808 resultados para Lattice-based construction
Resumo:
The level of insolvencies in the construction industry is high, when compared to other industry sectors. Given the management expertise and experience that is available to the construction industry, it seems strange that, according to the literature, the major causes of failure are lack of financial control and poor management. This indicates that with a good cash flow management, companies could be kept operating and financially healthy. It is possible to prevent failure. Although there are financial models that can be used to predict failure, they are based on company accounts, which have been shown to be an unreliable source of data. There are models available for cash flow management and forecasting and these could be used as a starting point for managers in rethinking their cash flow management practices. The research reported here has reached the stage of formulating researchable questions for an in-depth study including issues such as how contractors manage their cash flow, how payment practices can be managed without damaging others in the supply chain and the relationships between companies" financial structures and the payment regimes to which they are subjected.
Resumo:
In developing techniques for monitoring the costs associated with different procurement routes, the central task is disentangling the various project costs incurred by organizations taking part in construction projects. While all firms are familiar with the need to analyse their own costs, it is unusual to apply the same kind of analysis to projects. The purpose of this research is to examine the claims that new ways of working such as strategic alliancing and partnering bring positive business benefits. This requires that costs associated with marketing, estimating, pricing, negotiation of terms, monitoring of performance and enforcement of contract are collected for a cross-section of projects under differing arrangements, and from those in the supply chain from clients to consultants, contractors, sub-contractors and suppliers. Collaboration with industrial partners forms the basis for developing a research instrument, based on time sheets, which will be relevant for all those taking part in the work. The signs are that costs associated with tendering are highly variable, 1-15%, depending upon what precisely is taken into account. The research to date reveals that there are mechanisms for measuring the costs of transactions and these will generate useful data for subsequent analysis.
Resumo:
Recent developments in contracting practice in the UK have built upon recommendations contained in highprofile reports, such as those by Latham and Egan. However, the New Engineering Contract (NEC), endorsed by Latham, is based upon principles of contract drafting that seem open to question. Any contract operates in the context of its legislative environment and current working practices. This report identifies eight contentious hypotheses in the literature on construction contracts and tests their validity in a sample survey that attracted 190 responses. The survey shows, among other things, that while partnership is a positive and useful idea, authoritative contract management is considered more effective and that “win-win” contracts, while desirable, are basically impractical. Further, precision and fairness in contracts are not easy to achieve simultaneously. While participants should know what is in their contracts, they should not routinely resort to legal action; and standard-form contracts should not seek to be universally applicable. Fundamental changes to drafting policy should be undertaken within the context of current legal contract doctrine and with a sensitivity to the way that contracts are used in contemporary practice. Attitudes to construction contracting may seem to be changing on the surface, but detailed analysis of what lies behind apparent agreement on new ways of working reveals that attitudes are changing much more slowly than they appear to be.
Resumo:
The level of insolvencies in the construction industry is high, when compared to other industry sectors. Given the management expertise and experience that is available to the construction industry, it seems strange that, according to the literature, the major causes of failure are lack of financial control and poor management. This indicates that with a good cash flow management, companies could be kept operating and financially healthy. It is possible to prevent failure. Although there are financial models that can be used to predict failure, they are based on company accounts, which have been shown to be an unreliable source of data. There are models available for cash flow management and forecasting and these could be used as a starting point for managers in rethinking their cash flow management practices. The research reported here has reached the stage of formulating researchable questions for an in-depth study including issues such as how contractors manage their cash flow, how payment practices can be managed without damaging others in the supply chain and the relationships between companies’ financial structures and the payment regimes to which they are subjected.
Resumo:
A new heuristic for the Steiner Minimal Tree problem is presented here. The method described is based on the detection of particular sets of nodes in networks, the “Hot Spot” sets, which are used to obtain better approximations of the optimal solutions. An algorithm is also proposed which is capable of improving the solutions obtained by classical heuristics, by means of a stirring process of the nodes in solution trees. Classical heuristics and an enumerative method are used CIS comparison terms in the experimental analysis which demonstrates the goodness of the heuristic discussed in this paper.
