943 resultados para single operation cycle
Resumo:
In vitro-matured (IVM) bovine oocytes were activated with single and combined treatments of strontium (S), ionomycin (1) and 6-DMAP (D). Using oocytes IVM for 26 h, we observed that activation altered cell cycle kinetics (faster progression, MIII arrest, or direct transition from MII to pronuclear stage) when compared to in vitro fertilization. The effect of oocyte age on early parthenogenesis was assessed in oocytes IVM for 22, 26 and 30 h. Better results in pronuclear development were obtained in treatments ISD (81.7%) at 22 h; D (66.7%), IS (63.3%), ID (73.3%) and ISD (76.7%) at 26 h; and D (86.7%), IS (85.0%) and ID (78.3%) at 30 h. Higher cleavage occurred on ISD (80.0%) at 22 h; ID (83.3%) and ISD (91.7%) at 26 h; and 1 (86.7%), IS (90.0%), ID (85.0%) and ISD (95.0%) at 30 h. More blastocysts were achieved in ID (25.0%) and ISD (18.3%) at 22h; and in ID at 26h (45.0%) and 30h (50.0%). We also observed that IS allowed higher haploid (77.4%) embryonic development, whilst ID was better for diploid (89.1%) development. It was concluded that association of S and D without I was not effective for blastocyst development; treatments using S were less influenced by oocyte age, but when S was associated with D there was a detrimental effect on aged oocytes; treatment ISD promoted higher activation and cleavage rates in young oocytes and ID protocol was the best for producing blastocysts.
Resumo:
In the first paper of this paper (Part I), conditions were presented for the gas cleaning technological route for environomic optimisation of a cogeneration system based in a thermal cycle with municipal solid waste incineration. In this second part, an environomic analysis is presented of a cogeneration system comprising a combined cycle composed of a gas cycle burning natural gas with a heat recovery steam generator with no supplementary burning and a steam cycle burning municipal solid wastes (MSW) to which will be added a pure back pressure steam turbine (another one) of pure condensation. This analysis aims to select, concerning some scenarios, the best atmospheric pollutant emission control routes (rc) according to the investment cost minimisation, operation and social damage criteria. In this study, a comparison is also performed with the results obtained in the Case Study presented in Part I. (c) 2007 Elsevier Ltd. All rights reserved.
Resumo:
This paper presents a new single-phase interleaved high power factor boost pre-regulator operating in critical conduction mode, where the switches and boost diode performing zero-current commutations during its turn-off, eliminating the disadvantages related to the reverse recovery losses and electromagnetic interference problems of the boost diode, when operating in the continuous conduction mode. The interleaving technique is applied in the power cell, providing a significant input current ripple reduction in comparison to discontinuous mode of operation, due to its input current continuous conduction operation. This paper presents a complete modeling for the converter operating in critical conduction mode, resulting in an improved design procedure for interleaved techniques with high input power factor, a complete design procedure, and main simulation results from a design example with two interleaved cells rated at 1kW, 400V output voltage and 220V rms input voltage.
Resumo:
This paper presents a novel single-phase high-power-factor (HPF) pulsewidth-modulated (PWM) boost rectifier featuring soft commutation of the active switches at zero current (ZC), It incorporates the most desirable properties of conventional PWM and soft-switching resonant techniques.The input current shaping is achieved with average current mode control and continuous inductor current mode.This new PWM converter provides ZC turn on and turn off of the active switches, and it is suitable for high-power applications employing insulated gate bipolar transistors (IGBT's),The principle of operation, the theoretical analysis, a design example, and experimental results from a laboratory prototype rated at 1600 W with 400-Vdc output voltage are presented. The measured efficiency and the power factor were 96.2% and 0.99%, respectively, with an input current total harmonic distortion (THD) equal to 3.94%, for an input voltage with THD equal to 3.8%, at rated load.
Resumo:
This paper is based on the development and experimental analysis of a DCM Boost interleaved converter suitable for application in traction systems of electrical vehicles pulled by electrical motors (Trolleybus), which are powered by urban DC or AC distribution networks. This front-end structure is capable of providing significant improvements in trolleybuses systems and in the urban distribution network costs, and efficiency. The architecture of proposed converter is composed by five boost power cells in interleaving connection, operating in discontinuous conduction mode. Furthermore, the converter can operate as AC-DC converter, or as DC-DC converter providing the proper DC output voltage range required by DC or AC adjustable speed drivers. Therefore, when supplied by single-phase AC distribution networks, and operating as AC-DC converter, it is capable to provide high power factor, reduced harmonic distortion in the input current, complying with the restrictions imposed by the IEC 61000-3-4 standards. The digital controller has been implemented using a low cost FPGA and developed totally using a hardware description language VHDL and fixed point arithmetic. Thus, two control strategies are evaluated considering the compliance with input current restrictions imposed by IEC 61000-3-4 standards, the regular PWM modulation and a current correction PWM modulation. In order to verify the feasibility and performance of the proposed system, experimental results from a 15 kW low power scale prototype are presented, operating in DC and AC conditions.
