855 resultados para building and construction
Resumo:
The state of health and safety on construction sites in Ghana was investigated using first hand observation of fourteen (14) construction project sites in 2009 and 2010. At each site, the construction project, workers and the physical environment of the site were inspected and evaluated against health and safety indicators taken from the literature. The results reveal a poor state of health and safety on Ghanaian construction sites. The primary reasons are a lack of strong institutional framework for governing construction activities and poor enforcement of health and safety policies and procedures. Also, Ghanaian society does not place a high premium on health and safety of construction workers on site. Interviews with workers indicated that injuries and accidents are common on sites. However, compensation for injury is often at the discretion of the contractor although collective bargaining agreements between Labour unions and employers prescribe obligations for the contractor in the event of injury to a worker.
Resumo:
As the building industry proceeds in the direction of low impact buildings, research attention is being drawn towards the reduction of carbon dioxide emission and waste. Starting from design and construction to operation and demolition, various building materials are used throughout the whole building lifecycle involving significant energy consumption and waste generation. Building Information Modelling (BIM) is emerging as a tool that can support holistic design-decision making for reducing embodied carbon and waste production in the building lifecycle. This study aims to establish a framework for assessing embodied carbon and waste underpinned by BIM technology. On the basis of current research review, the framework is considered to include functional modules for embodied carbon computation. There are a module for waste estimation, a knowledge-base of construction and demolition methods, a repository of building components information, and an inventory of construction materials’ energy and carbon. Through both static 3D model visualisation and dynamic modelling supported by the framework, embodied energy (carbon), waste and associated costs can be analysed in the boundary of cradle-to-gate, construction, operation, and demolition. The proposed holistic modelling framework provides a possibility to analyse embodied carbon and waste from different building lifecycle perspectives including associated costs. It brings together existing segmented embodied carbon and waste estimation into a unified model, so that interactions between various parameters through the different building lifecycle phases can be better understood. Thus, it can improve design-decision support for optimal low impact building development. The applicability of this framework is anticipated being developed and tested on industrial projects in the near future.
Resumo:
Virtual reality has the potential to improve visualisation of building design and construction, but its implementation in the industry has yet to reach maturity. Present day translation of building data to virtual reality is often unidirectional and unsatisfactory. Three different approaches to the creation of models are identified and described in this paper. Consideration is given to the potential of both advances in computer-aided design and the emerging standards for data exchange to facilitate an integrated use of virtual reality. Commonalities and differences between computer-aided design and virtual reality packages are reviewed, and trials of current system, are described. The trials have been conducted to explore the technical issues related to the integrated use of CAD and virtual environments within the house building sector of the construction industry and to investigate the practical use of the new technology.
Resumo:
Forests are a store of carbon and an eco-system that continually removes carbon dioxide from the atmosphere. If they are sustainably managed, the carbon store can be maintained at a constant level, while the trees removed and converted to timber products can form an additional long term carbon store. The total carbon store in the forest and associated ‘wood chain’ therefore increases over time, given appropriate management. This increasing carbon store can be further enhanced with afforestation. The UK’s forest area has increased continually since the early 1900s, although the rate of increase has declined since its peak in the late 1980s, and it is a similar picture in the rest of Europe. The increased sustainable use of timber in construction is a key market incentive for afforestation, which can make a significant contribution to reducing carbon emissions. The case study presented in this paper demonstrates the carbon benefits of a Cross Laminated Timber (CLT) solution for a multi-storey residential building in comparison with a more conventional reinforced concrete solution. The embodied carbon of the building up to completion of construction is considered, together with the stored carbon during the life of the building and the impact of different end of life scenarios. The results of the study show that the total stored carbon in the CLT structural frame is 1215tCO2 (30tCO2 per housing unit). The choice of treatment at end of life has a significant effect on the whole life embodied carbon of the CLT frame, which ranges from -1017 tCO2e for re-use to +153tCO2e for incinerate without energy recovery. All end of life scenarios considered result in lower total CO2e emissions for the CLT frame building compared with the reinforced concrete frame solution.
