936 resultados para construction techniques


Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document provides an overview of the differences and similarities in the objectives and implementation frameworks of the training and employment policies applying to public construction projects in Western Australia and Queensland. The material in the document clearly demonstrates the extent to which approaches to the pursuit of training objectives in particular have been informed by the experiences of other jurisdictions. The two State governments now have very similar approaches to the promotion of training with the WA government basing a good part of its policy approach on the “Queensland model”. As the two States share many similar economic and other characteristics, and have very similar social and economic goals, this similarity is to be expected. The capacity to benefit from the experiences of other jurisdictions is to be welcomed. The similarity in policy approach also suggests a potential for ongoing collaborations between the State governments on research aimed at further improving training and employment outcomes via public construction projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction sector application of Lead Indicators generally and Positive Performance Indicators (PPIs) particularly, are largely seen by the sector as not providing generalizable indicators of safety effectiveness. Similarly, safety culture is often cited as an essential factor in improving safety performance, yet there is no known reliable way of measuring safety culture. This paper proposes that the accurate measurement of safety effectiveness and safety culture is a requirement for assessing safe behaviours, safety knowledge, effective communication and safety performance. Currently there are no standard national or international safety effectiveness indicators (SEIs) that are accepted by the construction industry. The challenge is that quantitative survey instruments developed for measuring safety culture and/ or safety climate are inherently flawed methodologically and do not produce reliable and representative data concerning attitudes to safety. Measures that combine quantitative and qualitative components are needed to provide a clear utility for safety effectiveness indicators.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document provides the findings of an international review of investment decision-making practices in road asset management. Efforts were concentrated on identifying the strategic objectives of agencies in road asset management, establishing and understanding criteria different organisations adopted and ascertaining the exact methodologies used by different countries and international organisations. Road assets are powerful drivers of economic development and social equity. They also have significant impacts on the natural and man-made environment. The traditional definition of asset management is “A systematic process of maintaining, upgrading and operating physical assets cost effectively. It combines engineering principles with sound business practices and economic theory and it provides tools to facilitate a more organised, logical approach to decision-making” (US Dept. of Transportation, 1999). In recent years, the concept has been broadened to cover the complexity of decision making, based on a wider variety of policy considerations as well as social and environmental issues rather than is covered by Benefit-Cost analysis and pure technical considerations. Current international practices are summarised in table 2. It was evident that Engineering-economic analysis methods are well advanced to support decision-making. A range of tools available supports performance predicting of road assets and associated cost/benefit in technical context. The need for considering triple plus one bottom line of social, environmental and economic as well as political factors in decision-making is well understood by road agencies around the world. The techniques used to incorporate these however, are limited. Most countries adopt a scoring method, a goal achievement matrix or information collected from surveys. The greater uncertainty associated with these non-quantitative factors has generally not been taken into consideration. There is a gap between the capacities of the decision-making support systems and the requirements from decision-makers to make more rational and transparent decisions. The challenges faced in developing an integrated decision making framework are both procedural and conceptual. In operational terms, the framework should be easy to be understood and employed. In philosophical terms, the framework should be able to deal with challenging issues, such as uncertainty, time frame, network effects, model changes, while integrating cost and non-cost values into the evaluation. The choice of evaluation techniques depends on the feature of the problem at hand, on the aims of the analysis, and on the underlying information base At different management levels, the complexity in considering social, environmental, economic and political factor in decision-making is different. At higher the strategic planning level, more non-cost factors are involved. The complexity also varies based on the scope of the investment proposals. Road agencies traditionally place less emphasis on evaluation of maintenance works. In some cases, social equity, safety, environmental issues have been used in maintenance project selection. However, there is not a common base for the applications.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Risks and uncertainties are inevitable in engineering projects and infrastructure investments. Decisions about investment in infrastructure such as for maintenance, rehabilitation and construction works can pose risks, and may generate significant impacts on social, cultural, environmental and other related issues. This report presents the results of a literature review of current practice in identifying, quantifying and managing risks and predicting impacts as part of the planning and assessment process for infrastructure investment proposals. In assessing proposals for investment in infrastructure, it is necessary to consider social, cultural and environmental risks and impacts to the overall community, as well as financial risks to the investor. The report defines and explains the concept of risk and uncertainty, and describes the three main methodology approaches to the analysis of risk and uncertainty in investment planning for infrastructure, viz examining a range of scenarios or options, sensitivity analysis, and a statistical probability approach, listed here in order of increasing merit and complexity. Forecasts of costs, benefits and community impacts of infrastructure are recognised as central aspects of developing and assessing investment proposals. Increasingly complex modelling techniques are being used for investment evaluation. The literature review identified forecasting errors as the major cause of risk. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. For risks that cannot be readily quantified, assessment techniques commonly include classification or rating systems for likelihood and consequence. The report outlines the system used by the Australian Defence Organisation and in the Australian Standard on risk management. After each risk is identified and quantified or rated, consideration can be given to reducing the risk, and managing any remaining risk as part of the scope of the project. The literature review identified use of risk mapping techniques by a North American chemical company and by the Australian Defence Organisation. This literature review has enabled a risk assessment strategy to be developed, and will underpin an examination of the feasibility of developing a risk assessment capability using a probability approach.