903 resultados para Isolated power system


Relevância:

80.00% 80.00%

Publicador:

Resumo:

The recent changes concerning the consumers’ active participation in the efficient management of load devices for one’s own interest and for the interest of the network operator, namely in the context of demand response, leads to the need for improved algorithms and tools. A continuous consumption optimization algorithm has been improved in order to better manage the shifted demand. It has been done in a simulation and user-interaction tool capable of being integrated in a multi-agent smart grid simulator already developed, and also capable of integrating several optimization algorithms to manage real and simulated loads. The case study of this paper enhances the advantages of the proposed algorithm and the benefits of using the developed simulation and user interaction tool.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The increase of electricity demand in Brazil, the lack of the next major hydroelectric reservoirs implementation, and the growth of environmental concerns lead utilities to seek an improved system planning to meet these energy needs. The great diversity of economic, social, climatic, and cultural conditions in the country have been causing a more difficult planning of the power system. The work presented in this paper concerns the development of an algorithm that aims studying the influence of the issues mentioned in load curves. Focus is given to residential consumers. The consumption device with highest influence in the load curve is also identified. The methodology developed gains increasing importance in the system planning and operation, namely in the smart grids context.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The current practices in the consumption metering by electricity utilities is currently largely based on monthly consumption reading. The consumption metering device is always calculating the cumulative consumption. Then, it is possible to calculate the difference between the actual and the previous consumption evaluation in order to estimate the monthly consumption. The power systems planning needs in many aspects to handle consumption data obtained for shorter periods, namely in the Demand Response programs planning. The work presented in this paper is based on the application of typical consumption profiles that are previously defined for a certain power system area. Such profiles are then used in order to estimate the 15 minutes consumption for a certain consumer or consumer type.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The recent changes on power systems paradigm requires the active participation of small and medium players in energy management. With an electricity price fluctuation these players must manage the consumption. Lowering costs and ensuring adequate user comfort levels. Demand response can improve the power system management and bring benefits for the small and medium players. The work presented in this paper, which is developed aiming the smart grid context, can also be used in the current power system paradigm. The proposed system is the combination of several fields of research, namely multi-agent systems and artificial neural networks. This system is physically implemented in our laboratories and it is used daily by researchers. The physical implementation gives the system an improvement in the proof of concept, distancing itself from the conventional systems. This paper presents a case study illustrating the simulation of real-time pricing in a laboratory.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

No âmbito do desenvolvimento da dissertação do Mestrado de Engenharia Eletrotécnica – Sistemas Elétricos de Energia, surgiu a oportunidade de participar no desenvolvimento de um projeto integrante numa subestação de energia. O presente caso de estudo tem em vista a resolução de condicionantes na conceção desta subestação, tais como cumprir requisitos estéticos projetando todo o tipo de equipamentos dentro de edifícios, a ventilação das salas de transformação assim como insonorização de todo o ruído produzido de forma a cumprir os limites legais e não perturbar a vizinhança. A presente subestação de energia está situada numa zona urbana da cidade de Leiria, localidade de Parceiros, dando origem ao nome Subestação de Energia de Parceiros. Esta subestação pertence ao cliente Energias de Portugal, conhecida como EDP, e visa o melhoramento da distribuição do serviço eléctrico. As tradicionais subestações de energia, com aparência bastante desenquadrada dos meios urbanos, representam um entrave ao nível da aproximação destes centros de produção energética às zonas urbanas, comprometendo a melhoria da rede elétrica. Desta forma, foi implementada a tecnologia Gas-Insolated Switchgear e permite o enquadramento destes centros energéticos em zonas urbanas, constituindo mais um edifício urbano na zona onde se insere. Esta substitui os convencionais barramentos existentes nos Parques Exteriores de Aparelhagem das subestações e apresenta-se com dimensões muito reduzidas quando comparadas com as estruturas instaladas nestes parques. Dado que esta tecnologia é desenvolvida no sentido de permitir a construção destes centros energéticos em zonas urbanas, podem ser alojadas dentro de edifícios produzindo assim vantagens ao nível estético, não perturbando a paisagem. Dado que os principais equipamentos de funcionamento na subestação de Parceiros, nomeadamente o Transformador de Potência, se encontram instalados num edifício completamente fechado, foram construídas duas salas de ventilação, na parte superior deste edifício, cada uma adjacente a uma sala de transformação. O transformador instalado possui elevadas dimensões, pesando 53000 kg e contendo 11000 kg de óleo que em estado normal de funcionamento circula por quase todo o interior da máquina a elevadas temperaturas, provocando um aquecimento elevado no interior do edifício o que condiciona o bom funcionamento do transformador. Para ultrapassar esta condicionante foi realizado um estudo de um sistema de ventilação capaz de avaliar e controlar os valores térmicos existentes e proceder à circulação de ar, que será movimentado ou bloqueado, recorrendo a um sistema autónomo, mantendo a temperatura ideal nas salas de transformação. Este autómato é o cérebro de toda a cadeia lógica que, mediante as leituras efetuadas irá dar ordens de atuação aos diversos equipamentos. Apesar dos TP estarem protegidos dentro do edifício, estes produzem um maior ruído. A necessidade da existência do referido sistema de ventilação das divisões de funcionamento destas máquinas, implica a utilização de aparelhos que, apesar da sua evolução tecnológica os torna cada vez menos ruidosos, mas geram sempre alguma perturbação, o que pode representar um problema no cumprimento do regulamento geral do ruído.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Os Transformadores de potência são máquinas de elevada importância ao nível dos Sistemas Elétricos de Energia (SEE) uma vez que são estas máquinas que possibilitam a interligação dos diferentes níveis de tensão da rede e a transmissão de energia elétrica em Corrente Alternada (CA). Geralmente, estas máquinas são de grandes dimensões e de elevado nível de complexidade construtiva. Caracterizam-se por possuírem períodos de vida útil bastante elevados (vinte a trinta anos) e preços elevados, o que conduz a um nível de exigência de fiabilidade muito elevada, uma vez que não e viável a existência de muitos equipamentos de reserva nos SEE. Com o objetivo de tentar maximizar o período de vida útil dos transformadores de potência e a sua fiabilidade, tenta-se, cada vez mais, implementar conceitos de manutenção preventiva a este tipo de máquinas. No entanto, a gestão da sua vida útil e extremamente complexa na medida em que, estas máquinas têm vários componentes cruciais e suscetiveis de originar falhas e, quase todos eles, encontram-se no interior de uma cuba. Desta forma, não e possível obter uma imagem do seu estado, em tempo real, sem colocar o transformador fora de serviço, algo que acarreta custos elevados. Por este motivo, desenvolveu-se uma técnica que permite obter uma indicação do estado do transformador, em tempo real, sem o retirar de serviço, colhendo amostras do óleo isolante e procedendo a sua análise físico-química e Analise Gases Dissolvidos (DGA). As análises aos óleos isolantes tem vindo a adquirir uma preponderância muito elevada no diagnóstico de falhas e na analise do estado de conservação destes equipamentos tendo-se desenvolvido regras para interpretação dos parâmetros dos óleos com carácter normativo. Considerando o conhecimento relativo a interpretação dos ensaios físico-químicos e DGA ao oleol, e possível desenvolver ferramentas capazes de otimizar essas mesmas interpretações e aplicar esse conhecimento no sentido de prever a sua evolução, assim como o surgimento de possíveis falhas em transformadores, para assim otimizar os processos de manutenção. Neste campo as Redes Neuronais Artificiais (RNAs) têm um papel fundamental

