB-contaminated materials must be handled and disposed, the regulations apparently do not require that materials such as caulking be tested to determine its PCB content. This limited investigation strongly suggests that were this testing done, many buildings would be found to contain high levels of PCBs in the building materials and potentially in the building environment. The presence of PCBs in schools is of particular concern given evidence suggesting that PCBs are developmental toxins.
Resumo:
Current building regulations are generally prescriptive in nature. It is widely accepted in Europe that this form of building regulation is stifling technological innovation and leading to inadequate energy efficiency in the building stock. This has increased the motivation to move design practices towards a more ‘performance-based’ model in order to mitigate inflated levels of energy-use consumed by the building stock. A performance based model assesses the interaction of all building elements and the resulting impact on holistic building energy-use. However, this is a nebulous task due to building energy-use being affected by a myriad of heterogeneous agents. Accordingly, it is imperative that appropriate methods, tools and technologies are employed for energy prediction, measurement and evaluation throughout the project’s life cycle. This research also considers that it is imperative that the data is universally accessible by all stakeholders. The use of a centrally based product model for exchange of building information is explored. This research describes the development and implementation of a new building energy-use performance assessment methodology. Termed the Building Effectiveness Communications ratios (BECs) methodology, this performance-based framework is capable of translating complex definitions of sustainability for energy efficiency and depicting universally understandable views at all stage of the Building Life Cycle (BLC) to the project’s stakeholders. The enabling yardsticks of building energy-use performance, termed Ir and Pr, provide continuous design and operations feedback in order to aid the building’s decision makers. Utilised effectively, the methodology is capable of delivering quality assurance throughout the BLC by providing project teams with quantitative measurement of energy efficiency. Armed with these superior enabling tools for project stakeholder communication, it is envisaged that project teams will be better placed to augment a knowledge base and generate more efficient additions to the building stock.
Resumo:
The retrofitting of existing buildings for decreased energy usage, through increased energy efficiency and for minimum carbon dioxide emissions throughout their remaining lifetime is a major area of research. This research area requires development to provide building professionals with more efficient building retrofit solution determination tools. The overarching objective of this research is to develop a tool for this purpose through the implementation of a prescribed methodology. This has been achieved in three distinct steps. Firstly, the concept of using the degree-days modelling method as an adequate means of basing retrofit decision upon was analysed and the results illustrated that the concept had merit. Secondly, the concept of combining the degree-days modelling method and the Genetic Algorithms optimisation method is investigated as a method of determining optimal thermal energy retrofit solutions. Thirdly, the combination of the degree-days modelling method and the Genetic Algorithms optimisation method were packaged into a building retrofit decision-support tool and named BRaSS (Building Retrofit Support Software). The results demonstrate clearly that, fundamental building information, simplified occupancy profiles and weather data used in a static simulation modelling method is a sufficient and adequate means to base retrofitting decisions upon. The results also show that basing retrofit decisions upon energy analysis results are the best means to guide a retrofit project and also to achieve results which are optimum for a particular building. The results also indicate that the building retrofit decision-support tool, BRaSS, is an effective method to determine optimum thermal energy retrofit solutions.
Resumo:
Most studies on the environmental performance of buildings focus on energy demand and associated greenhouse gas emissions. They often neglect to consider the range of other resource demands and environmental impacts associated with buildings, including water. Studies that assess water use in buildings typically consider only operational water, which excludes the embodied water in building materials or the water associated with the mobility of building occupants. A new framework is presented that quantifies water requirements at the building scale (i.e. the embodied and operational water of the building as well as its maintenance and refurbishment) and at the city scale (i.e. the embodied water of nearby infrastructures such as roads, gas distribution and others) and the transport-related indirect water use of building occupants. A case study house located in Melbourne, Australia, is analysed using the new framework. The results show that each of the embodied, operational and transport requirements is nearly equally important. By integrating these three water requirements, the developed framework provides architects, building designers, planners and decision-makers with a powerful means to understand and effectively reduce the overall water use and associated environmental impacts of residential buildings.