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report fully summarises a project designed to enhance commercial real estate performance within both operational and investment contexts through the development of a model aimed at supporting improved decision-making. The model is based on a risk adjusted discounted cash flow, providing a valuable toolkit for building managers, owners, and potential investors for evaluating individual building performance in terms of financial, social and environmental criteria over the complete life-cycle of the asset. The ‘triple bottom line’ approach to the evaluation of commercial property has much significance for the administrators of public property portfolios in particular. It also has applications more generally for the wider real estate industry given that the advent of ‘green’ construction requires new methods for evaluating both new and existing building stocks. The research is unique in that it focuses on the accuracy of the input variables required for the model. These key variables were largely determined by market-based research and an extensive literature review, and have been fine-tuned with extensive testing. In essence, the project has considered probability-based risk analysis techniques that required market-based assessment. The projections listed in the partner engineers’ building audit reports of the four case study buildings were fed into the property evaluation model developed by the research team. The results are strongly consistent with previously existing, less robust evaluation techniques. And importantly, this model pioneers an approach for taking full account of the triple bottom line, establishing a benchmark for related research to follow. The project’s industry partners expressed a high degree of satisfaction with the project outcomes at a recent demonstration seminar. The project in its existing form has not been geared towards commercial applications but it is anticipated that QDPW and other industry partners will benefit greatly by using this tool for the performance evaluation of property assets. The project met the objectives of the original proposal as well as all the specified milestones. The project has been completed within budget and on time. This research project has achieved the objective by establishing research foci on the model structure, the key input variable identification, the drivers of the relevant property markets, the determinants of the key variables (Research Engine no.1), the examination of risk measurement, the incorporation of risk simulation exercises (Research Engine no.2), the importance of both environmental and social factors and, finally the impact of the triple bottom line measures on the asset (Research Engine no. 3).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report is an attempt to present the current state of product and process modelling in the building industry in general, and in construction planning and scheduling in particular. This report endeavours to describe what has been achieved by the Construction Planning Workbench (CPW) project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report reviews the most recent literature on construction innovation with the aim of highlighting the primary influences on innovation in the building and construction industry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In construction, inter-organisational relationships are of the highest importance. Ethical practice and behaviour is a means for improving inter-organisational relationships by providing a clear understanding of the rights and obligations of all parties, improving productivity, affecting long-term business dealings, and influencing quality, time and costs. Therefore, the ability to build sustainable relationships grounded in ethical practice is important to the construction industry. Establishing ethical standards at the beginning of the procurement process provides an ethical platform for the project life cycle and the relationship between procurers and contractors. Therefore it is important to determine what the ethical issues are in the Australian construction industry from members of the industry themselves; including clients. This “bottom up” approach is not a particularly new concept. Ever since the Gyles Royal Commission in 1992 there has been a considerable effort by government agencies to develop policies to improve the ethical behaviour of the industry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report draws together the key findings from six case studies on the subject of ebusiness Adoption in Construction conducted in Australia by the University of Newcastle (UON) and Royal Melbourne Institute of Technology (RMIT) from 2005 through to mid-2006 under the auspices of the Cooperative Research Centre for Construction Innovation (CRC_CI). Reference to this timing is important because one of the key themes to emerge from the study is that the take-up of e-business is a dynamic phenomenon within the construction industry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The adoption of e-business by the Australian construction industry lags other service and product industries. It is assumed that slow adoption rate does not reflect the maturity of the technology but is due to adoption impediments peculiar to the nature of construction. This chapter examines impediments to the uptake of e-business nationally and internationally. A systematic and extensive literature search of impediments (also referred to as obstacles, impediments or hindrances) to adoption has been undertaken and the findings discussed in this chapter. This review included more that 200 documents and these have been published in a searchable database as part of a larger research initiative funded by the Cooperative Research Centre for Construction Innovation. The influence of levels of e-business maturity seen in other sectors such as retail, tourism and manufacturing was also captured and a number of major impediments were identified some including: privacy, trust, uncertainty of financial returns, lack of reliable measurement, fraud, lack of support and system maintenance. A total of 23 impediments were assessed in terms of impact to organisational type and size across reviewed documents. With this information it was possible to develop a reference framework for measuring maturity levels and readiness to uptake e-business in construction. Results have also shown that impediments to e-business adoption work differently according to organisational type and culture. Areas of training and people development need to be addressed. This would include a more sensitive approach to the nature of construction organisations, especially to those small and medium enterprises. Raising levels of awareness and creating trust for on-line collaboration are other aspects that need attention, which current studies confirm as lacking. An empirical study within construction, to validate these findings, forms the subsequent phase of this research.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Trying to innovate or wanting to? Making a start is the most difficult step on any journey. Whether trying to innovate for the first time, or seeking improvements on current performance, organisations are confronted with a plethora of options. Innovate now! makes action easier by presenting some of the key considerations for improving innovation performance. This guide has been based on the outcomes of a survey and case studies conducted between 2003 and 2005 in the Australian property and construction industry and therefore contains unique and up-to-date information, examples and suggestions tailored specifically to your industry needs. The large-scale industry survey and 12 innovation case studies on which this guide are based were carried out by The BRITE (Building Research, Innovation, Technology and Environment) Project as part of research for the Cooperative Research Centre for Construction Innovation. The stakeholders volunteering to take part in BRITE research included over 400 businesses, 14 government organisations, 8 industry associations and 4 universities.