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Further improvements in demand response programs implementation are needed in order to take full advantage of this resource, namely for the participation in energy and reserve market products, requiring adequate aggregation and remuneration of small size resources. The present paper focuses on SPIDER, a demand response simulation that has been improved in order to simulate demand response, including realistic power system simulation. For illustration of the simulator’s capabilities, the present paper is proposes a methodology focusing on the aggregation of consumers and generators, providing adequate tolls for the demand response program’s adoption by evolved players. The methodology proposed in the present paper focuses on a Virtual Power Player that manages and aggregates the available demand response and distributed generation resources in order to satisfy the required electrical energy demand and reserve. The aggregation of resources is addressed by the use of clustering algorithms, and operation costs for the VPP are minimized. The presented case study is based on a set of 32 consumers and 66 distributed generation units, running on 180 distinct operation scenarios.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The electricity market restructuring, and its worldwide evolution into regional and even continental scales, along with the increasing necessity for an adequate integration of renewable energy sources, is resulting in a rising complexity in power systems operation. Several power system simulators have been developed in recent years with the purpose of helping operators, regulators, and involved players to understand and deal with this complex and constantly changing environment. The main contribution of this paper is given by the integration of several electricity market and power system models, respecting to the reality of different countries. This integration is done through the development of an upper ontology which integrates the essential concepts necessary to interpret all the available information. The continuous development of Multi-Agent System for Competitive Electricity Markets platform provides the means for the exemplification of the usefulness of this ontology. A case study using the proposed multi-agent platform is presented, considering a scenario based on real data that simulates the European Electricity Market environment, and comparing its performance using different market mechanisms. The main goal is to demonstrate the advantages that the integration of various market models and simulation platforms have for the study of the electricity markets’ evolution.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In 2014, the wind energy sector achieved a maturity status within the Portuguese power system. While it still experienced some additional capacity deployment (222 MW), after 15 years of intense deployment Portugal reached 4, 953 MW of installed wind power capacity by the end of 2014. Wind power represents 25% (considering only mainland Portugal) of the total operational capacity and 42% of renewable energy capacity in the country. In 2014, Portuguese wind parks produced 12.1 TWh maintaining a wind energy contribution of 24% of the annually electricity consumption. This high wind penetration was influenced by the favorable wind conditions observed in the first three months of the year over central and northern regions of mainland Portugal that also correspond to the largest concentration of installed wind capacity.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper presents the development of na on-board bidirectional battery charger for Electric Vehicles (EVs) targeting Grid-to-Vehicle (G2V), Vehicle-to-Grid (V2G), and Vehicle-to-Home (V2H) technologies. During the G2V operation mode the batteries are charged from the power grid with sinusoidal current and unitary power factor. During the V2G operation mode the energy stored in the batteries can be delivered back to the power grid contributing to the power system stability. In the V2H operation mode the energy stored in the batteries can be used to supply home loads during power outages, or to supply loads in places without connection to the power grid. Along the paper the hardware topology of the bidirectional battery charger is presented and the control algorithms are explained. Some considerations about the sizing of the AC side passive filter are taken into account in order to improve the performance in the three operation modes. The adopted topology and control algorithms are accessed through computer simulations and validated by experimental results achieved with a developed laboratory prototype operating in the different scenarios.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Tese de Doutoramento - Programa Doutoral em Engenharia Industrial e Sistemas (PDEIS)

