724 resultados para Traditional projects
Resumo:
Summary of Applications that are awarded projects through the state of Iowa. Produced by Agriculture and Land Stewardship.
Resumo:
Summary of Applications that are awarded projects through the state of Iowa. Produced by Agriculture and Land Stewardship.
Resumo:
Summary of Applications that are awarded projects through the state of Iowa. Produced by Agriculture and Land Stewardship.
Resumo:
Summary of Applications that are awarded projects through the state of Iowa. Produced by Agriculture and Land Stewardship.
Resumo:
Summary of Applications that are awarded projects through the state of Iowa. Produced by Agriculture and Land Stewardship.
Resumo:
This report proposes, that for certain types of highway construction projects undertaken by the Iowa Department of Transportation, a scheduling technique commonly referred to as linear scheduling may be more effective than the Critical Path Method scheduling technique that is currently being used. The types of projects that appear to be good candidates for the technique are those projects that have a strong linear orientation. Like a bar chart, this technique shows when an activity is scheduled to occur and like a CPM schedule it shows the sequence in which activities are expected to occur. During the 1992 construction season, the authors worked with an inlay project on Interstate 29 to demonstrate the linear scheduling technique to the Construction Office. The as-planned schedule was developed from the CPM schedule that the contractor had developed for the project. Therefore, this schedule represents what a linear representation of a CPM schedule would look like, and not necessarily what a true linear schedule would look like if it had been the only scheduling technique applied to the project. There is a need to expand the current repertoire of scheduling techniques to address those projects for which the bar chart and CPM may not be appropriate either because of the lack of control information or due to overly complex process for the actual project characteristics. The scheduling approaches used today on transportation projects have many shortcomings for properly modeling the real world constraints and conditions which are encountered. Linear project's predilection for activities with variable production rates, a concept very difficult to handle with the CPM, is easily handled and visualized with the linear technique. It is recommended that work proceed with the refinement of the method of linear scheduling described above and the development of a microcomputer based system for use by the Iowa Department of Transportation and contractors for its implementation. The system will be designed to provide the information needed to adjust schedules in a rational understandable method for monitoring progress on the projects and alerting Iowa Department of Transportation personnel when the contractor is deviating from the plan.
Resumo:
The Iowa Department of Transportation Office of Research & Analytics has created this Guide to help researchers and contractors of the Iowa DOT attain compliance with Federal and Iowa DOT Public Access Policies for transportation-related research publications and datasets. This guide provides direction for filling out the data management plan template (also attached to this record) that will help satisfy Iowa DOT and U.S. DOT requirements.
Resumo:
At the beginning of the 1990s, the concept of "European integration" could still be said to be fairly unambiguous. Nowadays, it has become plural and complex almost to the point of unintelligibility. This is due, of course, to the internal differentiation of EU membership, with several Member States pulling out of key integrative projects such as establishing an area without frontiers, the "Schengen" area, and a common currency. But this is also due to the differentiated extension of key integrative projects to European non-EU countries - Schengen is again a case in point. Such processes of "integration without membership", the focus of the present publication, are acquiring an ever-growing topicality both in the political arena and in academia. International relations between the EU and its neighbouring countries are crucial for both, and their development through new agreements features prominently on the continent's political agenda. Over and above this aspect, the dissemination of EU values and standards beyond the Union's borders raises a whole host of theoretical and methodological questions, unsettling in some cases traditional conceptions of the autonomy and separation of national legal orders. This publication brings together the papers presented at the Integration without EU Membership workshop held in May 2008 at the EUI (Max Weber Programme and Department of Law). It aims to compare different models and experiences of integration between the EU, on the one hand, and those European countries that do not currently have an accession perspective on the other hand. In delimiting the geographical scope of the inquiry, so as to scale it down to manageable proportions, the guiding principles have been to include both the "Eastern" and "Western" neighbours of the EU, and to examine both structured frameworks of cooperation, such as the European Neighbourhood Policy and the European Economic Area, and bilateral relations developing on a more ad hoc basis. These principles are reflected in the arrangement of the papers, which consider in turn the positions of Ukraine, Russia, Norway, and Switzerland in European integration - current standing, perspectives for evolution, consequences in terms of the EU-ization of their respective legal orders1. These subjects are examined from several perspectives. We had the privilege of receiving contributions from leading practitioners and scholars from the countries concerned, from EU highranking officials, from prominent specialists in EU external relations law, and from young and talented researchers. We wish to thank them all here for their invaluable insights. We are moreover deeply indebted to Marise Cremona (EUI, Law Department, EUI) for her inspiring advice and encouragement, as well as to Ramon Marimon, Karin Tilmans, Lotte Holm, Alyson Price and Susan Garvin (Max Weber Programme, EUI) for their unflinching support throughout this project. A word is perhaps needed on the propriety and usefulness of the research concept embodied in this publication. Does it make sense to compare the integration models and experiences of countries as different as Norway, Russia, Switzerland, and Ukraine? Needless to say, this list of four evokes a staggering diversity of political, social, cultural, and economic conditions, and at least as great a diversity of approaches to European integration. Still, we would argue that such diversity only makes comparisons more meaningful. Indeed, while the particularities and idiosyncratic elements of each "model" of integration are fully displayed in the present volume, common themes and preoccupations run through the pages of every contribution: the difficulty in conceptualizing the finalité and essence of integration, which is evident in the EU today but which is greatly amplified for non-EU countries; the asymmetries and tradeoffs between integration and autonomy that are inherent in any attempt to participate in European integration from outside; the alteration of deeply seated legal concepts, and concepts about the law, that are already observable in the most integrated of the non-EU countries concerned. These issues are not transient or coincidental: they are inextricably bound up with the integration of non-EU countries in the EU project. By publishing this collection, we make no claim to have dealt with them in an exhaustive, still less in a definitive manner. Our ambition is more modest: to highlight the relevance of these themes, to place them more firmly on the scientific agenda, and to provide a stimulating basis for future research and reflection.
