923 resultados para Construction Project Delivery
Resumo:
Construction planning plays a fundamental role in construction project management that requires team working among planners from a diverse range of disciplines and in geographically dispersed working situations. Model-based four-dimensional (4D) computer-aided design (CAD) groupware, though considered a possible approach to supporting collaborative planning, is still short of effective collaborative mechanisms for teamwork due to methodological, technological and social challenges. Targeting this problem, this paper proposes a model-based groupware solution to enable a group of multidisciplinary planners to perform real-time collaborative 4D planning across the Internet. In the light of the interactive definition method, and its computer-supported collaborative work (CSCW) design analysis, the paper discusses the realization of interactive collaborative mechanisms from software architecture, application mode, and data exchange protocol. These mechanisms have been integrated into a groupware solution, which was validated by a planning team in a truly geographically dispersed condition. Analysis of the validation results revealed that the proposed solution is feasible for real-time collaborative 4D planning to gain a robust construction plan through collaborative teamwork. The realization of this solution triggers further considerations about its enhancement for wider groupware applications.
Resumo:
Data from civil engineering projects can inform the operation of built infrastructure. This paper captures lessons for such data handover, from projects into operations, through interviews with leading clients and their supply chain. Clients are found to value receiving accurate and complete data. They recognise opportunities to use high quality information in decision-making about capital and operational expenditure; as well as in ensuring compliance with regulatory requirements. Providing this value to clients is a motivation for information management in projects. However, data handover is difficult as key people leave before project completion; and different data formats and structures are used in project delivery and operations. Lessons learnt from leading practice include defining data requirements at the outset, getting operations teams involved early, shaping the evolution of interoperable systems and standards, developing handover processes to check data rather than documentation, and fostering skills to use and update project data in operations
Resumo:
This paper explores the mapping of the environmental assessment process onto design and construction processes. A comparative case study method is used to identify and account for variations in the ‘fit’ between these two processes. The analysis compares eight BREEAM projects (although relevant to LEED, GreenStar, etc.) and distinguishes project-level characteristics and dynamics. Drawing on insights from literature on sustainable construction and assessment methods, an analytic framework is developed to examine the effect of clusters of project and assessment level elements on different types of fit (tight, punctual and bolt-on). Key elements distinguishing between types include: prior working experience with project team members, individual commitment to sustainable construction, experience with sustainable construction, project continuity, project-level ownership of the assessment process, and the nature and continuity of assessor involvement. Professionals with ‘sustainable’ experience used BREEAM judiciously to support their designs (along with other frameworks), but less committed professionals tended to treat it purely as an assessment method. More attention needs to be paid to individual levels of engagement with, and understanding of, sustainability in general (rather than knowledge of technical solutions to individual credits), to ownership of the assessment process and to the potential effect of discontinuities at the project level on sustainable design.
Resumo:
In order to overcome divergence of estimation with the same data, the proposed digital costing process adopts an integrated design of information system to design the process knowledge and costing system together. By employing and extending a widely used international standard, industry foundation classes, the system can provide an integrated process which can harvest information and knowledge of current quantity surveying practice of costing method and data. Knowledge of quantification is encoded from literatures, motivation case and standards. It can reduce the time consumption of current manual practice. The further development will represent the pricing process in a Bayesian Network based knowledge representation approach. The hybrid types of knowledge representation can produce a reliable estimation for construction project. In a practical term, the knowledge management of quantity surveying can improve the system of construction estimation. The theoretical significance of this study lies in the fact that its content and conclusion make it possible to develop an automatic estimation system based on hybrid knowledge representation approach.
Resumo:
In view of the limited number of drill holes, interpolation of the data becomes a relatively complex task. In this study, we sought to make estimates associated with lithological types, since a quantification based on lithology can be extracted from the empty spaces in the sampling. For example, QBarton is always below the median of the biotitic litotype, information which can be used in the elaboration of geostatistical models in situations where samples are lacking. To overcome bias in the data, required by geostatistical conceptualization, we worked with the residuals obtained from the adjustment of a surface and the observed values, for the variographic analysis. The final results made possible a more optimized evaluation of the final costs required for the construction project.
