983 resultados para Integration projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper we construct earthwork allocation plans for a linear infrastructure road project. Fuel consumption metrics and an innovative block partitioning and modelling approach are applied to reduce costs. 2D and 3D variants of the problem were compared to see what effect, if any, occurs on solution quality. 3D variants were also considered to see what additional complexities and difficulties occur. The numerical investigation shows a significant improvement and a reduction in fuel consumption as theorised. The proposed solutions differ considerably from plans that were constructed for a distance based metric as commonly used in other approaches. Under certain conditions, 3D problem instances can be solved optimally as 2D problems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Unless sustained, coordinated action is generated in road safety, road traffic deaths are poised to rise from approximately 1.3 to 1.9 million a year by 2020 (Krug, 2012). To generate this harmonised response, road safety management agencies are being urged to adopt multisectoral collaboration (WHO, 2009b), which is achievable through the principle of policy integration. Yet policy integration, in its current hierarchical format, is marred by a lack of universality of its interpretation, a failure to anticipate the complexities of coordinated effort, dearth of information about its design and the absence of a normative perspective to share responsibility. This paper addresses this ill-conception of policy integration by reconceptualising it through a qualitative examination of 16 road safety stakeholders’ written submissions, lodged with the Australian Transport Council in 2011. The resulting, new principle of policy integration, Participatory Deliberative Integration, provides a conceptual framework for the alignment of effort across stakeholders in transport, health, traffic law enforcement, relevant trades and the community. With the adoption of Participatory Deliberative Integration, road safety management agencies should secure the commitment of key stakeholders in the development and implementation of, amongst other policy measures, National Road Safety Strategies and Mix Mode Integrated Timetabling.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background: Delivering integrated team care is a major priority for many countries. In Australia this is a component of the GP Super Clinic Program but it is also a focus of the broader primary care sector. Explicit consideration of human dynamics and team process is often absent from the move to integrated team care. Objective: To provide a practical framework that will inform the development and evaluation of integrated healthcare teams. Discussion: The Team Focused and Clinical Content Framework is an approach to building integrated teams. This has the potential to be used to monitor and evaluate team development and functioning. Both the framework and clinical pathways provide practical tools for clinics to address the need to build integration into teams.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In recent years, enterprise architecture (EA) has captured increasing interest as a means to systematically consolidate and manage various enterprise artefacts in order to provide holistic decision support for business/IT alignment and business/IT landscapes management. To provide a holistic perspective on the enterprise over time, EA frameworks need to co-evolve with the changes in the enterprise and its IT over time. In this paper we focus on the emergence of Service-Oriented Architecture (SOA). There is a need to integrate SOA with EA to keep EA relevant and to use EA products to help drive successful SOA. This paper investigates and compares the integration of SOA elements in five widely used EA frameworks: Archimate, The Open Group Architecture Framework (TOGAF), Federal Enterprise Architecture Framework (FEAF), Department of Defence Architecture Framework (DoDAF) and the Ministry of Defence Architecture Framework (MODAF). It identifies what SOA elements are considered and their relative position in the overall structure. The results show that services and related elements are far from being well-integrated constructs in current EA frameworks and that the different EA frameworks integrated SOA elements in substantially different ways. Our results can support the academic EA and SOA communities with a closer and more consistent integration of EA and SOA and support practitioners in identifying an EA framework that provides the SOA support that matches their requirements.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Supply chain management and customer relationship management are concepts for optimizing the provision of goods to customers. Information sharing and information estimation are key tools used to implement these two concepts. The reduction of delivery times and stock levels can be seen as the main managerial objectives of an integrative supply chain and customer relationship management. To achieve this objective, business processes need to be integrated along the entire supply chain including the end consumer. Information systems form the backbone of any business process integration. The relevant information system architectures are generally well-understood, but the conceptual specification of information systems for business process integration from a management perspective, remains an open methodological problem. To address this problem, we will show how customer relationship management and supply chain management information can be integrated at the conceptual level in order to provide supply chain managers with relevant information. We will further outline how the conceptual management perspective of business process integration can be supported by deriving specifications for enabling information system from business objectives.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes the instigation and development of an expert system to aid in the strategic planning of construction projects. The paper consists of four parts - the origin of the project, the development of the concepts needed for the proposed system, the building of the system itself, and assessment of its performance. The origin of the project is outlined starting with the Japanese commitment to 5th generation computing together with the increasing local reaction to theory based prescriptive research in the field. The subsequent development of activities via the Alvey Commission and the RICS in conjunction with Salford University are traced culminating in the proposal and execution of the first major expert system to be built for the UK construction industry, subsequently recognised as one of the most successful of the expert system projects commissioned under the Alvey programme

