870 resultados para internal drainage
Resumo:
The relationships between stratigraphic and tectonic setting, recharge processes and underground drainage of the glacierised karst aquifer system `Tsanfleuron-Sanetsch' in the Swiss Alps have been studied by means of various methods, particularly tracer tests (19 injections). The area belongs to the Helvetic nappes and consists of Jurassic to Palaeogene sedimentary rocks. Strata are folded and form a regional anticlinorium. Cretaceous Urgonian limestone constitutes the main karst aquifer, overlain by a retreating glacier in its upper part. Polished limestone surfaces are exposed between the glacier front and the end moraine of 1855/1860 (Little Ice Age); typical alpine karrenfields can be observed further below. Results show that (1) large parts of the area are drained by the Glarey spring, which is used as a drinking water source, while marginal parts belong to the catchments of other springs; (2) groundwater flow towards the Glarey spring occurs in the main aquifer, parallel to stratification, while flow towards another spring crosses the entire stratigraphic sequence, consisting of about 800 m of marl and limestone, along deep faults that were probably enlarged by mass movements; (3) the variability of glacial meltwater production influences the shape of the tracer breakthrough curves and, consequently, flow and transport in the aquifer.
Resumo:
The stability of air bubbles in fresh concrete can have a profound influence of the potential durability of the system, because excessive losses during placement and consolidation can compromise the ability of the mixture to resist freezing and thawing. The stability of air void systems developed by some air entraining admixtures (AEAs) could be affected by the presence of some polycarboxylate-based water reducing admixtures (WRAs). The foam drainage test provides a means of measuring the potential stability of air bubbles in a paste. A barrier to acceptance of the test was that there was little investigation of the correlation with field performance. The work reported here was a limited exercise seeking to observe the stability of a range of currently available AEA/WRA combinations in the foam drainage test; then, to take the best and the worst and observe their stabilities on concrete mixtures in the lab. Based on the data collected, the foam drainage test appears to identify stable combinations of AEA and WRA.
Resumo:
Conventional concrete is typically cured using external methods. External curing prevents drying of the surface, allows the mixture to stay warm and moist, and results in continued cement hydration (Taylor 2014). Internal curing is a relatively recent technique that has been developed to prolong cement hydration by providing internal water reservoirs in a concrete mixture that do not adversely affect the concrete mixture’s fresh or hardened physical properties. Internal curing grew out of the need for more durable structural concretes that were resistant to shrinkage cracking. Joint spacing for concrete overlays can be increased if slab warping is reduced or eliminated. One of the most promising potential benefits from using internal curing for concrete overlays, then, is the reduced number of joints due to increased joint spacing (Wei and Hansen 2008).
Resumo:
Well-performing subsurface drainage systems form an important aspect of pavement design by the Iowa Department of Transportation (DOT). The recently completed Iowa Highway Research Board (IHRB) project TR-643 provided extensive insights into Iowa subsurface drainage practices and pavement subdrain outlet performance. However, the project TR-643 (Phase I) forensic testing and evaluation were carried out in a drought year and during the fall season in 2012. Based on the findings of IHRB Project TR-643, the Iowa DOT requested an expanded Phase II study to address several additional research needs: evaluate the seasonal variation effects (dry fall 2012 versus wet spring/summer 2013, etc.) on subdrain outlet condition and performance; investigate the characteristics of tufa formation in Iowa subdrain outlets; investigate the condition of composite pavement subdrain outlets; examine the effect of resurfacing/widening/rehabilitation on subdrain outlets (e.g., the effects of patching on subdrain outlet performance); and identify a suitable drain outlet protection mechanism (like a headwall) and design for Iowa subdrain outlets based on a review of practices adopted by nearby states. A detailed forensic test plan was developed and executed for inspecting the Iowa pavement subdrains in pursuit of fulfilling the Phase II study objectives. The observed outlets with blockage and the associated surface distresses in newly constructed jointed plain concrete pavements (JPCPs) were slightly higher during summer 2013 compared to fall 2012. However, these differences are not significant. Less tufa formation due to the recycled portland cement concrete (RPCC) base was observed with (a) the use of plastic outlet pipe without the gate screen–type rodent guard and (b) the use of blended RPCC and virgin aggregate materials. In hot-mix asphalt (HMA) over JPCP, moisture-related distress types (e.g., reflection cracking) were observed more near blocked drainage outlet locations than near “no blockage” outlet locations. This finding indicates that compromised drainage outlet performance could accelerate the development of moisture-related distresses in Iowa composite pavement systems. ****** Note: This report follows on work report in "Evaluating Roadway Subsurface Drainage Practices, 2013" http://publications.iowa.gov/14902/ Note: This record contains links to the 210 page full report as well as the 3 page tech transfer summary. The summary is NOT deposited separately.