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Dissertação de mestrado integrado em Engenharia Mecânica

Relevância:

80.00% 80.00%

Publicador:

Resumo:

RESUM Masjoan és una masia del segle XII on resideix la família Masferrer des del 1710. Actualment a Masjoan l’activitat principal és el cultiu i venta de plantes ornamentals, i l’explotació forestal per obtenir fusta. Pel que fa a l’aigua, tant per a la realització de l’activitat professional com per al subministrament de la casa, aquesta prové de mines d’aigua natural situades en la finca. L’objectiu d’aquest TFC ha estat dissenyar un sistema autònom per automatitzar el procés de derivació de l’aigua procedent d’una mina, i d’aquesta manera aprofitar millor els recursos naturals dels que és disposa. El desenvolupament d’aquest sistema, comprèn la selecció i configuració de sensors i actuadors, el disseny del circuit amb la realització de la placa, el disseny del sistema d’alimentació autònom, el software que controla el sistema, i dimensionar la resta d’elements de la instal•lació. Tot el sistema està controlat per un microcontrolador PIC16F876 i alimentat per un mòdul solar de 4W. En el disseny s’ha procurat, sobredimencionar les diferents etapes per possibles ampliacions o modificacions del sistema i que el circuit procures optimitzar el consum d’energia. Com a conclusions cal dir que s’han assolit els objectius proposats amb èxit. S’ha aconseguit un disseny funcional i estable que actualment es troba en funcionament.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Tämän diplomityön tarkoitus on selvittää pienjakelujännitteen nostosta aiheutuvia vaikutuksia sellutehtaan varavoimaverkossa. Työn alussa esitellään varavoimaverkkoon kuuluvia osia, selvitetään erilaisten kuormien vaikutusta varavoimaverkon sähkön laatuun sekä kuormien jakoa varmennettuihin verkkoihin. Seuraavaksi suunnitellaan kaksi keskitettyä varavoimaverkkomallia eri pienjakelujännitteillä. Mallien nimellisjännitteet ovat 400 V ja 690 V. Varavoimaverkkomallien kuormat ja osastojen väliset etäisyydet on otettu valmiista sellutehtaista. Tässä diplomityössä painotutaan erityisesti varavoimaverkkomallien mitoitukseen ja jakelujännitteen nostosta aiheutuvien vaikutusten teknistaloudelliseen vertailuun. Vertailu tehdään keskijännitekojeiston ja varavoimakeskusten välisellä alueella, johon kuu-luvat jakelumuuntaja, varavoimakone, varavoimapääkeskus, kiskosillat, jakelukaapelit, kytkinvaroke- ja katkaisijalähdöt sekä mahdolliset välimuuntajat. Varavoimaverkkojen välisessä kustannusvertailussa käytetään nykyarvomenetelmää.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Työn tavoitteena oli kartoittaa vaihtoehtoisia menetelmiä perinteiselle aikatasossa tapahtuvalle kulmastabiilisuuden mallinnukselle käyttövarmuustarkastelussa. Vaihtoehtoisiin menetelmiin tutustuttiin kirjallisuuden avulla ja valittiin menetelmä testattavaksi pohjoismaisessa yhteiskäyttöjärjestelmässä. Vaihtoehtoisen menetelmän ominaisuusvaatimuksiin kuului nopeampi laskenta, luotettava stabiilien ja epästabiilien tilanteiden seulontakyky ja menetelmän antama indeksi stabiilisuus-/epästabiilisuusasteesta. Pääasiassa menetelmät, joihin tutustuttiin, arvioivat vain transienttia stabiilisuutta. SIME-menetelmä soveltui myös dynaamisen stabiilisuuden arviointiin. Suomessa voi dynaamisella stabiilisuudella olla tulevaisuudessa merkittävä rooli käyttövarmuustarkasteluissa. SIME-menetelmän toimivuutta testattiin osin yksinkertaistetulla Nordel-verkkomallilla, ja saadut tulokset olivat lupaavia. Menetelmä täytti uudelle menetelmälle asetetut vaatimukset, vaikka ongelmiakin esiintyi. Testauksessa käytetyn menetelmän edelleen kehittäminen ja menetelmän testaaminen täydellisellä verkkomallilla on suositeltavaa.