990 resultados para Harvard University--Regulations
Resumo:
This drawing includes the intricate stonework designed by Charles Bulfinch for University Hall. Each stone is numbered or lettered to indicate the exact stones needed for the project.
Resumo:
This drawing includes the dimensions for the north and south stairs as well as for the spaces surrounding the staircases. Dimensions are also given for the windows and doors.
Resumo:
This is a contract signed between Loammi Baldwin, acting on behalf of the President and Fellows of Harvard College, and Josiah Moore, John Walton, Thomas Mason, Samuel Mason, and Joseph Holmes for completing the dining rooms and chapel of University Hall. The agreement was witnessed by Abraham Edwards and Thomas Edwards.
Resumo:
Draft of the official signed copy of the contract in Box 1, Folder 42. This copy is written in a different hand and contains several struck through phrases.
Resumo:
Signed by President John Kirkland, this Corporation vote acknowledges that Loammi Baldwin has given his notice that he can no longer oversee the construction of University Hall. The Corporation votes to pay him seven hundred dollars for his services.
Resumo:
This contract includes stipulations for finishing the two kitchens, windows, and floors in University Hall by the first of August 1815.
Resumo:
Title transcribed by cataloger.
Resumo:
Pen and ink drawing of proposed alterations to the chapel in University Hall which were completed in August 1835. Includes measurements to scale.
Resumo:
v.129 (1963)
Resumo:
v.37 (1900-1901)
Resumo:
v.155 (1996-2001)
Resumo:
v.147 (1975-1977)
Resumo:
v.4 (1907-1908)
Resumo:
v.146 (1974-1975)
Resumo:
v.153 (1992-1994)