Determination of Flood Dischard Characteristics of Small Drainage Areas, HR-3, Progress Report, 1960
Resumo:
Project HR-3 of the Iowa Highway Research Board has been active since October 1, 1950. The project objective is the determination of flood discharge characteristics of small drainage areas. Funds for the project amount to $10,000 per year of which, by cooperative agreement, the Highway Commission and the U. S. Geological Survey each furnish $5,000. Previous reports have explained the set-up of the project and these explanations will not be repeated in this report.
Resumo:
The prescribing of antibiotics for uncomplicated skin abscesses and diverticulitis has no benefit. Some antibiotics are more at risk of causing a Clostridium difficile infection. The tests used to exclude a history of a penicillin allergy are safe. A threshold of D-dimer adjusted for the age significantly improves the specificity of the test without affecting the sensitivity. The prescription of paraclinics tests is not an effective "treatment" for the patient's anxiety. In the sleep apnea syndrome, treatment with CPAP (Continuous positive airway pressure) appears to have more benefits compared to the mandibular advancement prosthesis. The work of primary care physicians can be supported by the work of advanced practice nurses. The limitation placed on the working hours of doctors in hospitals seems to affect their ability to spend time with their patients.
Resumo:
Purpose:To evaluate the histological features of cellular retinal fragments on the internal limiting membrane (ILM) removed during epiretinal membrane peeling surgery with and without the aid of ICG diluted in 5% glucose Methods:ILM specimens removed from 88 eyes undergoing vitrectomy and membrane peeling surgery for idiopathic epiretinal membrane between 1995 and 2003 were reviewed retrospectively. Surgery was performed in all cases by the same surgeon using the same technique. ICG was diluted with 5% glucose. Histological analysis focused on the presence and characteristics of retinal structures on the retinal surface of the ILM. Statistical analysis compared the results between group I (conventional surgery without ICG) and group II (ICG-assisted peeling) Results:Seventy-one eyes underwent EMM surgery without the aid of ICG (group I) and seventeen underwent EMM ICG-assisted surgery assisted using ICG (group II). The amount of Muller cell debris on the retinal surface of the ILM was more significant in the group I (no ICG) than in the group II (ICG) (40.8 versus 11.8; p = 0.024). Large fragments of Muller cells were more frequently observed in the group I (no ICG) than in the group II (ICG) (63.4% versus 23.5%; p= 0.003).The presence of larger retinal elements such as neural axons and vessels were observed attached to retinal face of the ILM in 5 (7%) cases of the no-ICG group. No such retinal elements were detected in any of the histological ILM specimens of the ICG-assisted group Conclusions:The use of ICG diluted with 5% glucose in the aid of ILM removal during epiretinal membrane surgery was associated with less retinal debris attached to retinal face of the ILM compared to surgery in which ICG was not used. Our findings contradict previous reports in the literature, in which use of ICG diluted with balanced salt solution (BSS) was associated with more retinal fragments attached to the retinal face of the ILM. According to our results, we hypothesize that diluting ICG with 5% glucose may decrease the adhesion of the ILM to the underlying retinal layers such that less retinal debris is removed with peeling of the ILM.
Resumo:
Between 1959 and 1987 we operated on 18 patients for malignant oddian tumor. Eleven had a Whipple resection, 3 a bilio-enteric anastomosis, 4 a local excision with or without bilio-enteric anastomosis. The overall operative mortality was 11% and the median survival was 13.8 months. Three patients are living and without evidence of disease 12, 29 and 30 months, respectively, after a Whipple resection. Because of their anatomy and favourable behaviour, malignant oddian tumors must be separated from the other periampullary tumors. Echography and endoscopic retrograde cholangiopancreatography with deep biopsies are the most efficient diagnostic modalities. With the aim of cure, the treatment is always surgical and relies mainly on duodenopancreatectomy. Those patients with unresectable tumors or unfit for a major procedure should benefit from internal or external biliary drainage. By coexisting duodenal obstruction, a surgical double derivation should be done.