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Total Dik! is a collaborative project between the Queensland University of Technology (QUT) and Queensland Theatre Company (QTC). Total Dik! explores transmedia storytelling in live performance from concept development to delivery and builds on works, By the Way, Meet Vera Stark, (Forrester2012), Hotel Modern’s Kamp (2005) and God’s Beard (2012) that use visual art, puppetry, music and film. The project’s first iteration enabled an interrogation of the integration of media-rich elements with live performers in a theatrical environment. Performative transmedia storytelling draws on the tenets of convergent media theory developed by Jenkins (2007, 2012), Dena (2010) and Philips (2012). This exploratory work, juxtaposing transmedia storytelling techniques with live performance, draws on Samuel Becket’s challenges to theatre orthodoxy, and touches on Brechtian notions of alienation through ‘sleight-of-hand’ or processual unpacking and deconstruction during performance. Total Dik! blends a convergence of technologies, models, green screen capture, and live dimensions of performance in one narrative allowing the work’s creators to test new combinations of transmedia storytelling techniques on a traditional performance platform.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this presentation, renowned arts practitioner, Sean Mee, and Nigel Lavender, Executive Director of the Queensland Music Festival, talk about how community arts practice can be used to build cultural captial in communities, using examples such large-scale musicals such as The Road We're ON (Charleville) and Behind the Cand (Bowen), Mee and Lavender highlight the importance of community-driven narrative and particiaption.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Post–disaster reconstruction projects are often considered ineffectual or unproductive because on many occasions in the past they have performed extremely poorly during post-contract occupation, or have failed altogether to deliver acceptable outcomes. In some cases, these projects have already failed even before their completion, leading many sponsor aid organisations to hold these projects up as examples of how not to deliver housing reconstruction. Research into some previous unsuccessful projects has revealed that often the lack of adequate knowledge regarding the context and complexity involved in the implementation of these projects is generally responsible for their failure. Post-disaster reconstruction projects are certainly very complex in nature, often very context-specific and they can vary widely in magnitude. Despite such complexity, reconstruction projects can still have a high likelihood of success if adequate consideration is given to the importance of factors which are known to positively influence reconstruction efforts. Good outcomes can be achieved when planners and practitioners ensure best practices are embedded in the design of reconstruction projects at the time reconstruction projects they are first instigated. This paper outlines and discusses factors that significantly contribute to the successful delivery of post-disaster housing reconstruction projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dynamic capability theory asserts that the learning capabilities of construction organisations influence the degree to which value-for-money (VfM) is achieved on collaborative projects. However, there has been little study conducted to verify this relationship. The evidence is particularly limited within the empirical context of infrastructure delivery in Australia. Primarily drawing on the theoretical perspectives of the resource-based view of the firm (e.g. Barney 1991), dynamic capabilities (e.g. Helfat et al. 2007), absorptive capacity (e.g. Lane et al. 2006) and knowledge management (e.g. Nonaka 1994), this paper conceptualises learning capability as a knowledge-based dynamic capability. Learning capability builds on the micro-foundations of high-order learning routines, which are deliberately developed by construction organisations for managing collaborative projects. Based on this conceptualisation of learning capability, an exploratory case study was conducted. The study investigated the operational and higher-order learning routines adopted by a project alliance team to successfully achieve VfM. The case study demonstrated that the learning routines of the alliance project were developed and modified by the continual joint learning activities of participant organisations. Project-level learning routines were found to significantly influence the development of organisational-level learning routines. In turn, the learning outcomes generated from the alliance project appeared to significantly influence the development of project management routines and contractual arrangements applied by the participant organisations in subsequent collaborative projects. The case study findings imply that the higher-order learning routines that underpin the learning capability of construction organisations have the potential to influence the VfM achieved on both current and future collaborative projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Growing community concerns about the ecological, social, cultural and economic impact of housing and urban projects poses new challenges