Resumo:
Peer-reviewed
Resumo:
Creating and using FLOSS in R+D projects raises several legal issues, which need to be managed as soon as possible - preferably during the project planning stage. Challenges in the areas of project structure and policy, licenses and licensing, exploitation strategies, community management, and FLOSS-friendliness in general all have their legal aspects, which are commented here. Some recommendations are made for assisting in the use of FLOSS in R+D projects, especially in multiple party consortiums.
Resumo:
FOSS packages are becoming ever more present in R&D projects carried out a variety of entities, including large corporations. I will focus on how legal risks associated with the use of FOSS licenses can be assessed and discuss measures directed to risk mitigation.
Resumo:
This is the fourth edition of the Nanosafety Cluster compendium. It documents the status of important projects on nanomaterial toxicity and exposure monitoring, integrated risk management, research infrastructure and coordination and support activities. The compendium is not intended to be a guidance document for human health and environmental safety management of nanotechnologies, as such guidance documents already exist and are widely available. Neither is the compendium intended to be a medium for the publication of scientific papers and research results, as this task is covered by scientific conferences and the peer reviewed press. The compendium aims to bring researchers closer together and show them the potential for synergy in their work. It is a means to establish links and communication between them during the actual research phase and well before the publication of their results. It thus focuses on the communication of projects' strategic aims, extensively covers specific work objectives and the methods used in research, and documents human capacities and available laboratory infrastructure. As such, the compendium supports collaboration on common goals and the joint elaboration of future plans, whilst compromising neither the potential for scientific publication, nor intellectual property rights.
Resumo:
A partir de maig de 2003, per iniciativa del Vicerectorat adjunt d’Edificacions de la UPC, el Centre Interdisciplinari de Tecnologia, Innovació i Educació per a la Sostenibilitat (CITIES) treballa en l’elaboració i la implantació del Pla d’Eficiència en el Consum de Recursos (PECR), amb l’objectiu d’establir polítiques i definir línees d’actuació per a l’estalvi i l’eficiència en el consum dels recursos energètics i d’ aigua en els edificis de la UPC.El PECR contempla, en una de les primeres fases, la realització d’avaluacions energètiques en les edificacions de la UPC per valorar l’estat actual dels edificis i poder establir uns indicadors del seu comportament energètic a partir dels quals establir els objectius d’estalvi i d’eficiència. Per fer aquestes avaluacions, es va crear una línea de projectes finals de carrera (PFC) per a estudiants de l’Escola Politècnica Superior de l’Edificació de Barcelona (EPSEB), sota la coordinació de professors tutors de diferents departaments y amb la col•laboració indispensable de totes les unitats de recolzament de la UPC.Aquesta publicació és la ponència presentada al IV Congrès "Sustainable City", a Tallinn, en el que es va presentar aquest projecte com a una eina de treball amb l'objectiu de reduir l'impacte ambiental dels edificis universitaris en les ciutats.
Resumo:
Under the circumstances of the increasing market pressure, enterprises try to improve their competitive position by development efforts, and a business development project is one tool for that. There are not many answers to the question of how the development projects launched to improve the business performance in SMEs have succeeded. Theacademic interest in the business development project success has mainly focused on projects implemented in larger organisations rather than in SMEs. The previous studies on the business success of SMEs have mainly focused on new business ventures rather than on existing SMEs. However, nowadays a large number of business development projects are undertaken in existing SMEs, where they can pose a great challenge. This study focuses on business development success in SMEs thathave already established their business. The objective of the present study is to gain a deep understanding on business development project success in the SME-context and to identify the dimensions and factors affecting the project success. Further, the aim is to clarify how the business development projects implemented in SMEs have affected their performance. The empirical evidence is based on multiple case study. This study builds a framework for a generic theory of business development success in the SME-context, based on literature from the areas ofproject and change management, entrepreneurship and small business management, as well as performance measurement, and on empirical evidence from SMES. The framework consists of five success dimensions: entrepreneurial, project preparation, change management, project management and project success. The framework provides a systematic way for analysing the business development project and its impact on the performance and on the performing company. This case evidence indicates that successful business development projects have a balanced, high performance concerning all the dimensions. Good performance in one dimension is not enoughfor the project success, but it gives a good ground for the other dimensions. The other way round, poor performance in one success dimension affects the others, leading to poor performance of the project. In the SME-context the business development project success seems to be dependent on several interrelated dimensions and factors. Success in one area leads to success in other areas, and so creates an upward success spiral. Failure in one area seems to lead to failure in other areas, creating a downward failure spiral. The study indicates that the internal business development projects have affected the SMEs' performance widely also on areas and functions not initially targeted. The implications cover all thesuccess categories: the project efficiency, the impact on the customer, the business success and the future potentiality. With successful cases, the success tends to spread out to areas and functions not mentioned as the project goals, andwith unsuccessful cases the failure seems to spread out widely to the SMEs' other functions. This study also indicates that the most important key factors for successful business development project implementation are the strength of intention, business ability, knowledge, motivation and participation of the employees, as well as adequate and well-timed training provided to the employees.