925 resultados para Hart, Liddel
Resumo:
Sapintoxin A (SAP A), a naturally occurring biologically active but non-promoting phorbol ester, acts as an effective in vitro mitogen for freshly derived human melanocytes. Seven days after addition of 50 nM SAP A there was a four to fivefold increase in melanocyte number over that observed in untreated control cultures comparable to that achieved with a 50 nM concentration of 12-0-tetradecanoylphorbol 13-acetate (TPA). The fluorescent stage 2 promoter sapintoxin D (SAP D) also supported the growth of these cells, with a 50 nM dose producing an increase in cell number comparable to that observed with 200 nM TPA. Similar results were obtained with an established, but non-tumorigenic, line of murine melanocytes. The same compounds exerted a potent anti-proliferative effect against transformed melanocyte lines of murine and human origin associated with morphological alterations and an increase in melanin production consistent with induced cytodifferentiation.
Resumo:
Under the Public Bodies Bill 2010, the HFEA, cornerstone in the regulation of assisted reproduction technologies (ART) for the last twenty years, is due to be abolished. This implies that there is no longer a need for a dedicated regulator for ART and that the existing roles of the Authority as both operational compliance monitor, and instance of ethical evaluation, may be absorbed by existing healthcare regulators. This article presents a timely analysis of these disparate functions of the HFEA, charting reforms adopted in 2008 and assessing the impact of the current proposals. Taking assisted conception treatment as the focus activity, it will be shown that the last few years have seen a concentration on the HFEA as a technical regulator based upon the principles of Better Regulation, with little analysis of how the ethical responsibility of the Authority fits into this framework. The current proposal to abolish the HFEA continues to fail to address this crucial question. Notwithstanding the fact that the scope of the Authority's ethical role may be questioned, its abolition requires that the Government consider what alternatives exists - or need to be put in place - to provide both responsive operational regulation and a forum for ethical reflection and decision-making in an area which continues to pose regulatory challenges
Resumo:
An important part of strategic planning’s purpose should be to attempt to forecast the future, not simply to belatedly respond to events, or accept the future as inevitable. This paper puts forward a conceptual approach for seeking to achieve these aims and uses the Bournemouth and Poole area in Dorset as a vehicle for applying the basic methodology. The area has been chosen because of the significant issues that it currently faces in planning terms; and its future development possibilities. In order that alternative future choices for the area – different ‘developmental trajectories’ – can be evaluated, they must be carefully and logically constructed. Four Futures for Bournemouth/Poole have been put forward; they are titled and colour-coded: Future One is Maximising Growth – Golden Prospect which seeks to achieve the highest level of economic prosperity of the area; Future Two is Incremental Growth – Solid Silver which attempts to facilitate a steady, continuing, controlled pattern of the development for the area; Future Three is Steady State – Cobalt Blue which suggests that people in the area could be more concerned with preserving their quality of life in terms of their leisure and recreation rather than increasing wealth; Future Four is Environment First – Jade Green which makes the area’s environmental protection its top priority even at the possible expense of economic prosperity. The scenarios proposed here are not sacrosanct. Nor are they simply confined to the Bournemouth and Poole area. In theory, suitably modified, they could use in a variety of different contexts. Consideration of the scenarios – wherever located - might then generate other, additional scenarios. These are called hybrids, alloys and amalgams. Likewise it might identify some of them as inappropriate or impossible. Most likely, careful consideration of the scenarios will suggest hybrid scenarios, in which features from different scenarios are combined to produce alternative or additional futures for consideration. The real issue then becomes how best to fashion such a future for the particular area under consideration
Resumo:
In this paper we undertake a preliminary assessment of the regional planning and development implications of BAA Stansted Airport’s planning permission to grow to 25 million passengers per annum (mppa) by 2010. Our concern is not simply to consider the overall growth of the airport on the airport site itself but the nature and type of growth both on- and off-site. In this document we focus on the submitted planning permission documents and test them. The methodology we employed was to draw on published and unpublished numerical estimates of the airport’s growth – particularly including estimates produced by the airport owner, BAA, and their economic and planning consultants DTZ Pieda - and critically, and systematically analyse their figures. We adopted this approach because unless the figures which were employed in the initial calculations were correct then all of the subsequent projections which flow from them - and the polices which could then be based on them – could be flawed. The analysis is divided into two parts – firstly, are the growth forecasts correct?; and secondly, what do these forecasts actually mean in developmental terms? In effect, what we have done is to produce a critique of the existing body of evidence by questioning underpinning assumptions and then draw some preliminary conclusions for the region based on this analysis. A major focus of this report has been analyse the figures involved in the planning application to expand Stansted to 25mppa. Ironically, one of our key findings, that the local impact of Stansted’s proposed expansion in employment terms might well be less than was originally thought, might make it easier to gain the acceptance of the relevant local authorities involved to allow the development to take place. Our main overall findings are that the BAA projections over-estimate the local employment impact of the airport’s proposed growth and under-estimate its potential regional ‘transportation’ employment effect. These two findings are, of course, related to each other in important ways, and we also feel that they have potentially significant medium and long-term economic, competitiveness and planning policy implications for the East of England region