Resumo:
The relationship between Iowa’s roads and drainage developed when rural roads were originally constructed. The land parallel to roadways was excavated to create road embankments. The resulting ditches provided an outlet for shallow tiles to drain nearby fields for farming. Iowa’s climate and terrain are nearly ideal for farming, and more than 90 percent of the land suits the purpose. Much of the land, however, needs to be artificially drained to achieve maximum productivity. Most of this drainage has been accomplished with an extensive network of levees, open ditches, and underground tiles. The U.S. Census Bureau estimated that as early as 1920 approximately nine million acres of Iowa farm land had been artificially drained or needed to be. Couple this drainage system with Iowa’s extensive surface transportation system—approximately 100,000 miles of roads and streets, 90,000 on local systems— and potential for conflicts will naturally arise. This is particularly true with urban expansion resulting in residential and commercial development of rural land. This manual contains summaries of and references to the laws most relevant to drainage in Iowa. It also includes frequently asked questions about transportation agencies’ responsibilities related to drainage. Typical policies and agreement forms used by agencies to address drainage issues are illustrated and a glossary of common terms is included.
Resumo:
Several strategies are available to the Iowa Department of Transportation (IaDOT) for limiting deterioration due to chloride-induced corrosion of embedded reinforcing bars in concrete bridge decks. While the method most commonly used throughout the Midwestern United States is to construct concrete bridge decks with fusion-bonded epoxy-coated reinforcing bars, galvanized reinforcing bars are an available alternative. Previous studies of the in situ performance of galvanized reinforcing bars in service in bridge decks have been limited. IaDOT requested that Wiss, Janney, Elstner Associates, Inc. (WJE) perform this study to gain further understanding of the long-term performance of an Iowa bridge deck reinforced with galvanized reinforcing bars. This study characterized the condition of a bridge deck with galvanized reinforcing bars after about 36 years of service and compared that performance to the expected performance of epoxy-coated or uncoated reinforcing bars in similar bridge construction. For this study, IaDOT selected the Iowa State Highway 92 bridge across Drainage Ditch #25 in Louisa County, Iowa (Structure No. 5854.5S092), which was constructed using galvanized reinforcing bars as the main deck reinforcing. The scope of work for this study included: field assessment, testing, and sampling; laboratory testing and analysis; analysis of findings; service life modeling; and preparation of this report. In addition, supplemental observations of the condition of the galvanized reinforcing bars were made during a subsequent project to repair the bride deck.
Resumo:
In the preparation of this compilation of drainage laws of Iowa, an attempt has been made to include those sections of the Code to which reference is frequently required by the State Highway Commission, Boards of Supervisors and County Engineers in the conduct of highway and road administration as it is affected by the Iowa drainage laws. Of necessity some Code provisions which have a bearing on the principal subject were omitted. Enactments of the 56th General Assembly which modify existing code sections have been included as part of the regular text of the Code sections included in this publication. THE USER IS CAUTIONED THAT THESE CODE SECTIONS, AS MODIFIED BY THE 56th GENERAL ASSEMBLY, ARE NOT A PART OF THE 1954 CODE OF IOWA AND ARE OFFICIAL ONLY INSOFAR AS THEY ARE PRINTED IN THE OFFICIAL PUBLICATION ACTS OF THE 56TH GENERAL ASSEMBLY. SINCE THE 57TH GENERAL ASSEMBLY IS IN SESSION DURING THE PRINTING OF THIS PUBLICATION, ENACTMENTS OF THAT BODY WHICH AMEND OR REPEAL SECTIONS SET OUT HEREIN ARE INCLUDED IN THE BACK OF THIS VOLUME ON THE PINK-COLORED PAPER. THE USER IS CAUTIONED IN USING THIS VOLUME TO REFER TO THE TABLE OF SECTIONS REPEALED OR AMENDED, ON THE PINK-COLORED PAPER AT THE BACK OF THIS VOLUME. This publication is offered with the hope and belief that it will prove to be of value and assistance to those concerned with the problems of administering a highway, road and drainage system.
Resumo:
Abstract