Resumo:
Pós-graduação em Geografia - IGCE
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Este proyecto desarrolla una metodología de toma de datos y análisis para la optimización de la producción de la fase de avance de construcción del túnel de Seiró. Este túnel forma parte de las obras de construcción de la línea ferroviaria de alta velocidad corredor norte-noroeste a su paso por la provincia de Ourense. Mediante el análisis de diversos parámetros del diseño de la voladura, en la construcción de un túnel de 73 m2 de sección, en roca granítica, se pretende optimizar el tiempo de ciclo de excavación. Se estudia la variación de la fragmentación, el contorno y el avance obtenido y la influencia sobre estos parámetros del esquema de tiro y el tipo de cuele empleados y sus repercusiones en el tiempo de ciclo. El resultado del análisis concluye que el esquema de tiro óptimo, entre los usados, está formado por 112 barrenos de 51 mm de diámetro, con un cuele de 4 barrenos vacíos, que da lugar a mejores resultados de avance, contorno y fragmentación sin afectar negativamente al tiempo de ciclo. ABSTRACT This project develops a methodology for excavation cycle optimization by collecting and analyzing operational data for Seiró Tunnel construction site. This tunnel is included in construction project of high speed railway, located in N-NW direction, in Ourense province. Analyzing several blasting design parameters from the construction of a 73 m2 tunnel, in granitic rock, allows the optimization of cycle time. Variations in fragmentation, contour and advance length and influence about those parameters from blasting design und cut type used and its impact in the cycle time. Analysis results show up the best blasting design, among used, is formed of 112 holes 51 mm diameter, and a parallel cut with 4 empty holes. This configuration achieves the best fragmentation, contour and advance length without negative effects in time cycle
Resumo:
Un proyecto de construcción de una estación de servicio requiere de un estudio de seguridad y salud para asegurar que los trabajos y tareas necesarios se realizan en las condiciones adecuadas, en cumplimiento al Real Decreto 1.627/1997, de 24 de Octubre, BOE número 256, 25 de Octubre de 1997 por el que se establecen disposiciones mínimas de seguridad y de salud en las obras de construcción. Dentro del procedimiento para realizar dicho estudio se procede a realizar una comprobación y enumeración de las distintas tareas que serán necesarias para la construcción, analizando el grado de riesgo que cada actividad presenta y, en función de estas, generar una serie de recomendaciones y normas para minimizar o eliminar dichos riesgos. Del estudio realizado se deduce que los trabajos presentan unos riesgos de baja probabilidad siempre que se mantenga un mínimo de atención y una actitud de prudencia y responsabilidad. ABSTRACT A service station construction project requires a safety and health study to ensure that necessary work and tasks are carried out in the right conditions, pursuant to Royal Decree 1.627/1997 of 24 October, BOE number 256, 25 October 1997 which establishes minimum requirements of safety and health in construction. Within the procedure to carry out this study proceeds to perform a check and enumeration of the various tasks which will be necessary for the construction, analyzing the degree of risk that each activity presents and, based on these, generating a series of recommendations and standards to minimize or eliminate these risks. From the study that has been done it can be determined that the work presents a low probability risks provided that a minimum of care and an attitude of prudence and responsibility..
Resumo:
Nos últimos anos, a discussão sobre a implementação do conceito de modelagem da informação da construção tem permanecido nas pautas das empresas do setor da construção civil em todo o mundo; no entanto, no cenário brasileiro, o descompasso entre a estratégia setorial e as iniciativas individuais de algumas empresas tem chamado a atenção. Partindo do princípio de que o conceito de modelagem da informação da construção, em função do seu caráter de inovação tecnológica, carrega consigo a necessidade de mudanças, a reflexão e adaptações sobre os diversos processos que permeiam a produção dos empreendimentos de construção torna-se fundamental. Nesse contexto, o objetivo desta tese é propor um conjunto de Diretrizes para Gestão do Processo de Projeto em Empresas Incorporadoras e Construtoras. As Diretrizes estão pautadas na necessidade de definir o projeto como um processo estratégico, inserindo a sua gestão como elemento fundamental para a facilitação e integração do fluxo de informações no âmbito do empreendimento. Para a concretização do objetivo da tese, realizaram-se Estudos de Caso em empresas Incorporadoras e Construtoras brasileiras com o objetivo de diagnosticar as práticas vigentes de gestão do processo de projeto. Em paralelo, conduziu-se a reflexão sobre as responsabilidades do gestor do processo de projeto no âmbito da modelagem por meio de Grupos de Foco envolvendo gestores do processo de projeto e especialistas em tecnologia da informação aplicada à construção. Além disso, a metodologia de pesquisa contempla um Estudo de Caso com foco para a implementação do Conceito de Modelagem da Informação no contexto setorial do Reino Unido. Como resultado das Diretrizes, apresenta-se o Modelo para Gestão do Processo de Projeto no Contexto da Modelagem, seguido pelo Plano de Reestruração para o Departamento de Projetos, o qual visa à proposição de um modelo estruturado para condução das mudanças necessárias nas áreas responsáveis pelo processo de projeto das empresas Incorporadoras e Construtoras.
