955 resultados para access control
Resumo:
Several European telecommunications regulatory agencies have recently introduced a fixed capacity charge (flat rate) to regulate access to the incumbent's network. The purpose of this paper is to show that the optimal capacity charge and the optimal access-minute charge analysed by Armstrong, Doyle, and Vickers (1996) have a similar structure and imply the same payment for the entrant. I extend the analysis tothe case where there is a competitor with market power. In this case, the optimalcapacity charge should be modified to avoid that the entrant cream-skims the market,fixing a longer or a shorter peak period than the optimal. Finally, I consider a multiproduct setting, where the effect of the product differentiation is exacerbated.
Resumo:
Public travel by motor vehicles is often necessary in road and street sections that have been officially closed for construction, repair, and/or other reasons. This authorization is permitted in order to provide access to homes and businesses located beyond the point of closure. The MUTCD does address appropriate use of specific regulatory signs at the entrance to closed sections; however, direct guidance for temporary traffic control measures within these areas is not included but may be needed. Interpretation and enforcement of common practices may vary among transportation agencies. For example, some law enforcement officers in Iowa have indicated a concern regarding enforcement and jurisdiction of traffic laws in these areas because the Code of Iowa only appears to address violations on roadways open to “public travel.” Enforcement of traffic laws in closed road sections is desirable to maintain safety for workers and for specifically authorized road users. In addition, occasional unauthorized entry by motor vehicles is experienced in closed road areas causing property damage. Citations beyond simple trespass may be advisable to provide better security for construction sites, reduce economic losses from damage to completed work, and create safer work zones.
Resumo:
The emergence of powerful new technologies, the existence of large quantities of data, and increasing demands for the extraction of added value from these technologies and data have created a number of significant challenges for those charged with both corporate and information technology management. The possibilities are great, the expectations high, and the risks significant. Organisations seeking to employ cloud technologies and exploit the value of the data to which they have access, be this in the form of "Big Data" available from different external sources or data held within the organisation, in structured or unstructured formats, need to understand the risks involved in such activities. Data owners have responsibilities towards the subjects of the data and must also, frequently, demonstrate that they are in compliance with current standards, laws and regulations. This thesis sets out to explore the nature of the technologies that organisations might utilise, identify the most pertinent constraints and risks, and propose a framework for the management of data from discovery to external hosting that will allow the most significant risks to be managed through the definition, implementation, and performance of appropriate internal control activities.
Resumo:
Selostus: Ilmaston lämpenemisen vaikutus perunaruttoon
Resumo:
This law is intended to reduce the number of hazardous methamphetamine labs in Iowa, by controlling meth cooks’ access to the key meth-making ingredient: pseudoephedrine. In 2004, Iowa law enforcement agencies responded to a record 1,472 meth lab incidents. Below, please find links to: Senate File 169 (Iowa’s pseudoephedrine control law); an Iowa meth fact sheet; a brief overview of the law; and general compliance guidelines for consumers, pharmacies, retailers and law enforcement. Most provisions of this law, pertaining to pseudoephedrine sales, are effective May 21, 2005. However, two other provisions were effective immediately—March 22, 2005—upon the Governor’s signing of this measure into law: (1) removal of exceptions on the Schedule V Controlled Substance status for ephedrine [all ephedrine products now may only be sold in licensed pharmacies…no retail sales of ephedrine permitted]; and (2) addition of a requirement that bailable defendants charged with manufacture, delivery, possession with the intent to deliver, or distribution of methamphetamine, shall, in addition to a substance abuse evaluation, remain under supervision and be required to undergo random drug tests as a condition of release.
Resumo:
This thesis examines how oversight bodies, as part of an ATI policy, contribute to the achievement of the policy's objectives. The aim of the thesis is to see how oversight bodies and the work they do affects the implementation of their respective ATI policies and thereby contributes to the objectives of those policies using a comparative case study approach. The thesis investigates how federal/central government level information commissioners in four jurisdictions - Germany, India, Scotland, and Switzerland - enforce their respective ATI policies, which tasks they carry out in addition to their enforcement duties, the challenges they face in their work and the ways they overcome these. Qualitative data were gathered from primary and secondary documents as well as in 37 semi-structured interviews with staff of the commissioners' offices, administrative officials whose job entails complying with ATI, people who have made ATI requests and appealed to their respective oversight body, and external experts who have studied ATI implementation in their particular jurisdiction. The thesis finds that while the aspect of an oversight body's formal independence that has the greatest impact on its work is resource control and that although the powers granted by law set the framework for ensuring that the administration is properly complying with the policy, the commissioner's leadership style - a component of informal independence - has more influence than formal attributes of independence in setting out how resources are obtained and used as well as how staff set priorities and utilize the powers they are granted by law. The conclusion, therefore, is that an ATI oversight body's ability to contribute to the achievement of the policy's objectives is a function of three main factors: a. commissioner's leadership style; b. adequacy of resources and degree of control the organization has over them; c. powers and the exercise of discretion in using them. In effect, the thesis argues that it is difficult to pinpoint the value of the formal powers set out for the oversight body in the ATI law, and that their decisions on whether and how to use them are more important than the presumed strength of the powers. It also claims that the choices made by the commissioners and their staff regarding priorities and use of powers are determined to a large extent by the adequacy of resources and the degree of control the organization has over those resources. In turn, how the head of the organization leads and manages the oversight body is crucial to both the adequacy of the organization's resources and the decisions made about the use of powers. Together, these three factors have a significant impact on the body's effectiveness in contributing to ATI objectives.