Resumo:
Environmental building assessment tools have been developed to measure how well or poorly a building is performing, or likely to perform, against a declared set of criteria, or environmental considerations, in order to achieve sustainability principles. Knowledge of environmental building assessment tools is therefore important for successful design and construction of environmentally friendly buildings for countries. The purpose of the research is to investigate the knowledge and level of awareness of environmental building assessment tools among industry practitioners in Botswana. One hundred and seven paper-based questionnaires were delivered to industry practitioners, including architects, engineers, quantity surveyors, real estate developers and academics. Users were asked what they know about building assessment, whether they have used any building assessment tool in the past, and what they perceive as possible barriers to the implementation of environmental building assessment tools in Botswana. Sixty five were returned and statistical analysis, using IBM SPSS V19 software, was used for analysis. Almost 85 per cent of respondents indicate that they are extremely or moderately aware of environmental design. Furthermore, the results indicate that 32 per cent of respondents have gone through formal training, which suggests ‘reasonable knowledge’. This however does not correspond with the use of the tools on the ground as 69 per cent of practitioners report never to have used any environmental building assessment tool in any project. The study highlights the need to develop an assessment tool for Botswana to enhance knowledge and further improve the level of awareness of environmental issues relating to building design and construction.
Resumo:
Current approaches for the reduction of carbon emissions in buildings are often predicated on the integration of renewable technologies into building projects. Building integrated photovoltaics (BIPV) is one of these technologies and brings its own set of challenges and problems with a resulting mutual articulation of this technology and the building. A Social Construction of Technology (SCOT) approach explores how negotiations between informal groups of project actors with shared interests shape the ongoing specification of both BIPV and the building. Six main groups with different interests were found to be involved in the introduction of BIPV (Cost Watchers, Design Aesthetes, Green Guardians, Design Optimizers, Generation Maximizers and Users). Their involvement around three sets of issues (design changes from lack of familiarity with the technology, misunderstandings from unfamiliar interdependencies of trades and the effects of standard firm procedure) is followed. Findings underline how BIPV requires a level of integration that typically spans different work packages and how standard contractual structures inhibit the smooth incorporation of BIPV. Successful implementation is marked by ongoing (re-)design of both the building and the technology as informal fluid groups of project actors with shared interests address the succession of problems which arise in the process of implementation.
Resumo:
Innovative, low carbon technologies are already available for use in the construction of buildings, but the impact of their specification on construction projects is unclear. This exploratory research identifies issues which arise following the specification of BIPV in non-residential construction projects. Rather than treating the inclusion of a new technology as a technical problem, the research explores the issue from a socio-technical perspective to understand the accommodations which the project team makes and their effect on the building and the technology. The paper is part of a larger research project which uses a Social Construction of Technology Approach (SCOT) to explore the accommodations made to working practices and design when Building Integrated PhotoVoltaic (BIPV) technology is introduced. The approach explores how the requirements of the technology from different groups of actors (Relevant Social Groups or RSG's) give rise to problems and create solutions. As such it rejects the notion of a rational linear view of innovation diffusion; instead it suggests that the variety and composition of the Relevant Social Groups set the agenda for problem solving and solutions as the project progresses. The research explores the experiences of three people who have extensive histories of involvement with BIPV in construction, looks at how SCOT can inform our understanding of the issues involved and identifies themes and issues in the specification of BIPV on construction projects. A key finding concerns the alignment of inflection points at which interviewees have found themselves changing from one RSG to another as new problems and solutions are identified. The points at which they change RSG often occurred at points which mirror conventional construction categories (in terms of project specification, tender, design and construction).
Resumo:
Objetivo:Este estudo teve como objetivo construir e validar um instrumento de avaliação da compreensão de leitura a fim de caracterizar o perfil de leitura e detectar dificuldades de compreensão em escolares do terceiro ao quinto ano do Ensino Fundamental.Métodos:Participaram 378 escolares divididos em trés grupos para avaliação da compreensão de proposições literais e inferenciais de micro e macroestruturas de dois textos expositivos e dois textos narrativos por meio de questões de múltipla escolha.Resultados:Os dados analisados estatisticamente indicaram valores do teste alfa de Cronbach apresentando consisténcia interna nos quatros textos aplicados para os trés grupos.Conclusão:Foi possível constatar que os escolares apresentaram menor número de erros com o aumento da escolarização e que cada tipo de texto apresentou uma dificuldade específica para os escolares.