for those who have to deliver them. It is important that these concerns are addressed as part of the community engagement processes on projects. Community engagement is traditionally perceived as the purview of planners and disconnected from the building construction process. This is despite most project approval processes mandating on-going community engagement over the project’s entire lifetime. There is evidence that point to a culture of ambiguity and ambivalence among building professionals about their roles, responsibilities and expectations of community engagement during the construction phase of projects. This has contributed to a culture of distrust between communities and the construction industry. There is a clear need to build capacity among building professionals to empower them as active participants in community engagement processes which can promote better project outcomes and minimise delays and conflicts. This paper describes a process that utilises the Theory of Planned Behaviour as a framework to equip building professionals with the skills they need to engage effectively with local communities during the construction phase of projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sustainability needs to be embedded throughout the life-cycle of a construction project. From project conception, planning, design, construction stage, operation and maintenance to demolition, each phase of development should embrace principles of sustainability and the stakeholder involved should be empowered with the necessary skills. Past research explored the importance of ensuring sustainability measures during the occupancy phase based on considerations of Life-Cycle Cost Analysis and a project’s long-term detrimental impact on the environment. Facility managers are in a unique position to promote sustainability over longer periods of project engagement and can apply a high level of influence on the built assets through management and upgrades. There is growing interest among facility managers in incorporating sustainability measures into day-to-day practice. More, however, needs to be done. Previous studies have identified barriers such as the lack of sustainability knowledge and skills, poor access to information, and unwillingness to change among facility management (FM) practitioners and stakeholders. This inhibits proper implementation of sustainable practices in the FM sector. A number of key factors, such as knowledge discrepancy, time constraints, diversity of FM functions and a lack of incentives, require urgent remedy. The capability of FM professionals and stakeholders will be a key enabler in managing the sustainability agenda, as it is central to the improvement of competency and innovation in an organization. Compared to the attempts at developing sustainability guidelines and performance measurement, research efforts relating to people capabilities and skills are still lagging behind. This paper discusses the progress to date of a research project aimed at formulating a people capabilities framework for sustainable FM practices based on expert opinions and industry feedback. Through literature review, the paper explores the challenges of incorporating sustainability principles into general FM practices before focusing specifically on FM personnel capabilities that may impact on the implementation of a holistic sustainability agenda in real life practice. The results of an industry survey are used to propose an action framework to identify, promote and utilise people capabilities in order to promote sustainability integration in FM practices. The paper provides a useful information source for FM personnel and organizations to bridge the gap between extensive tools on sustainable design and construction assessment at the front end and the need to maintain focus throughout the project life-cycle.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The green building trend has increased rapidly worldwide in recent decades as a means of addressing growing concerns over climate change and global warming and to reduce the impact of the building industry on the environment. A significant contribution in Australia is the use of a series of rating tools by the Green Building Council Australia (GBCA) for the certification of various types of buildings. This paper reviews the use of the Green Star system in Australian building construction, and investigates the potential challenges involved in acquiring the certification of Australian buildings by critically analysing a database of most recently certified GBCA projects. The results show that management-related credits and innovation-related credits are the easiest and most difficult respectively to obtain. Additionally, 6-Star green buildings achieve significantly higher points than other certified buildings in the Energy category. In contrast, 4 Star green buildings achieve more points in the Material category than 5 and 6 Star buildings. The study offers a useful reference for both property developers and project teams to obtain a better understanding of the rating scheme and consequently the effective preparation of certification documentation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background WSUD implementation in the Gold Coast City Council area commenced more than a decade ago. As a result, Council is expected to be in possession of WSUD assets valued at over tens of million dollars. The Gold Coast City Council is responsible for the maintenance and long-term management of these WSUD assets. Any shortcoming in implementation of best WSUD practices can potentially result in substantial liabilities and ineffective expenditure for the Council in addition to reduced efficiencies and outcomes. This highlights the importance of periodic auditing of WSUD implementation. Project scope The overall study entailed the following tasks: * A state-of-the-art literature review of the conceptual hydraulic and water quality treatment principles, current state of knowledge in relation to industry standards, best practice and identification of knowledge gaps in relation to