917 resultados para ACCELERATOR FACILITY
Resumo:
This work is based on the prototype High Engineering Test Reactor (HTTR) of the Japan Agency of Energy Atomic (JAEA). Its objective is to describe an adequate deterministic model to be used in the assessment of its design safety margins via damage domains. The concept of damage domain is defined and it is shown its relevance in the ongoing effort to apply dynamic risk assessment methods and tools based on the Theory of Stimulated Dynamics (TSD). To illustrate, we present results of an abnormal control rod (CR) withdrawal during subcritical condition and its comparison with results obtained by JAEA. No attempt is made yet to actually assess the detailed scenarios, rather to show how the approach may handle events of its kind
Resumo:
The application of liquid metal technology in fusion devices requires R&D related to many phenomena: interaction between liquid metals and structural material as corrosion, erosion and passivation techniques; magneto-hydrodynamics; free surface fluid-dynamics and any other physical aspect that will be needed for their safe reliable operation. In particular, there is a significant shortage of experimental facilities dedicated to the development of the lithium technology. In the framework of the TECHNOFUSION project, an experimental laboratory devoted to the lithium technology development is proposed, in order to shed some light in the path to IFMIF and the design of chamber's first wall and divertors. The conceptual design foresee a development in two stages, the first one consisting on a material testing loop. The second stage proposes the construction of a mock-up of the IFMIF target that will allow to assess the behaviour of a free-surface lithium target under vacuum conditions. In this paper, such conceptual design is addressed.
Resumo:
An automated panoramic irradiator with a 3 Ci 241Am-Be neutron source is installed in a bunker-type large room at the Universidad Politécnica de Madrid (UPM). It was recently modified and a neutron spectrometry campaign was organized to characterize the neutron fields in different measurement points along the irradiation bench. Four research groups working with different Bonner Sphere Spectrometers (BSS) and using different spectral unfolding codes took part to this exercise. INFN-LNF used a BSS formed by 9 spheres plus bare detector, with cylindrical, almost point like, 6LiI(Eu) scintillator (4 mm x 4 mm, from Ludlum); UAZ-UPM employed a similar system but with only 6 spheres plus bare detector; UAB worked with a 3He filled proportional counter at 8kPa filling pressure, cylindrical 9 mm x 10 mm (05NH1 from Eurisys) with 11 spheres configuration; and CIEMAT used 12 spheres with an spherical 3He SP9 counter (Centronic Ltd., UK) with very high sensitivity due to the large diameter (3.2 cm) and the filling pressure of the order of 228 kPa. Each group applied a different spectral unfolding method: INFN and UAB worked with FRUIT ver. 3.0 with their own response matrixes; UAZ-UPM used the BUNKIUT unfolding code with the response matrix UTA4 and CIEMAT employed the GRAVEL-MAXED-IQU package with their own response matrix. The paper shows the main results obtained in terms of neutron spectra at fixed distances from the source as well as total neutron fluence rate and ambient dose equivalent rate H*(10) determined from the spectra. The latter are compared with the readings of a common active survey-meter (LB 6411). The small differences in the results of the various groups are discussed.
Resumo:
In this work the use of ESS-Bilbao fast neutron lines for irradiation of materials for nuclear fusion is studied. For the comparison of ESS-Bilbao with an inertial fusion facility a simplified model of HiPER chamber has been used. Several positions for irradiation at ESS-Bilbao have been also compared. The material chosen for the damage analysis is silica due to its importance on IFC optics. In this work a detailed comparison between the two facilities for silica irradiation is given. The comparison covers the neutron fluxes, doses, defect production and PKA spectra. This study is also intended as a methodological approach or guideline for future works on other materials.
Resumo:
From the very first steps to execute a building, it is essential to analyze its life cycle. Similarly, we should consider the life cycle when projecting an urban intervention. Professionals of the Facility Management take part in construction projects, developing and managing DBFMO projects (Design, Build, Finance, Maintenance & Operate). Whatever the nature of the promoter is – private or public – promoters are leaders in projects of responsible management of spaces, whether these are work spaces, leisure spaces or residential spaces. They know and identify with the company and its performance, its values and its needs. These professionals give sustainable solutions in the life cycle of buildings (offices and housing), new ways to work and initiatives of innovations linked to current social changes: technology, social networks, and new habits. Concepts where innovation is essential should consider responsible values. Social, economic and sustainable aspects have to associate with the management performed by a Facilities Manager when considering the three groups of stakeholders with which it is linked: economic (shareholders), contractual (users), non-contractual (neighborhoods, organizations, etc.). Marcus Vitruvius Pollio, at the beginning of his book "The Ten Books on Architecture" describes and argues how the distribution in buildings must always adapt to their inhabitants. Let us build cities and buildings with responsible criteria, bearing in mind all its users and the needs of each one of them. Not to mention the need to adapt to future requirements with minimum cost and maximum profitability. These needs, under responsible management, are competencies developed by a Facilities Manager in his day to day. He cares and takes over the entire life cycle of buildings and their surroundings. This work is part of the PhD project whose main aim is to study the added value to the architectural profession when social responsibility criteria are applied in his/her role as Facility Manager.
