986 resultados para implementation plan
Resumo:
Cover title.
Resumo:
Thesis (Master's)--University of Washington, 2016-06
Resumo:
Prior to the development of a production standard control system for ML Aviation's plan-symmetric remotely piloted helicopter system, SPRITE, optimum solutions to technical requirements had yet to be found for some aspects of the work. This thesis describes an industrial project where solutions to real problems have been provided within strict timescale constraints. Use has been made of published material wherever appropriate, new solutions have been contributed where none existed previously. A lack of clearly defined user requirements from potential Remotely Piloted Air Vehicle (RPAV) system users is identified, A simulation package is defined to enable the RPAV designer to progress with air vehicle and control system design, development and evaluation studies and to assist the user to investigate his applications. The theoretical basis of this simulation package is developed including Co-axial Contra-rotating Twin Rotor (CCTR), six degrees of freedom motion, fuselage aerodynamics and sensor and control system models. A compatible system of equations is derived for modelling a miniature plan-symmetric helicopter. Rigorous searches revealed a lack of CCTR models, based on closed form expressions to obviate integration along the rotor blade, for stabilisation and navigation studies through simulation. An economic CCTR simulation model is developed and validated by comparison with published work and practical tests. Confusion in published work between attitude and Euler angles is clarified. The implementation of package is discussed. dynamic adjustment of assessment. the theory into a high integrity software Use is made of a novel technique basing the integration time step size on error Simulation output for control system stability verification, cross coupling of motion between control channels and air vehicle response to demands and horizontal wind gusts studies are presented. Contra-Rotating Twin Rotor Flight Control System Remotely Piloted Plan-Symmetric Helicopter Simulation Six Degrees of Freedom Motion ( i i)
Resumo:
Background: The Respiratory Health Network in Western Australia developed the Asthma Model of Care in 2010 which incorporates best practice guidelines. At the same time short-acting beta agonist guidelines (SABA) were developed by stakeholder consensus at University of Western Australia (UWA) and incorporated the use of an Asthma Action Plan Card. Objective: To report on the implementation of a key component of the WA Asthma Model of Care, the SABA guidelines that incorporate the Asthma Action Plan card. Methods: Implementation strategies included lectures, direct pharmacy detailing, media releases, and information packs (postal and electronic). Groups targeted included pharmacists, consumers and medical practitioners. Results: State-based (n=18) and national (n=6) professional organisations were informed about the launch of the guidelines into practice in WA. In the four-month implementation period more than 47,000 Asthma Action Plan Cards were distributed, primarily to community pharmacies. More than 500 pharmacies were provided with information packs or individual detailing. More than 10,000 consumers were provided with information about the guidelines. Conclusions and implications: The collaboration of stakeholders in this project allowed for widespread access to various portals which, in turn, resulted in a multifaceted approach in disseminating information. Ongoing maintenance programs are required to sustain and build on the momentum of the implementation program and to ultimately address patient outcomes and practice change, which would be the longer-term goals of such a project. Future research will seek to ascertain the impact of the card on patient outcomes in WA.
Resumo:
This paper analyzes a case study of wireless network implementation in a politically sensitive environment and seeks to gain practical insights for IT managers in today’s networked economy. The case evolved around an urgent decision to implement wireless networks that were a radical replacement for the existing wired network infrastructure. Although the wireless network infrastructure was well calculated as being considerably cost-efficient, inexperienced administrators and IT department failed to consult various involved stakeholders. Consequently, unintended results of wireless network implementation entangled with the cost efficiency of technology outcome and in turn undermined the objectives and achievement of the initial project plan. Drawing from social perspectives, this case study challenges traditionally dominant perspectives of technology efficiency and summarizes several lessons that could help IT managers and policy makers to better strategize ICT in general, and wireless networks in particular.
Resumo:
The objective of Total Productive Maintenance (TPM) is to maximise plant and equipment effectiveness, to create a sense of ownership for operators, and promote continuous improvement through small group activities involving production, engineering and maintenance personnel. This paper describes and analyses a case study of TPM implementation at a newspaper printing house in Singapore. However, rather than adopting more conventional implementation methods such as employing consultants or through a project using external training, a unique approach was adopted based on Action Research using a spiral of cycles of planning, acting observing and reflecting. An Action Research team of company personnel was specially formed to undertake the necessary fieldwork. The team subsequently assisted with administering the resulting action plan. The main sources of maintenance and operational data were from interviews with shop floor workers, participative observation and reviews conducted with members of the team. Content analysis using appropriate statistical techniques was used to test the significance of changes in performance between the start and completion of the TPM programme. The paper identifies the characteristics associated with the Action Research method when used to implement TPM and discusses the applicability of the approach in related industries and processes.