Resumo:
A new heuristic for the Steiner minimal tree problem is presented. The method described is based on the detection of particular sets of nodes in networks, the “hot spot” sets, which are used to obtain better approximations of the optimal solutions. An algorithm is also proposed which is capable of improving the solutions obtained by classical heuristics, by means of a stirring process of the nodes in solution trees. Classical heuristics and an enumerative method are used as comparison terms in the experimental analysis which demonstrates the capability of the heuristic discussed
Resumo:
Construction materials and equipment are essential building blocks of every construction project and may account for 50-60 per cent of the total cost of construction. The rate of their utilization, on the other hand, is the element that most directly relates to a project progress. A growing concern in the industry that inadequate efficiency hinders its success could thus be accommodated by turning construction into a logistic process. Although mostly limited, recent attempts and studies show that Radio Frequency IDentification (RFID) applications have significant potentials in construction. However, the aim of this research is to show that the technology itself should not only be used for automation and tracking to overcome the supply chain complexity but also as a tool to generate, record and exchange process-related knowledge among the supply chain stakeholders. This would enable all involved parties to identify and understand consequences of any forthcoming difficulties and react accordingly before they cause major disruptions in the construction process. In order to achieve this aim the study focuses on a number of methods. First of all it develops a generic understanding of how RFID technology has been used in logistic processes in industrial supply chain management. Secondly, it investigates recent applications of RFID as an information and communication technology support facility in construction logistics for the management of construction supply chain. Based on these the study develops an improved concept of a construction logistics architecture that explicitly relies on integrating RFID with the Global Positioning System (GPS). The developed conceptual model architecture shows that categorisation provided through RFID and traceability as a result of RFID/GPS integration could be used as a tool to identify, record and share potential problems and thus vastly improve knowledge management processes within the entire supply chain. The findings thus clearly show a need for future research in this area.
Resumo:
Generally poor productivity, delays, low profitability and exceeded budgets are Common problems in modern construction management, however it seems that a basic obstacle lies far deeper in the understanding of a firm's fundamental mission, its existence. The main objective of this paper therefore is to examine the operational living of a construction firm and by doing that to reveal the key problem or the solution for a construction firm - its organization. A firm as a social system in which interactions between its constitutive components (employees) are surordinated to its maintenance (keeping a system alive) is an autopoietic social system. Two domains of external perturbations are uncovered to which a construction firm has to adapt (market driven and project driven perturbations). Constructed conceptual model of an autopoietic organization is based upon two necessary and sufficient operational domains that a firm has to create in order to become an autopoietic, adaptive social system. The first one is a domain of interactions between employees and other operationally external systems, which is representing an idea-generating domain of interactions. The second is employee's autonomous operational domain, which embodies employee's autonomy and individuality and represents a necessary condition for the establishment of an idea-generating domain. Finally, it is recognized that interactions within these four domains keep a construction firm alive.
Resumo:
Commitment of employees is relatively low in construction. This problem is exasperated by companies inability to attract, motivate, and retain talent that is then often channelled into other more attractive industrial sectors where the prospects, conditions and rewards are perceived to be much higher. The purpose of this study is thus primarily to develop a generic model to maximise employees' engagement, improve their motivation and increase the retention levels. To achieve this aim, the investigation looks into how perceived employment obligations and expectations impact commitment and through that organisational performance. The study is based on the postulations of Luhmann's theory of social systems with communication viewed as a constitutive element of a social system. Consequently expectations of a particular party in an employment relationship are represented in a communicative space requiring the other party's understanding in order to align expectations of both sides in the relationship. Explicitly, alignment of by an employee perceived manager's expectations determines his/ her commitment to fulfil obligations towards the manager. The result of this first stage of research is a conceptual model developed following the substantial supporting evidence in the literature and it forms the framework for mitigation of low commitment, motivation and retention of employees. The model particularly focuses on factors affecting employees' perceived expectations like reneging, incongruence and the process of communication. In the future the model will be validated using empirical data from a combination of observational and enquiry-based research. Once completed, the model will provide a framework for informing Human Resource Management policies with the aim to improve commitment of employees, increase the levels of retention and consequently improve the performance of construction organisations.
Resumo:
The aim of the study was to establish and verify a predictive vegetation model for plant community distribution in the alti-Mediterranean zone of the Lefka Ori massif, western Crete. Based on previous work three variables were identified as significant determinants of plant community distribution, namely altitude, slope angle and geomorphic landform. The response of four community types against these variables was tested using classification trees analysis in order to model community type occurrence. V-fold cross-validation plots were used to determine the length of the best fitting tree. The final 9node tree selected, classified correctly 92.5% of the samples. The results were used to provide decision rules for the construction of a spatial model for each community type. The model was implemented within a Geographical Information System (GIS) to predict the distribution of each community type in the study site. The evaluation of the model in the field using an error matrix gave an overall accuracy of 71%. The user's accuracy was higher for the Crepis-Cirsium (100%) and Telephium-Herniaria community type (66.7%) and relatively lower for the Peucedanum-Alyssum and Dianthus-Lomelosia community types (63.2% and 62.5%, respectively). Misclassification and field validation points to the need for improved geomorphological mapping and suggests the presence of transitional communities between existing community types.