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Callinectes danae Smith, 1869, known as siri-azul, is an important fishery resource along the Brazilian coast. The reproductive cycle of this species was studied based on their moult cycle and the development of their gonads. The animals were collected with an otter-trawl in the Ubatuba region (23 degrees 26'S 45 degrees 02'W) every other month from July 1991 to May 1993. A total of 1826 specimens were captured: 788 males and 1038 females. Ovigerous females and specimens with developed gonads in both sexes were found in all months sampled. In females, moult activity was recorded in all size classes while in males, it was verified from 20-27 mm to 90-97 mm size classes. The females produced more than one clutch during a single reproductive season, a fact evidenced by the presence of ovigerous females with ovaries in all the development phases. The species C. danae reproduces continuously, like most brachyurans from tropical waters.
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
A regimen of progesterone plus estradiol (P&E) was used as a standard for ovarian synchronization to test the efficacy and evaluate the commercial application of ultrasound-guided follicle ablation as a non-steroidal alternative for ovulation synchronization in mares. Recipient mares at a private embryo transfer facility were at unknown stages of the estrous cycle at the start of the experiment on Day 1 when they were randomly assigned to an ablation group (n = 18-21 mares) or to a ME group (n = 20-21 mares). In the ablation group, mares were lightly sedated and all follicles > 10 mm were removed by transvaginal ultrasound-guided follicle aspiration. In the ME group, a combination of progesterone (150 mg) plus estradiol (10 mg) prepared in safflower oil was given daily (im) for 10 d. Two doses of prostaglandin FZ, (PGF, 10 mg/dose, im) were given 12 h apart on Day 5 in the ablation group, or a single dose on Day 10 in the ME group. Human chorionic gonadotropin (hCG, 2500 IU/mare, im) was given at a fixed time, 6 and 10 d after PGF treatment in the ablation and ME groups, respectively, with the expectation of a follicle > 30 mm at the time of treatment. In both the ablation and P&E groups, transrectal ultrasonography was done at the start of the study (Day 1) and again on the day of hCG treatment and daily thereafter to determine the presence of a CL, measure diameter of the largest follicle and detect ovulation. The mean interval from the start of the study and from PGF treatment to ovulation was shorter (P < 0.0001) in the ablation group (13.7 and 9.7 d, respectively) compared to the P&E group (22.3 and 13.2 d, respectively). Following fixed-day treatment with hCG after PGF treatment, the degree of ovulation synchronization was not different (P > 0.05) between the ablation and P&E groups within a 2-d (56 and 70%) or 4-d (83% and 90%) period. Although ultrasound-guided follicle ablation may not be practical in all circumstances, it excluded the conventional 10-d regimen of progesterone and estradiol and was considered an efficacious and feasible, non-steroidal alternative for ovulation synchronization in mares during the estrous cycle. (C 2007 Elsevier B.V. All rights reserved.
Resumo:
Representative Life-Cycle Inventories (LCIs) are essential for Life-Cycle Assessments (LCAs) quality and readiness. Because energy is such an important element of LCAs, appropriate LCIs on energy are crucial, and due to the prevalence of hydropower on Brazilian electricity mix, the frequently used LCIs are not representative of the Brazilian conditions. The present study developed a LCI of the Itaipu Hydropower Plant, the major hydropower plant in the world, responsible for producing 23.8% of Brazil's electricity consumption. Focused on the capital investments to construct and operate the dam, the LCI was designed to serve as a database for the LCAs of Brazilian hydroelectricity production. The life-cycle boundaries encompass the construction and operation of the dam, as well as the life-cycles of the most important material and energy consumptions (cement, steel, copper, diesel oil, lubricant oil), as well as construction site operation, emissions from reservoir flooding, material and workers transportation, and earthworks. As a result, besides the presented inventory, it was possible to determine the following processes, and respective environmental burdens as the most important life-cycle hotspots: reservoir filling (CO(2) and CH(4) emission: land use); steel life-cycle (water and energy consumption; CO, particulates, SO(x) and NO(x) emissions); cement life-cycle (water and energy consumption; CO(2) and particulate emissions); and operation of civil construction machines (diesel consumption; NO(x) emissions). Compared with another hydropower studies, the LCI showed magnitude adequacy, with better results than small hydropower, which reveals a scale economy for material and energy exchanges in the case of ltaipu Power Plant. (C) 2009 Elsevier Ltd. All rights reserved.
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
The authors present an offline switching power supply with multiple isolated outputs and unity power factor with the use of only one power processing stage, based on the DC-DC SEPIC (single ended primary inductance converter) modulated by variable hysteresis current control. The principle of operation, the theoretical analysis, the design procedure, an example, and simulation results are presented. A laboratory prototype, rated at 160 W, operating at a maximum switching frequency of 100 kHz, with isolated outputs rated at +5 V/15 A -5 V/1 A, +12 V/6 A and -12 V/1 A, has been built given an input power factor near unity.
Resumo:
In this paper, is presented an economical and technical feasibility study of a combined cycle cogeneration system proposed to be used in a pulp plant located in Brazil, where around 95% of country's pulp production is done by the use of Kraft Process. This process allows the use of black liquor and other by-products as fuel. This study is based upon actual data from a pulp plant with a daily production of 1000 tons., that generates part of the energy demanded by the process in a conventional cogeneration system with condensing steam turbine and two extractions. The addition of a gas turbine was studied to compare electricity production level and its related costs between original system and the new one, considering that the former can use industrial by-products and firewood as fuel, when required. Several parameters related to electric generation systems operation and production costs were studied. The use of natural gas in the combined cycle, in comparison with the use of firewood in the conventional system was studied. The advantages of natural gas fuel are highlighted. The surplus availability and the electricity generation costs are presented as a function of pulp and black liquor production.