Resumo:
Whole life costing (WLC) has become the best practice in construction procurement and it is likely to be a major issue in predicting whole life costs of a construction project accurately. However, different expectations from different organizations throughout a project's life and the lack of data, monitoring targets, and long-term interest for many key players are obstacles to be overcome if WLC is to be implemented. A questionnaire survey was undertaken to investigate a set of ten common factors and 188 individual factors. These were grouped into eight critical categories (project scope, time, cost, quality, contract/administration, human resource, risk, and health and safety) by project phase, as perceived by the clients, contractors and subcontractors in order to identify critical success factors for whole life performance assessment (WLPA). Using a relative importance index, the top ten critical factors for each category, from the perspective of project participants, were analyzed and ranked. Their agreement on those categories and factors were analyzed using Spearman's rank correlation. All participants identify “Type of Project” as the most common critical factor in the eight categories for WLPA. Using the relative index ranking technique and weighted average methods, it was found that the most critical individual factors in each category were: “clarity of contract” (scope); “fixed construction period” (time); “precise project budget estimate” (cost); “material quality” (quality); “mutual/trusting relationships” (contract/administration); “leadership/team management” (human resource); and “management of work safety on site” (health and safety). There was relatively a high agreement on these categories among all participants. Obviously, with 80 critical factors of WLPA, there is a stronger positive relationship between client and contactor rather than contractor and subcontractor, client and subcontractor. Putting these critical factors into a criteria matrix can facilitate an initial framework of WLPA in order to aid decision making in the public sector in South Korea for evaluation/selection process of a construction project at the bid stage.
Resumo:
The aim of this research was to improve the quantitative support to project planning and control principally through the use of more accurate forecasting for which new techniques were developed. This study arose from the observation that in most cases construction project forecasts were based on a methodology (c.1980) which relied on the DHSS cumulative cubic cost model and network based risk analysis (PERT). The former of these, in particular, imposes severe limitations which this study overcomes. Three areas of study were identified, namely growth curve forecasting, risk analysis and the interface of these quantitative techniques with project management. These fields have been used as a basis for the research programme. In order to give a sound basis for the research, industrial support was sought. This resulted in both the acquisition of cost profiles for a large number of projects and the opportunity to validate practical implementation. The outcome of this research project was deemed successful both in theory and practice. The new forecasting theory was shown to give major reductions in projection errors. The integration of the new predictive and risk analysis technologies with management principles, allowed the development of a viable software management aid which fills an acknowledged gap in current technology.
Resumo:
World-wide efforts have been made to adopt BIM (Building Information Modelling) to improve the efficiency of construction project management processes lively. BIM means a shared digitized expression which provides a reliable source to make an informed decision over a physical or a functional character across all construction sectors including design, civil engineering and plant construction. The Korean Public Procurement Service mandates to use BIM for over 50 billion won public construction projects from 2012, and this will be extended to every project initiated by the Korean Public Procurement Service from 2016. This paper aims not only to investigate potential barriers which can be faced at the initial stage of BIM adoption, but also to explore possible solutions against them. For doing this, the BIM utilization strategies and action plans by US and UK public sectors which adopt BIM earlier than Korea were analysed. Based on the results of comparative analysis between US and UK, the proper guideline for BIM adoption in Korea will be suggested.
Resumo:
This research has developed a framework to improve the effectiveness and efficiency of stakeholder involvement during the early planning stages of residential construction projects, in order to improve many of the quality issues that occur during the construction phases of such projects. A mixed methods approach (survey, interviews and case studies) was employed to collect the required data. It is expected that with development, this framework can bring some significant benefits to future construction projects in terms of reducing rework and wastage, improving timely delivery and avoiding disputes. The research is also anticipated to produce three high impact journal articles.
Resumo:
The Sydney Opera House Facilities Management Exemplar Project (SOH FM Exemplar Project) aims to develop innovative research on facility management (FM) with the focus on asset maintenance. The project utilises the Sydney Opera House (SOH), one of most unique buildings in Australia, to research and create innovative FM strategies and models that will have a direct beneficial role for the Australian facilities management industry as well as the economy as a whole. The procurement, benchmarking and digitisation are crucial in improving the performance of FM. The procurement develops strategic plan and deployment framework enabling products, services, etc. meet objectives of performance, economic, environment, etc. Benchmarking is a technology used to compare practice and assess performance against the competitors recognised as industry leaders who achieve most successful activities in the field. Digitisation develops digitized FM modelling that facilitates the integration and automation of facility management. The project carries out the research on all the three areas as well as the relationship between them. It aims to develop an integrated approach for the improvement of FM performance.