991 resultados para test facility
Resumo:
Includes index.
Resumo:
"14 December 1973."
Resumo:
"1 February 1986."
Resumo:
Mode of access: Internet.
Resumo:
This thesis describes the design and engineering of a pressurised biomass gasification test facility. A detailed examination of the major elements within the plant has been undertaken in relation to specification of equipment, evaluation of options and final construction. The retrospective project assessment was developed from consideration of relevant literature and theoretical principles. The literature review includes a discussion on legislation and applicable design codes. From this analysis, each of the necessary equipment units was reviewed and important design decisions and procedures highlighted and explored. Particular emphasis was placed on examination of the stringent demands of the ASME VIII design codes. The inter-relationship of functional units was investigated and areas of deficiency, such as biomass feeders and gas cleaning, have been commented upon. Finally, plant costing was summarized in relation to the plant design and proposed experimental programme. The main conclusion drawn from the study is that pressurised gasification of biomass is far more difficult and expensive to support than atmospheric gasification. A number of recommendations have been made regarding future work in this area.
Resumo:
The capacitor test process at ABB Capacitors in Ludvika must be improved to meet future demands for high voltage products. To find a solution to how to improve the test process, an investigation was performed to establish which parts of the process are used and how they operate. Several parts which can improves the process were identified. One of them was selected to be improved in correlation with the subject, mechanical engineering. Four concepts were generated and decision matrixes were used to systematically select the best concept. By improving the process several benefits has been added to the process. More units are able to be tested and lead time is reduced. As the lead time is reduced the cost for each unit is reduced, workers will work less hours for the same amount of tested units, future work to further improve the process is also identified. The selected concept was concept 1, the sway stop concept. This concept is used to reduce the sway of the capacitors as they have entered the test facility, the box. By improving this part of the test process a time saving of 20 seconds per unit can be achieved, equivalent to 7% time reduction. This can be compared to an additional 1400 units each year.
Resumo:
A test and demonstration facility for PV and PV hybrid systems and system components has been designed and installed at Dalarna University in Sweden. The facility allows studies of complete PV systems or single components in a range of 0.1-10 kW. The facility includes two grid-connected PV systems, a PV Hybrid off-grid system, three emulators and the necessary measurement and control equipment. Tests can be done manually or automatically through programmed test procedures controlled that will be implemented in Labview. The facility shall be used by researchers, professionals of the industry and engineering students.
Resumo:
Dynamic system test methods for heating systems were developed and applied by the institutes SERC and SP from Sweden, INES from France and SPF from Switzerland already before the MacSheep project started. These test methods followed the same principle: a complete heating system – including heat generators, storage, control etc., is installed on the test rig; the test rig software and hardware simulates and emulates the heat load for space heating and domestic hot water of a single family house, while the unit under test has to act autonomously to cover the heat demand during a representative test cycle. Within the work package 2 of the MacSheep project these similar – but different – test methods were harmonized and improved. The work undertaken includes: • Harmonization of the physical boundaries of the unit under test. • Harmonization of the boundary conditions of climate and load. • Definition of an approach to reach identical space heat load in combination with an autonomous control of the space heat distribution by the unit under test. • Derivation and validation of new six day and a twelve day test profiles for direct extrapolation of test results. The new harmonized test method combines the advantages of the different methods that existed before the MacSheep project. The new method is a benchmark test, which means that the load for space heating and domestic hot water preparation will be identical for all tested systems, and that the result is representative for the performance of the system over a whole year. Thus, no modelling and simulation of the tested system is needed in order to obtain the benchmark results for a yearly cycle. The method is thus also applicable to products for which simulation models are not available yet. Some of the advantages of the new whole system test method and performance rating compared to the testing and energy rating of single components are: • Interaction between the different components of a heating system, e.g. storage, solar collector circuit, heat pump, control, etc. are included and evaluated in this test. • Dynamic effects are