maintenance and management practices and potential barriers to the implementation of WSUD. * Council stakeholder interviews to understand current practical issues in relation to the implementation of WSUD and the process of WSUD application from development application approval to asset management. * Field auditing of selected WSUD systems for condition assessment and identification of possible strengths and weaknesses in implementation. * Review of the Land Development Guidelines in order to identify any gaps and to propose recommendations for improvement. Conclusions Given below is a consolidated summary of the findings of the study undertaken. State-of-the-art literature review Though the conceptual framework for WSUD implementation is well established, the underlying theoretical knowledge underpinning the treatment processes and maintenance regimes and life cycle costing are still not well understood. Essentially, these are the recurring themes in the literature, namely, the inadequate understanding of treatment processes and lack of guidance to ensure specificity of maintenance regimes and life cycle costing of WSUDs. The fundamental barriers to successful WSUD implementation are: * Lack of knowledge transfer – This essentially relates to the lack of appropriate dissemination of research outcomes and the common absence of protocols for knowledge transfer within the same organisation. * Cultural barriers – These relate to social and institutional factors, including institutional inertia and the lack of clear understanding of the benefits. * Fragmented responsibilities – This results from poor administrative integration within local councils in relation to WSUDs. * Technical barriers – These relate to lack of knowledge on operational and maintenance practices which is compounded by model limitations and the lack of long-term quantitative performance evaluation data. * Lack of engineering standards – Despite the availability of numerous guidelines which are non-enforceable and can sometimes be confusing, there is a need for stringent engineering standards. The knowledge gaps in relation to WSUDs are only closing very slowly. Some of the common knowledge gaps identified in recent publications have been recognised almost a decade ago. The key knowledge gaps identified in the published literature are: * lack of knowledge on operational and maintenance practices; * lack of reliable methodology for identifying life cycle issues including costs; * lack of technical knowledge on system performance; * lack of guidance on retrofitting in existing developments. Based on the review of barriers to WSUD implementation and current knowledge gaps, the following were identified as core areas for further investigation: * performance evaluation of WSUD devices to enhance model development and to assess their viability in the context of environmental, economic and social drivers; establishing realistic life cycle costs to strengthen maintenance and asset management practices; * development of guidelines specific to retrofitting in view of the unique challenges posed by existing urban precincts together with guidance to ensure site specificity; establishment of a process for knowledge translation for enhancing currently available best practice guidelines; * identification of drivers and overcoming of barriers in the areas of institutional fragmentation, knowledge gaps and awareness of WSUD practices. GCCC stakeholder interviews Fourteen staff members involved in WSUD systems management in the Gold Coast City Council, representing four Directorates were interviewed using a standard questionnaire. The primary issues identified by the stakeholders were: * standardisation of WSUD terminology; * clear protocols for safeguarding devices during the construction phase; * engagement of all council stakeholders in the WSUD process from the initial phase; * limitations in the Land Development Guidelines; * ensuring public safety through design; * system siting to avoid conflicts with environmental and public use of open space; * provision of adequate access for maintenance; * integration of social and ecosystem issues to ensure long-term viability of systems in relation to both, vandalism and visual recreation; * lack of performance monitoring and inadequacy of the maintenance budget; * lack of technical training for staff involved in WSUD design approvals and maintenance; incentives for developers for acting responsibly in stormwater management. Field auditing of WSUD systems A representative cross section of WSUD systems in the Gold Coast were audited in the field. The following strengths and weaknesses in WSUD implementation were noted: * The implementation of WSUD systems in the field is not consistent. * The concerns raised by the stakeholders during the interviews in relation to WSUD implementation was validated from the observations from the field auditing, particularly in relation to the following: * safeguarding of devices during the construction phase * public safety * accessibility for maintenance * lack of performance monitoring by Council to assess system performance * inadequate maintenance of existing systems to suit site specific requirements. * A treatment train approach is not being consistently adopted. * Most of the systems audited have satisfactorily catered for public safety. Accessibility for maintenance has been satisfactorily catered for in most of the systems that were audited. * Systems are being commissioned prior to construction activities being substantially completed. * The hydraulic design of most systems appears to be satisfactory. * The design intent of the systems is not always clear. Review of Land Development Guidelines The Land Development Guidelines (TDG) was extensively reviewed and the following primary issues were noted in relation to WSUD implementation: * the LDG appears to have been prepared primarily to provide guidance to developers. It is not clear to what extent the guidelines are applicable to Council staff involved in WSUD maintenance and management; * Section 13 is very voluminous and appears to be a compilation