956 resultados para Detroit River (Mich. and Ont.)
Resumo:
This is the River Dart Salmon Project Summary of Phase I Report (2002) by the Westcountry Rivers Trust. The report contains sections on the introduction to Dart Salmon, factors affecting salmon numbers, salmon rod catch and salmon electro-fishing data, and a summary and discussion of the next phase. It also contains two tables with time series analysis on fry/parr numbers in representative section of the River Dart and figures with trends in fry/parrs numbers at juveniles electro-fishing sites. The section on salmon rod catch data includes trend analysis, cross-correlation of catches in different rivers and a general conclusion.
Resumo:
This is the River Dart Biological Survey from 10th June to 15th July 1968 by the Devon River Authority. This survey was undertaken to investigate the invertebrate bottom fauna of the river and to assess the condition of the river with regard to pollution. It describes the environmental conditions of the River Dart and the biological sampling method used, plus a brief conclusion of the survey. It also contains tables with the different species present and abundance on each sampling stations.
Resumo:
This is the River Teign Fisheries Survey from 1990 by the Environment Agency Archives South West (unpublished). The aim of the survey was to assess the distribution and relative abundance of salmonid fish in the River Teign. Thirty six sites were examined; twenty one of them had been examined in previous quantitative fish surveys. At each site, all fish species encountered were caught and measured, however, only data for salmonid fishes has been examined. The results are compared with those of the 1963 and 1972 surveys carried out by the Devon River Authority and the 1975 and 1979 surveys carried out by South West Water Authority. A full list of sites together with their location, fish densities, lengths, weights and ages is attached.
Resumo:
This is the Argumentation of the River Derwent using Thirlmere produced by the Cumberland River Authority in 1972. This report focuses on the augmentation of the River Derwent by a limited discharge from the Thirlmere Reservoir in short terms. A Working Party of officers from both the Authority and the Corporation was established and experimental releases of water from Thirlmere were made in dry periods in order to assess more clearly their effect upon river flows, and on the level of Bassenthwaite Lake. This report contains the Working Party's evaluations, conclusions and recommendations.
Resumo:
This is the Wetland resource evaluation and the NRA's role in its conservation: Resource assessment report produced by North West Water in 1982. In this report data from a variety of sources in river Leven and Leven estuary have been examined to determine if there was any objective foundation for the allegations and for the assertion that poor fish catches were related to discharges of industrial effluent to the estuary. Catches of salmon and sea trout from the Leven did not appear to have suffered any long term declines and year to year fluctuations did not appear to be any more extreme than in other North West rivers. Fish surveys did not show any marked differences in the diversity or distribution of fish between the Kent and Leven estuaries but catches of flounders were consistently lower from the Leven estuary. Analysis of fisheries statistics of landings of fish and shellfish from Morecambe Bay did not show any evidence of localised declines in catches from the Leven estuary. Results of laboratory experiments suggested that populations of bivalve molluscs might be more at risk from the effects of discharges to the Leven estuary than resident or migratory fish.
Resumo:
Historic film on the River Lune, North England, UK. It shows the River Lune near its estuary at Lancaster. The film was made in the summer of 1972 over several weeks and is 14:25 minutes long. It combines aerial shots of the River, scientific and hydraulic work by the University of Salford which worked on a new weir of the Lune (Skerton Weir). Audio commentary explains the work. The film was produced by Cinephoto House, Manchester, on behalf of the predecessor orgenaisation of the Environment Agency, UK. The intended audience of the film is unknown.
Resumo:
This is the River Camel Salmon Action Plan produced by the Environment Agency in 2002. The report focuses on the River Camel Salmon Action Plan (SAP). The River Camel SAP follows the format of those completed for the Rivers Tamar, Lynher and Tavy. It is the 4th of 7 action plans that will be produced for salmon rivers managed by the Cornwall Area Fisheries, Recreation and Biodiversity Team. This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. In addition, for the first time, Salmon Action Plans have attempted to evaluate in economic terms, all of the contributory components of the salmon fishery. The River Camel Salmon Action Plan contains a description of the river catchment and highlights particular features that are relevant to the salmon population and associated fishery.