Resumo:
Purpose - Enterprise resource planning (ERP) systems are limited due to their operation around a fixed design production process and a fixed lead time to production plan and purchasing plan. The purpose of this paper is to define the concept of informality and to describe the notion of a system combining informality and ERP systems, based on empirical research from four manufacturing case studies. Design/methodology/approach - The case studies present a range of applications of ERP and are analysed in terms of the three characteristics of informality, namely, organisation structure, communication method and leadership approach. Findings - The findings suggest that systems consisting of informality in combination with ERP systems can elicit knowledge fromfrontlineworkers leading to timely improvements in the system. This is achieved by allowing users to modify work procedures or production orders, and to support collaborative working among all employees. However it was found that informality is not required for manufacturers with a relatively stable environment who can deal with uncertainty with a proactive strategy. Research limitations/implications - This study was carried out in China, with four companies as unit of analysis. Future work can help to extend this study across countries. Originality/value - The use of Four dimensions of informality that relate to manufacturers implementing ERP are defined as "technology in practice", "user flexibility", "trusted human networks" and "positive reaction to uncertainty". This is a new construct not applied before to ERP implementations.
Resumo:
The implementation of collaborative planning and teaching models in ten flexibly scheduled elementary and middle school library media centers was studied to determine which factors facilitated the collaborative planning process and to learn what occurs when library media specialists (LMSs) and classroom teachers (CTs) plan together. In this qualitative study, 61 principals, CTs, and LMSs were interviewed on a range of topics including the principal's role, school climate, the value of team planning, the importance of information literacy instruction, and the ideal learning environment. Other data sources were observations, videotapes of planning sessions, and documents. This three-year school reform effort was funded by the Library Power Project to improve library programs, to encourage collaborative planning, and to increase curricular integration of information literacy skills instruction. ^ The findings included a description of typical planning sessions and the identification of several major factors which impacted the success of collaborative planning: the individuals involved, school climate, time for planning, the organization of the school, the facility and collection, and training. Of these factors, the characteristics and actions of the people involved were most critical to the implementation of the innovation. The LMS was the pivotal player and, in the views of CTs, principals, and LMSs themselves, must be knowledgeable about curriculum, the library collection, and instructional design and delivery; must be open and welcoming to CTs and use good interpersonal skills; and must be committed to information literacy instruction and willing to act as a change agent. The support of the principal was vital; in schools with successful programs, the principal served as an advocate for collaborative planning and information literacy instruction, provided financial support for the library program including clerical staff, and arranged for LMSs and CTs to have time during the school day to plan together. ^ CTs involved in positive planning partnerships with LMSs were flexible, were open to change, used a variety of instructional materials, expected students to be actively involved in their own learning, and were willing to team teach with LMSs. Most CTs planning with LMSs made lesson plans in advance and preferred to plan with others. Also, most CTs in this study planned with grade level or departmental groups, which expedited the delivery of information literacy instruction and the effective use of planning time. ^ Implications of the findings of this research project were discussed for individual schools, for school districts, and for colleges and universities training LMSs, CTs, and administrators. Suggestions for additional research were also included. ^
Resumo:
The purpose of this study was to ascertain the perceptions of educators at one elementary school regarding the changes in the teaching and learning environment and their related effects following the implementation of Florida's A+ high-stakes accountability system. This study also assessed whether these changes were identified by participants as meaningful and enduring, in terms of the definition by Lieberman and Miller (1999). Twenty-one educators, including 17 teachers and four administrators, at Blue Ribbon Elementary school were interviewed. Data were inductively coded and categorized into four major themes: (a) teaching and learning environment consistency, (b) changes in the teaching and learning environment since the implementation of A+, (c) effects of the changes, and (d) significant and enduring change. Findings fell into three categories (a) identified changes since A+ implementation, (b) effects of changes, and (c) what participants believed was significant and long term change, which included those characteristics of the school that had been identified as consistent in the teaching and learning environment. Statements of the participants explained their perceptions about what instructional decisions where made in response to the A+ Plan including the modification of curriculum, the addition or omission of subject matter taught, and the positive or negative impact these decisions had on the teaching and learning environment. It was found that study participants felt all changes and their effects were a direct result of the A+ Plan and viewed many of the changes as being neither significant nor long term Analysis of the educators' perceptions of the changes they experienced revealed the overall feeling that the changes were not indicative of what was necessary to make a school successful. For the participants, the changes lacked the characteristics that they had described as vital in what constituted success. This led to the conclusion that, by Lieberman and Miller's definition, the majority of changes and effects that were implemented at the school as a result of the mandated A+ Plan, were not meaningful and enduring for effective school reform. ^
Resumo:
The purpose of this research was to study the effect of the Florida A+ Plan accountability program on curriculum and instruction in four Title I public elementary schools in the Miami-Dade County Public Schools system. It focused on the experiences of the school principals and the classroom teachers of the four schools as they related to curriculum and instruction. The study included an analysis of the school improvement plans in curriculum and instruction for each school during the school years 1998-2004. ^ The study was conducted in the format of interviews with the school principals and principal selected classroom teachers who taught third, fourth, or fifth grade during the first six years of the Florida A+ Plan. The analysis of the school improvement plans focused on the implementation of curriculum and instruction for each of the four schools. It focused on the goals and measurable objectives selected by each school to improve its instructional program in the academic subjects of reading, mathematics, writing, and science. ^ The findings indicated that under the pressure to improve their school grade on the Florida A+ Plan, each of the target schools, based on individual needs assessments, and restructured their instructional program each school year as documented in their school improvement plans. They altered their programs by analyzing student performance data to realign curriculum and instruction. The analysis of the interviews with the principals and the teachers showed that each school year they restructured their program to align it with the FCAT content. This realigning was a collaborative effort on the part of the administration and the instructional staff. ^
Resumo:
The purpose of this study was to ascertain the perceptions of educators at one elementary school regarding the changes in the teaching and learning environment and their related effects following the implementation of Florida's A+ high-stakes accountability system. This study also assessed whether these changes were identified by participants as meaningful and enduring, in terms of the definition by Lieberman and Miller (1999). Twenty-one educators, including 17 teachers and four administrators, at Blue Ribbon Elementary school were interviewed. Data were inductively coded and categorized into four major themes: (a) teaching and learning environment consistency, (b) changes in the teaching and learning environment since the implementation of A+, (c) effects of the changes, and (d) significant and enduring change. Findings fell into three categories (a) identified changes since A+ implementation, (b) effects of changes, and (c) what participants believed was significant and long term change, which included those characteristics of the school that had been identified as consistent in the teaching and learning environment. Statements of the participants explained their perceptions about what instructional decisions where made in response to the A+ Plan including the modification of curriculum, the addition or omission of subject matter taught, and the positive or negative impact these decisions had on the teaching and learning environment. It was found that study participants felt all changes and their effects were a direct result of the A+ Plan and viewed many of the changes as being neither significant nor long term Analysis of the educators' perceptions of the changes they experienced revealed the overall feeling that the changes were not indicative of what was necessary to make a school successful. For the participants, the changes lacked the characteristics that they had described as vital in what constituted success. This led to the conclusion that, by Lieberman and Miller's definition, the majority of changes and effects that were implemented at the school as a result of the mandated A+ Plan, were not meaningful and enduring for effective school reform.
Resumo:
The purpose of this research was to design and implement a Series of Latin Shows to be featured at the Satine Restaurant located in The Diplomat Hotel in Hollywood, Florida. Three shows were created: "Electro Tango," "Bossa Nova Jazz," and "Piel Canela Night" to help generate interest for not only the Satine Restaurant but also for the surrounding area. The artistic concept included big bands, costumes, dancers and a DJ. A production book was created and included the most important aspects of the individual shows such as budgets, costumes, and ground plans, to assure the success of each event. Careful analysis was done for the demographic area and a marketing plan was designed and implemented. The research and practical application of similar shows in the industry determined that the production of these particular shows, although costly, have a qualifiable chance to succeed in this venue.
Resumo:
Action Plan B3 of the European Innovation Partnership on Active and Healthy Ageing (EIP on AHA) focuses on the integrated care of chronic diseases. Area 5 (Care Pathways) was initiated using chronic respiratory diseases as a model. The chronic respiratory disease action plan includes (1) AIRWAYS integrated care pathways (ICPs), (2) the joint initiative between the Reference site MACVIA-LR (Contre les MAladies Chroniques pour un VIeillissement Actif) and ARIA (Allergic Rhinitis and its Impact on Asthma), (3) Commitments for Action to the European Innovation Partnership on Active and Healthy Ageing and the AIRWAYS ICPs network. It is deployed in collaboration with the World Health Organization Global Alliance against Chronic Respiratory Diseases (GARD). The European Innovation Partnership on Active and Healthy Ageing has proposed a 5-step framework for developing an individual scaling up strategy: (1) what to scale up: (1-a) databases of good practices, (1-b) assessment of viability of the scaling up of good practices, (1-c) classification of good practices for local replication and (2) how to scale up: (2-a) facilitating partnerships for scaling up, (2-b) implementation of key success factors and lessons learnt, including emerging technologies for individualised and predictive medicine. This strategy has already been applied to the chronic respiratory disease action plan of the European Innovation Partnership on Active and Healthy Ageing.
Resumo:
The missions of the research are to assist the Iowa Department of Transortation (Iowa DOT) to: Define pavement management (PM) optimization; Identify the characteristics of PM optimization systems being developed or implemented; Identify specific and achievable objectives for the Iowa DOT pavement management optimization; Evaluate different PM optimization methodologies; Identify a methodology to perform PM optimization that best satisfies the Iowa DOT's objectives; Develop a plan for the implementation of the PM optimization selected. The project is divided into three (3) phases. The first phase has been completed and accomplished the first three missions (identified above). The second phase has been completed and accomplished the next two missions. Phase three will accomplish the last mission.
Resumo:
This Strategic Plan provides the Iowa Department of Transportation with guidelines for defining the acquisition and implementation of a document management system to automate current manual methods of document handling and distribution. In preparation for the production of the Strategic Plan, the USI Team conducted a series of user interviews at the DOT Ames and East Central Iowa Transportation Region facilities, and reviewed various documents relating to day-to-day operations.