of a series of individual documents resulting in difficulties in locating specific information, a lack of integration and duplication of information; * the LDG has been developed with a primary focus on new urban precinct development and the retrofitting of systems in existing developments has not been specifically discussed; * WSUDs are discussed in two different sections in the LDG and it is not clear which section takes precedence as there are inconsistencies between the two sections; there is inconsistent terminology being used; * there is a need for consolidation of information provided in different sections in the LDG; * there are inconsistencies in the design criteria provided; * there is a need for regular updating of the LDG to ensure that the information provided encompasses the state-of-the-art; * there is limited guidance provided for the preparation of maintenance plans and life cycle costing to assist developers in asset handover and to assist Council staff in assessment. * Based on these observations, eleven recommendations have been provided which are discussed below. Additionally, the stakeholder provided the following specific comments during the interviews in relation to the LDG: * lack of flexibility to cover the different stages of the life cycle of the systems; * no differentiation in projects undertaken by developers and Council; * inadequate information with regards to safety issues such as maximum standing water depth, fencing and safety barriers and public access; * lack of detailed design criteria in relation to Crime Prevention through Environmental Design, safety, amenity, environment, surrounding uses and impacts on surroundings; * inadequate information regarding maintenance requirements specific to the assessment and compliance phases; * recommendations for plantings are based primarily on landscape requirements rather than pollutant uptake capability. Recommendations With regards to the Land Development Guidelines, the following specific recommendations are provided: 1. the relevant sections and their extent of applicability to Council should be clearly identified; 2. integration of the different subsections within Section 13 and re-formatting the document for easy reference; 3. the maintenance guidelines provided in Section 13 should be translated to a maintenance manual for guidance of Council staff; 4. should consider extending the Guidelines to specifically encompass retrofitting of WSUD systems to existing urban precincts; 5. Section 3 needs to be revised to be made consistent with Section 13, to ensure priority for WSUD practices in urban precincts and to move away from conventional stormwater drainage design such as kerb and channelling; 6. it would also be good to specify as to which Section takes predominance in relation to stormwater drainage. It is expected that Section 13 would take predominance over the other sections in the LDG; 7. terminology needs to be made consistent to avoid confusion among developers and Council staff. Water Sensitive Urban Design is the term commonly used in Australia for stormwater quality treatment, rather than Stormwater Quality Improvement Devices. This once again underlines the need for ensuring consistency between Section 3 and Section 13; 8. it would also be good if there is a glossary of commonly used terms in relation to WSUD for use by all stakeholders and which should also be reflected in the LDG; 9. consolidation of all WSUD information into one section should be considered together with appropriate indicators in other LDG Sections regarding the availability of WSUD information. Ensuring consistency in the information provided is implied; 10. Section 13 should be updated at regular intervals to ensure the incorporation of the latest in research outcomes and incorporating criteria and guidance based on the state-of-the-art knowledge. The updating could be undertaken, say, in five year cycles. This would help to overcome the current lack of knowledge transfer; 11. the Council should consider commissioning specialised studies to extend the current knowledge base in relation to WSUD maintenance and life cycle costing. Additionally, Recommendation 10 is also applicable in this instance. The following additional recommendations are made based on the state-of-the-art literature review, stakeholder interviews and field auditing of WSUD systems: 1. Performance monitoring of existing systems to assess improvements to water quality, identify modifications and enhancements to improve performance; 2. Appropriate and monitored maintenance during different phases of development of built assets over time is needed to investigate the most appropriate time/phase of development to commission the final WSUD asset. 3. Undertake focussed investigations in the areas of WSUD maintenance and asset management in order to establish more realistic life cycle costs of systems and maintenance schedules; 4. the engagement of all relevant Council stakeholders from the initial stage of concept planning through to asset handover, and ongoing monitoring. This close engagement of internal stakeholders will assist in building a greater understanding of responsibilities and contribute to overcoming constraints imposed by fragmented responsibilities; 5. the undertaking of a public education program to inform the community of the benefits and ecosystem functions of WSUD systems; 6. technical training to impart state-of-the-art knowledge to staff involved in the approval of designs and maintenance and management of WSUD projects; 7. during the construction phase, it is important to ensure that appropriate measures to safeguard WSUD devices are implemented; 8. risks associated with potential public access to open water zones should be minimised with the application of appropriate safety measures; 9. system siting should ensure that potential conflicts are avoided with respect to public and ecosystem needs; 10. integration of social and ecosystem issues to ensure long-term viability of systems; provide incentives to developers who are proactive and responsible in the area of stormwater management.