Resumo:
In the last decades, the building materials and construction industry has been contributing to a great extent to generate a high impact on our environment. As it has been considered one of the key areas in which to operate to significantly reduce our footprint on environment, there has been widespread belief that particular attention now has to be paid and specific measures have to be taken to limit the use of non-renewable resources.The aim of this thesis is therefore to study and evaluate sustainable alternatives to commonly used building materials, mainly based on ordinary Portland Cement, and find a supportable path to reduce CO2 emissions and promote the re-use of waste materials. More specifically, this research explores different solutions for replacing cementitious binders in distinct application fields, particularly where special and more restricting requirements are needed, such as restoration and conservation of architectural heritage. Emphasis was thus placed on aspects and implications more closely related to the concept of non-invasivity and environmental sustainability. A first part of the research was addressed to the study and development of sustainable inorganic matrices, based on lime putty, for the pre-impregnation and on-site binding of continuous carbon fiber fabrics for structural rehabilitation and heritage restoration. Moreover, with the aim to further limit the exploitation of non-renewable resources, the synthesis of chemically activated silico-aluminate materials, as metakaolin, ladle slag or fly ash, was thus successfully achieved. New sustainable binders were hence proposed as novel building materials, suitable to be used as primary component for construction and repair mortars, as bulk materials in high-temperature applications or as matrices for high-toughness fiber reinforced composites.
Resumo:
Highway infrastructure plays a significant role in society. The building and upkeep of America’s highways provide society the necessary means of transportation for goods and services needed to develop as a nation. However, as a result of economic and social development, vast amounts of greenhouse gas emissions (GHG) are emitted into the atmosphere contributing to global climate change. In recognizing this, future policies may mandate the monitoring of GHG emissions from public agencies and private industries in order to reduce the effects of global climate change. To effectively reduce these emissions, there must be methods that agencies can use to quantify the GHG emissions associated with constructing and maintaining the nation’s highway infrastructure. Current methods for assessing the impacts of highway infrastructure include methodologies that look at the economic impacts (costs) of constructing and maintaining highway infrastructure over its life cycle. This is known as Life Cycle Cost Analysis (LCCA). With the recognition of global climate change, transportation agencies and contractors are also investigating the environmental impacts that are associated with highway infrastructure construction and rehabilitation. A common tool in doing so is the use of Life Cycle Assessment (LCA). Traditionally, LCA is used to assess the environmental impacts of products or processes. LCA is an emerging concept in highway infrastructure assessment and is now being implemented and applied to transportation systems. This research focuses on life cycle GHG emissions associated with the construction and rehabilitation of highway infrastructure using a LCA approach. Life cycle phases of the highway section include; the material acquisition and extraction, construction and rehabilitation, and service phases. Departing from traditional approaches that tend to use LCA as a way to compare alternative pavement materials or designs based on estimated inventories, this research proposes a shift to a context sensitive process-based approach that uses actual observed construction and performance data to calculate greenhouse gas emissions associated with highway construction and rehabilitation. The goal is to support strategies that reduce long-term environmental impacts. Ultimately, this thesis outlines techniques that can be used to assess GHG emissions associated with construction and rehabilitation operations to support the overall pavement LCA.
Resumo:
Desde los años 60, crece en Europa y Estados Unidos la preocupación y la necesidad de mejorar los procesos de gerencia de los proyectos de construcción al volverse estos más complejos. Esto ha llevado a la continua aparición de nuevos profesionales desde la fecha citada hasta nuestros días. De ahí la complejidad de conocer las cualidades de cada uno de ellos, así como las funciones a realizar o la formación que deben tener para poder desarrollar el puesto de trabajo según el papel que desempeñan para cada actividad. Muchos agentes son los que pueden intervenir en la edificación, muchas son las funciones que llevan a cabo estos agentes, muchas son las habilidades que se necesitan para realizar estas misiones, y una buena gestión de la edificación es la que hay que desarrollar para lograr el gran éxito. El presente trabajo fin de máster, dirigido a arquitectos, arquitectos técnicos, ingenieros, abogados, economistas y todos los profesionales del sector inmobiliario y de la construcción, trata de resolver todas aquellas dudas sobre los diferentes sujetos que estarán presentes desde la definición del proyecto en la fase inicial hasta el final de la obra, pasando por las fases de pre-construcción, construcción y post-construcción. (ENGLISH VERSION) Since the 1960s, most construction projects have become more and more complex, and new concerns and necessities related to the management of a project have been on the rise in Europe and in the United States. Thence, the need for more specialized professionals in the field has become a common fact, as well as the inclusion of new curricular subjects in most building engineering studies. There are different agents that play a relevant role in a building project; some of them are expected to perform a highly specialized set of functions that require specific management skills for the work to be successful. This research work—aimed mainly at engineers, quantity surveyors, lawyers, economists, real estate and construction professionals—shows the major implications of the building construction process including both pre-tender/construction and post-tender/construction stages as far as the main expert agents are involved.