Resumo:
Several European telecommunications regulatory agencies have recently introduced a fixed capacity charge (flat rate) to regulate access to the incumbent's network. The purpose of this paper is to show that the optimal capacity charge and the optimal access-minute charge analysed by Armstrong, Doyle, and Vickers (1996) have a similar structure and imply the same payment for the entrant. I extend the analysis tothe case where there is a competitor with market power. In this case, the optimalcapacity charge should be modified to avoid that the entrant cream-skims the market,fixing a longer or a shorter peak period than the optimal. Finally, I consider a multiproduct setting, where the effect of the product differentiation is exacerbated.
Resumo:
Introduction & Objectives: Surgery remains the treatment of choice for localized renal cell neoplasia. While radical nephrectomy was long considered as gold standard, partial nephrectomy (PN) has widened its indications over the past twodecades and has shown oncological results equivalent to radical nephrectomy for small tumors. Moreover, it is considered superior to radical nephrectomy in terms of non-cancer related mortality. The role of negative surgical margin has been widely debated. Intraoperative frozen section analysis has been shown to be unreliable, expensive, time-consuming and not well correlated to final pathology. The goal of the present study was to assess the correlation of intraoperative exvivo ultrasonographic (US) evaluation of resection margin to definitive pathology in patients undergoing PN.Materials & Methods: An observational study was carried out in ours 2 institutions from February 2008 to October 2010. Patients undergoing PN for T1-T2 renal tumors were included. Ex vivo US evaluation was performed. Considering availability of US engine, not all consecutive eligible patients were included. PN was undertaken either by open surgery or laparoscopic access in a standardized technique. The "minimal healthy tissue margin" technique was applied. Once resected, the specimen was kept in a saline solution and US determination of tumor margins was performed. Sequential images were captured in order to evaluate the whole capsule.Results: Twenty-two patients (9 women, age 63±11 years[46-78]) were included in the present analysis. Open or laparoscopic PN was performed in 19 and 3 patients, respectively. Intraoperative ex-vivo US showed negative surgical margin in all cases except one, needing a complementary renal parenchyma resection. US duration ranged from 1 to 4 minutes, with a median time of 1 minute. Definitive histological analysis confirmed the presence of 3 angiomyolipoma, 15 clear cell carcinoma (11 pT1a,3 pT1b,1 pT2), 3 chromophobe carcinoma (1 pT1a,1 pT1b,1 pT2) and 1 pT1a type II papillary tumor. Mean tumor size was 3,4±2.1 cm [0,6-7,2]. Final pathology revealed R0 margins in all cases.Conclusions: Intraoperative ex-vivo US evaluation of resection margin in patients undergoing PN is feasible, time-efficient, well correlated to definitive pathological examination, and should be evaluated in further prospective trials.
Resumo:
Selostus: Kolme viljojen mekaanista rikkakasvintorjuntamentelmää
Resumo:
The current shortage of highway funds precludes the immediate replacement of most of the bridges that have been evaluated as structurally deficient or functionally obsolete or both. A low water stream crossing (LWSC) affords an economical alternative to the replacement of a bridge with another bridge in many instances. However, the potential liability that might be incurred from the use of LWSCs has served as a deterrent to their use. Nor have guidelines for traffic control devices been developed for specific application to LWSCs. This research addressed the problems of liability and traffic control associated with the use of LWSCs. Input to the findings from this research was provided by several persons contacted by telephone plus 189 persons who responded to a questionnaire concerning their experience with LWSCs. It was concluded from this research that a significant potential for accidents and liability claims could result from the use of LWSCs. However, it was also concluded that this liability could be reduced to within acceptable limits if adequate warning of the presence of an LWSC were afforded to road users. The potential for accidents and liability could further be reduced if vehicular passage over an LWSC were precluded during periods when the road was flooded. Under these conditions, it is believed, the potential for liability from the use of an LWSC on an unpaved, rural road would be even less than that resulting from the continuing use of an inadequate bridge. The signs recommended for use in advance of an LWSC include two warning signs and one regulatory sign with legends as follows: FLOOD AREA AHEAD, IMPASSABLE DURING HIGH WATER, DO NOT ENTER WHEN FLOODED. Use of the regulatory sign would require an appropriate resolution by the Board of Supervisors having responsibility for a county road. Other recommendations include the optional use of either a supple mental distance advisory plate or an advisory speed plate, or both, under circumstances where these may be needed. It was also recommended HR-218 Liability & Traffic Control Considerations for Low Water Stream Crossings that LWSCs be used only on unpaved roads and that they not be used in locations where flooding of an LWSC would deprive dwelling places of emergency ground access.
Resumo:
Selostus: Valuma-aluetason mallisovellus suojakaistojen käytöstä eroosion torjunnassa
Resumo:
Selostus: Monoterpeenit kasvinsuojelussa: erityisesti limoneenin vaikutus eri eliöryhmiin