Resumo:
From the moment we enter a large office building until we leave it, we receive a lot of attentions served by the management of services to the user. However, it is usually quite inappreciable the work that is being developed to keep things running smoothly.The services provided in a building are carried out by people. However, we often tend to forget these people when we talk about the tasks that make that a building operates properly 24 hours a day, 365 days a year.But, for example, what would happen if one day the service provided by the reception in a large building did not function as it should? What would it be like if one day the person performing the service of maintenance of the building's cleaning were not at his post? How would the working day develop if there were not a correct air handling system?People are the foundation of the proper functioning of a building. The work of the Facilities Manager and the Facility Management is the management of their functions: the responsible management of the team.
Resumo:
Collaborative efforts between the Neutronics and Target Design Group at the Instituto de Fusión Nuclear and the Molecular Spectroscopy Group at the ISIS Pulsed Neutron and Muon Source date back to 2012 in the context of the ESS-Bilbao project. The rationale for these joint activities was twofold, namely: to assess the realm of applicability of the low-energy neutron source proposed by ESS-Bilbao - for details; and to explore instrument capabilities for pulsed-neutron techniques in the range 0.05-3 ms, a time range where ESS-Bilbao and ISIS could offer a significant degree of synergy and complementarity. As part of this collaboration, J.P. de Vicente has spent a three-month period within the ISIS Molecular Spectroscopy Group, to gain hands-on experience on the practical aspects of neutron-instrument design and the requisite neutron-transport simulations. To date, these activities have resulted in a joint MEng thesis as well as a number of publications and contributions to national and international conferences. Building upon these previous works, the primary aim of this report is to provide a self-contained discussion of general criteria for instrument selection at ESS-Bilbao, the first accelerator-driven, low-energy neutron source designed in Spain. To this end, Chapter 1 provides a brief overview of the current design parameters of the accelerator and target station. Neutron moderation is covered in Chapter 2, where we take a closer look at two possible target-moderator-reflector configurations and pay special attention to the spectral and temporal characteristics of the resulting neutron pulses. This discussion provides a necessary starting point to assess the operation of ESSB in short- and long-pulse modes. These considerations are further explored in Chapter 3, dealing with the primary characteristics of ESS-Bilbao as a short- or long-pulse facility in terms of accessible dynamic range and spectral resolution. Other practical aspects including background suppression and the use of fast choppers are also discussed. The guiding principles introduced in the first three chapters are put to use in Chapter 4 where we analyse in some detail the capabilities of a small-angle scattering instrument, as well as how specific scientific requirements can be mapped onto the optimal use of ESS-Bilbao for condensed-matter research. Part 2 of the report contains additional supporting documentation, including a description of the ESSB McStas component, a detailed characterisation of moderator response and neutron pulses, and estimates ofparameters associated with the design and operation of neutron choppers. In closing this brief foreword, we wish to thank both ESS-Bilbao and ISIS for their continuing encouragement and support along the way.
Resumo:
Building-integrated Photovoltaics (BIPV) is one of the most promising technologies enabling buildings to generate on-site part of their electricity needs while performing architectural functionalities. A clear example of BIPV products consists of semi-transparent photovoltaic modules (STPV), designed to replace the conventional glazing solutions in building façades. Accordingly, the active building envelope is required to perform multiple requirements such as provide solar shading to avoid overheating, supply solar gains and thermal insulation to reduce heat loads and improve daylight utilization. To date, various studies into STPV systems have focused on their energy performance based on existing simulation programs, or on the modelling, normally validated by limited experimental data, of the STPV modules thermal behaviour. Taking into account that very limited experimental research has been conducted on the energy performance of STPV elements and that the characterization in real operation conditions is necessary to promote an energetically efficient integration of this technology in the building envelope, an outdoor testing facility has been designed, developed and built at the Solar Energy Institute of the Technical University of Madrid. In this work, the methodology used in the definition of the testing facility, its capability and limitations are presented and discussed.
Resumo:
El desarrollo del presente trabajo sigue, tanto una línea cronológica de las tareas realizadas, como una lógica, en la que se parte de un conocimiento mínimo de los sistemas espaciales hasta llegar al diseño completo de un Módulo de Cálculo de Potencia Eléctrica de un satélite para su aplicación en una instalación de diseño concurrente o CDF.