Resumo:
Crossed-arch vaults are a particular type of ribbed vaults. Their main feature is that the ribs that form the vault are intertwined, forming polygons or stars and leaving an empty space in the middle. The firsts appear in Córdoba in the second half of the 10th Century. Afterwards, the type diffused through Spain and North Africa, 11th_13th Centuries. These vaults reappear in Armenia in the 13th Century. In the 14th and 15th Century a few examples are found both in England (Durham, Raby) and Central Europe (Prague, Landshut, Vienna). At about the same time, Leonardo da Vinci produced designs for the Tiburio (Ciborium) of Milan cathedral with a cross-arched structure and proposed tests to assess the strength; he also, made use of the same pattern of vault for Renaissance centralized churches. Eventually, the type can be tracked through the 17th (Guarini) and 18th (Vittone) Centuries, until Spanish post war architecture in the 1940-60s (Moya). Some questions arose, which so far, have not been answered. How was it possible that a particular type of vault had such enormous geographical spread? How was it transmitted from Córdoba to the Caucasus? The matter is one of transfer of knowledge, ideas, and technology; it relates both aesthetics and construction.
Resumo:
The literature states that project duration is affected by various scope factors. Using 168 building projects carried out in Spain, this paper uses the multiple regression analysis to develop a forecast model that allows estimating project duration of new builds. The proposed model uses project type, gross floor area (GFA), the cost/GFA relationship and number of floors as predictor variables. The research identified the logarithmic form of construction speed as the most appropriate response variable. GFA has greater influence than cost on project duration but both factors are necessary to achieve a forecast model with the highest accuracy. We developed an analysis to verify the stability of forecasted values and showed how a model with high values of fit and accuracy may display an anomalous behavior in the forecasted values. The sensitivity of the proposed forecast model was also analyzed versus the variability of construction costs.
Resumo:
The subject of Construction of Structures I studies, from a constructive point of view and taking into account current legislation, reinforced concrete structures used in buildings, through the acquisition of knowledge and construction criteria required in the profession of a Technical Architect. The contents acquired in this course are essential for further professional development of technicians and are closely related to many of the subjects taught in the same or other courses of the Degree in Technical Architecture at the University of Alicante. The aim of this paper is to present, analyze and discuss the development of a new methodology proposed in the mentioned subject, as it supposed an important change in the traditional way of teaching Construction and Structures I. In order to incorporate new teaching tools in 2013-2014, the course has been implemented by using a Moodle software tool to promote blended learning with online exercises. Our Moodle community allows collaborative work within an open-source platform where teachers and students share a new and personalized learning environment. Students are easily used to the interface and the platform, value the constant connection with teachers or other fellows and completely agree with the possibility of making questions or share documents 24 hours a day. The proposed methodology consists of lectures and practical classes. In the lectures, the basics of each topic are discussed; class attendance, daily study and conducting scheduled exercises are indispensable. Practical classes allow to consolidate the knowledge gained in theory classes by solving professional exercises and actual construction problems related to structures, that shall be compulsorily delivered online. So, after the correction of the teacher and the subsequent feedback of students, practical exercises ensure lifelong learning of the student, who can download any kind of material at any time (constructive details, practical exercises and even corrected exams). Regarding the general evaluation system, goals achievement is assessed on an ongoing basis (65% of the final mark) along the course through written and graphic evidences in person and online, as well as a individual development of a workbook. In all cases, the acquisition of skills, the ability to synthesize, the capacity of logical and critical thinking are assessed. The other 35 % of the mark is evaluated by a complementary graphic exam. Participation in the computing platform is essential and the student is required to do and present, at least 90% of the practices proposed. Those who do not comply with the practices in each specific date could not be assessed continuously and may only choose the final exam. In conclusion, the subject of Construction of Structures I is essential in the development of the regulated profession of Technical Architect as they are considered, among other professional profiles, as specialists in construction of building structures. The use of a new communication platform and online teaching allows the acquisition of knowledge and constructive approaches in a continuous way, with a more direct and personal monitoring by the teacher that has been highly appreciated by almost 100% of the students. Ultimately, it is important to say that the use of Moodle in this subject is a very interesting tool, which was really well welcome by students in one of the densest and important subjects of the Degree of Technical Architecture.