Resumo:
This chapter introduces ABMs, their construction, and the pros and cons of their use. Although relatively new, agent-basedmodels (ABMs) have great potential for use in ecotoxicological research – their primary advantage being the realistic simulations that can be constructed and particularly their explicit handling of space and time in simulations. Examples are provided of their use in ecotoxicology primarily exemplified by different implementations of the ALMaSS system. These examples presented demonstrate how multiple stressors, landscape structure, details regarding toxicology, animal behavior, and socioeconomic effects can and should be taken into account when constructing simulations for risk assessment. Like ecological systems, in ABMs the behavior at the system level is not simply the mean of the component responses, but the sum of the often nonlinear interactions between components in the system; hence this modeling approach opens the door to implementing and testing much more realistic and holistic ecotoxicological models than are currently used.
Resumo:
Resistant strains of Plasmodium falciparum and the unavailability of useful antimalarial vaccines reinforce the need to develop new efficacious antimalarials. This study details a pharmacophore model that has been used to identify a potent, soluble, orally bioavailable antimalarial bisquinoline, metaquine (N,N'-bis(7-chloroquinolin-4-yl)benzene-1,3-diamine) (dihydrochloride), which is active against Plasmodium berghei in vivo (oral ID50 of 25 mu mol/kg) and multidrug-resistant Plasmodium falciparum K1 in vitro (0.17 mu M). Metaquine shows strong affinity for the putative antimalarial receptor, heme at pH 7.4 in aqueous DMSO. Both crystallographic analyses and quantum mechanical calculations (HF/6-31+G*) reveal important regions of protonation and bonding thought to persist at parasitic vacuolar pH concordant with our receptor model. Formation of drug-heme adduct in solution was confirmed using high-resolution positive ion electrospray mass spectrometry. Metaquine showed strong binding with the receptor in a 1: 1 ratio (log K = 5.7 +/- 0.1) that was predicted by molecular mechanics calculations. This study illustrates a rational multidisciplinary approach for the development of new 4-aminoquinoline antimalarials, with efficacy superior to chloroquine, based on the use of a pharmacophore model.
Resumo:
Helical nanofibers are successfully constructed from suitable self-assembling pseudopeptide-based molecular building blocks. The handedness of these nanofibers can be reversed by using mirror-imaged pseudopeptide-based building blocks. Straight nanofibers are also constructed by modulating the molecular and supramolecular structures by the proper choice of the stereochemical nature of the molecular scaffolds. This study demonstrates that molecular structure and chirality are not the only determining factors for tuning the morphology and chirality of nanostructures; the nature of the supramolecular structures formed from the corresponding molecular scaffolds also plays a key role in dictating the shape and chirality of nanostructures. Helical nanofibers are suitable templates for fabricating dipeptide-capped gold nanoparticles, indicating a possible use of these nanofibers in the construction of arrays of gold nanoparticles.
Resumo:
This paper aims to introduce a knowledge-based managemental prototype entitled Eþ for environmental-conscious construction relied on an integration of current environmental management tools in construction area. The overall objective of developing the Eþ prototype is to facilitate selectively reusing the retrievable knowledge in construction engineering and management areas assembled from previous projects for the best practice in environmental-conscious construction. The methodologies adopted in previous and ongoing research related to the development of the Eþ belong to the operations research area and the information technology area, including literature review, questionnaire survey and interview, statistical analysis, system analysis and development, experimental research and simulation, and so on. The content presented in this paper includes an advanced Eþ prototype, a comprehensive review of environmental management tools integrated to the Eþ prototype, and an experimental case study of the implementation of the Eþ prototype. It is expected that the adoption and implementation of the Eþ prototype can effectively facilitate contractors to improve their environmental performance in the lifecycle of projectbased construction and to reduce adverse environmental impacts due to the deployment of various engineering and management processes at each construction stage.
Resumo:
Although the construction pollution index has been put forward and proved to be an efficient approach to reducing or mitigating pollution level during the construction planning stage, the problem of how to select the best construction plan based on distinguishing the degree of its potential adverse environmental impacts is still a research task. This paper first reviews environmental issues and their characteristics in construction, which are critical factors in evaluating potential adverse impacts of a construction plan. These environmental characteristics are then used to structure two decision models for environmental-conscious construction planning by using an analytic network process (ANP), including a complicated model and a simplified model. The two ANP models are combined and called the EnvironalPlanning system, which is applied to evaluate potential adverse environmental impacts of alternative construction plans.