Resumo:
Este proyecto trata de diseñar el sistema eléctrico y de control de potencia de una maqueta del túnel aerodinámico ACLA-16 de la Universidad Politécnica de Madrid (UPM). Dicha maqueta se utiliza para estudiar el efecto de la capa límite atmosférica, debido a su importancia en el impacto sobre estructuras civiles. Primero se desarrolla una parte teórica sobre qué son los túneles aerodinámicos, las aplicaciones que tienen y conceptos básicos acerca de la capa límite atmosférica. Luego se analiza el diseño geométrico de la maqueta del túnel y se detallan los elementos que debe tener el sistema eléctrico. Además, se realiza una simulación por ordenador con un programa de CFD (Fluent) para comparar los resultados experimentales reales con los resultados numéricos de la simulación para comprobar si se pueden extraer resultados aceptables por ordenador y así ahorrar costes y tiempo en el estudio de ensayos.
Resumo:
El proyecto está basado en el estudio de la planta de potencia de un túnel aerodinámico. Para ello se ha realizado una breve introducción definiendo qué es un túnel aerodinámico, cuál es su propósito, qué tipos hay, etc. Posteriormente se ha escogido un tipo concreto de túnel entre todas las posibilidades y se ha procedido a su estudio. Se ha definido una forma y unas dimensiones y tras calcular las pérdidas de carga, se ha seleccionado la planta de potencia necesaria para compensar dichas pérdidas, dimensionándose también las conexiones de esta desde la acometida de potencia eléctrica. Por último se han dimensionado las conexiones correspondientes a la iluminación y los servicios que competen al túnel aerodinámico.
Resumo:
From the moment we enter a large office building until we leave it, we receive a lot of attentions served by the management of services to the user. However, it is usually quite inappreciable the work that is being developed to keep things running smoothly. The services provided in a building are carried out by people. However, we often tend to forget these people when we talk about the tasks that make that a building operates properly 24 hours a day, 365 days a year. But, for example, what would happen if one day the service provided by the reception in a large building did not function as it should? What would it be like if one day the person performing the service of maintenance of the building's cleaning were not at his post? How would the working day develop if there were not a correct air handling system? People are the foundation of the proper functioning of a building. The work of the Facilities Manager and the Facility Management is the management of their functions: the responsible management of the team.
Resumo:
La utilización de túneles aerodinámicos en ingeniería civil está cada vez más demandada debido al actual desarrollo urbanístico, esto es, la necesidad de edificios cada vez más altos en los que concentrar mayor cantidad de población, puentes y estructuras que faciliten el paso de medios de transporte alternativos, la importancia de los aspectos artísticos en la construcción (además de los funcionales), etc. Son muchos los factores que pueden hacer necesario el ensayo de alguna de esas estructuras en un túnel aerodinámico, y no existe un criterio universal a la hora de decidir si conviene o no hacerlo.
Resumo:
The aims of this study were to analyse perceptions regarding the sporting events held in the Madrid Sports Palace and to analyse whether those perceptions vary by age or gender. One hundred and ninetyfive residents answered the Ntloko and Swart (2008) questionnaire. The dimensions most highly rated were economic benefits (3.9±0.8), the event as a regional showcase (3.6±0.7), and the event as entertainment (3.4±0.6). However, the respondents did not agree with the negative environmental impact (2.0±0.8). Men rated the use of public money (z=2.4; pmenor que.05) and the regional showcase (z=2.0 pmenor que.05) more positively than women. Finally, women rated the increase in prices (z=2.0; pmenor que.05) more highly than men. The age groups differed significantly only regarding the promotion of community pride. Seniors and middle-aged adults rated it more positively than young adults (?2(2)=9.9; pmenor que.01). The fact that in an urban sports facility regular sporting events take place on a regular basis means that there are diverse perceptions, though mainly positive, and those perceptions differ from the perceptions about mega events that take place once in a life time at temporary sports facilities.
Resumo:
The use of the Laser MegaJoule facility within the shock ignition scheme has been considered. In the first part of the study, one-dimensional hydrodynamic calculations were performed for an inertial confinement fusion capsule in the context of the shock ignition scheme providing the energy gain and an estimation of the increase of the peak power due to the reduction of the photon penetration expected during the high-intensity spike pulse. In the second part, we considered a Laser MegaJoule configuration consisting of 176 laser beams that have been grouped providing two different irradiation schemes. In this configuration the maximum available energy and power are 1.3 MJ and 440 TW. Optimization of the laser?capsule parameters that minimize the irradiation non-uniformity during the first few ns of the foot pulse has been performed. The calculations take into account the specific elliptical laser intensity profile provided at the Laser MegaJoule and the expected beam uncertainties. A significant improvement of the illumination uniformity provided by the polar direct drive technique has been demonstrated. Three-dimensional hydrodynamic calculations have been performed in order to analyse the magnitude of the azimuthal component of the irradiation that is neglected in twodimensional hydrodynamic simulations.