included and influence the result just as they influence the annual performance in the field. • Heat losses are influencing the results in a more realistic way, since they are evaluated under "real installed" and representative part-load conditions rather than under single component steady state conditions. The described method is also suited for the development process of new systems, where it replaces time-consuming and costly field testing with the advantage of a higher accuracy of the measured data (compared to the typically used measurement equipment in field tests) and identical, thus comparable boundary conditions. Thus, the method can be used for system optimization in the test bench under realistic operative conditions, i.e. under relevant operating environment in the lab. This report describes the physical boundaries of the tested systems, as well as the test procedures and the requirements for both the unit under test and the test facility. The new six day and twelve day test profiles are also described as are the validation results.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
CO2 capture from gaseous effluents is one of the great challenges faced by chemical and environmental engineers, as the increase in CO2 levels in the Earth atmosphere might be responsible for dramatic climate changes. From the existing capture technologies, the only proven and mature technology is chemical absorption using aqueous amine solutions. However, bearing in mind that this process is somewhat expensive, it is important to choose the most efficient and, at the same time, the least expensive solvents. For this purpose, a pilot test facility was assembled and includes an absorption column, as well as a stripping column, a heat exchanger between the two columns, a reboiler for the stripping column, pumping systems, surge tanks and all necessary instrumentation and control systems. Some different aquous amine solutions were tested on this facility and it was found that, from a set of six tested amines, diethanol amine is the one that turned out to be the most economical choice, as it showed a higher CO2 loading capacity (0.982 mol of CO2 per mol of amine) and the lowest price per litre (25.70 ¤/L), even when compared with monoethanolamine, the benchmark solvent, exhibiting a price per litre of 30.50 ¤/L.
Resumo:
Abdominal Aortic Aneurysms (AAA) haemorhaging is a life-threatening disease. An aneurysm is a permanent swelling of an artery due to a weakness in its wall. Current surgical repair involves opening the chest or abdomen, gaining temporary vascular control of the aorta and suturing a prosthetic graft to the healthy aorta within the aneurysm itself The outcome of this surgical approach is not perfect, and the quality of life after this repair is impaired by postoperative pain, sexual dysfunction, and a lengthy hospital stay resulting in high health costs. All these negative effects are related to the large incision and extensive tissue dissection. Endovascular grafting is an alternative to the standard surgical method. This treatment is a less invasive method of treating aortic aneurysms. It involves a surgical exposure of the common femoral arteries where the stent graft can be inserted through by an over-the-wire technique. All manipulations are controlled from a remote place by the use of a catheter and this technique avoids the need to directly expose the diseased artery through a large incision or an extensive dissection. The proposed design method outlined in this project is to develop the endovascular approach. The main aim is to design an unitary bifurcated stent graft (1 e- bifurcated graft as a single component) to treat these Abdominal Aortic Aneurysms. This includes the delivery system and deployment mechanism necessary to first accurately position the stent graft across the aneurysm sac and also across the iliac bifurcation, and secondly fix the stent graft in position by using expandable metal stents. Thus, excluding the aneurysm from the circulation and therefore preventing rupture. Miniaturisation is a critical aspect of this design, as the smaller the crimped stent graft the easier to guide through the vascular system to the desired location. Biocompatibility is an important aspect. The preferred materials for this prosthesis are to use Shape Memory Alloys for the stent and a multifilament fabric for the graft. A taper design is applied for the geometry as this gives a favourable flow characteristic and reduced wave reflections. Adequate testing of the stent graft to prove its durability and the ease of the method of deployment is a prerequisite. A bench test facility has being designed and build to replicate the cardiovascular system and the disease in question aortic aneurysms at the iliac bifurcation. The testing here shows the feasibility of the proposed delivery system and the durability of the stent graft across the aneurysm sac. Finally, these endovascular treatments offer the economic advantage of short hospital stays or even treatment as an outpatient, as well as elimination of the need for postoperative intensive care The risk of developing an aneurysm increases with age, that is one of the mam reasons to look for less invasive ways of treating aneurysms. Consequently, there is enormous pressure to develop and use these devices rapidly.