Resumo:
This is the River Fowey Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Fowey Salmon Action Plan (SAP). The River Fowey SAP follows the format of those completed for the Rivers Tamar, Lynher, Tavy and Camel. It is the 5th of 7 action plans that will be produced for salmon rivers managed by the Cornwall Area Fisheries, Recreation and Biodiversity Team. This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Fowey SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. Notably, there are historic workings for copper and china clay and two significant potable supply reservoirs (Siblyback and Colliford) which have been constructed within the catchment during the past 35 years. The whole of the Fowey catchment is set at the highest water quality grading of RE1 and this standard is met in all reaches of the River Fowey and its tributaries.
Resumo:
This is the River Lynher Salmon Action Plan Consultation document produced by the Environment Agency in 1998. The report pays attention on the external consultation of the River Lynher Salmon Action Plan (SAP). The River Lynher SAP follows that for the River Tamar and is the second of seven action plans that will be produced for salmon rivers managed by the Cornwall area fisheries department. This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Lynher SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. The analysis of recent and historical catches of salmon on the River Lynher from both the rod and net fisheries indicated the fishery's reliance upon post 1 June salmon. Historically, annual salmon catches (both rod and net) on the River Lynher have been found to consist of a much higher proportion of pre 1 June (spring) salmon. Evidence is provided that illustrates the extent of the decline within this stock component since the early 1980s.
Resumo:
This is the River Lynher Salmon Action Plan Final document produced by the Environment Agency in 1999. This final Salmon Action Plan (SAP) for the River Lynher catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Lynher salmon stock. The actions presented within this final Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. The River Lynher salmon stock has suffered two periods of spawning target failure within the past ten years. This assessment can only be estimated and in this case is likely to be dependent on river flow and the availability of salmon to the rods as only rod catch is used in the compliance assessment.
Resumo:
This is the River Plym Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Plym Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Plym SAP follows the format of those completed for the rivers Tamar, Lynher, Tavy, Camel and Fowey. It is the sixth of seven action plans that will be produced for salmon rivers managed by Cornwall Area. The River Plym SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. Notably, there are historic workings for china clay and a significant potable water supply at Burrator Reservoir. The main River Plym has been designated as River Ecosystem class 1 for its water quality objectives. This is the highest water quality target set for rivers. This standard has been met in all reaches of the main River Plym and River Meavy.
Resumo:
This is the River Tamar Salmon Action Plan Consultation document produced by the Environment Agency in 1998. The report pays attention on the external consultation of the River Tamar Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Tamar was one of the premier salmon rivers in the West Country, supporting fifteen licensed estuary nets, and the second highest rod catch behind the River Exe. The River Tamar SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery.
Resumo:
This is the River Tavy Salmon Action Plan Consultation document produced by the Environment Agency in 1999. The report pays attention on the external consultation of the River Tavy Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. In addition, salmon action plans have for the first time, attempted to evaluate in economic terms, all of the contributory components of the salmon fishery. The River Tavy Salmon Action Plan follows that for the River Tamar and River Lynher and is the third of seven action plans that will be produced for salmon rivers managed by the Cornwall Area FER department. The River Tavy SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery.
Resumo:
This is the River Yealm Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Yealm Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Yealm Salmon Action Plan follows the format of those completed for the rivers Tamar, Lynher, Tavy, Camel, Fowey and Plym. It is the final one of seven action plans that will be produced for salmon rivers managed by Cornwall Area. The River Yealm SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. Notably there are potable water abstractions in the headwaters, workings for china clay on the main tributary, two inert waste landfill sites and an aggregate quarry adjacent to the main river and inputs from several Sewage Treatment Works (STW) and two industrial estates. The main River Yealm has been designated as River Ecosystem Class 1 for its water quality objectives. This is the highest water quality target set for rivers.
Resumo:
This is the River Dart Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Dart Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The north of the River Dart catchment is included in the Dartmoor candidate Special Area of Conservation (cSAC), designated under the Council EC Directive 92/43/EEC, the “Habitats Directive”. One of the conservation objectives for the cSAC is to maintain the habitat for Atlantic Salmon, Salmo Salar in favourable condition. The River Dart is an important salmon, sea trout and brown trout fishery with no significant coarse fishery. However, eels are ubiquitous throughout the catchment and are lightly exploited. The River Dart SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery.