917 resultados para stakeholder management


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Construction projects can involve a diverse range of stakeholders and the success of the project depends very much on fulfilling their needs and expectations. It is important, therefore, to identify and recognize project stakeholders and develop a rigorous stakeholder management process. However, limited research has investigated the impact of stakeholders on construction projects in developing countries. A stakeholder impact analysis (SIA), based on an approach developed by Olander (2007), was adopted to investigate the stakeholders' impact on state-owned civil engineering projects in Vietnam. This involved the analysis of a questionnaire survey of 57 project managers to determine the relative importance of different stakeholders. The results show the client to have the highest level of impact on the projects, followed by project managers and the senior management of state-owned engineering firms. The SIA also provides suggestions to project managers in developing and evaluating the stakeholder management process.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This research has developed a framework to improve the effectiveness and efficiency of stakeholder involvement during the early planning stages of residential construction projects, in order to improve many of the quality issues that occur during the construction phases of such projects. A mixed methods approach (survey, interviews and case studies) was employed to collect the required data. It is expected that with development, this framework can bring some significant benefits to future construction projects in terms of reducing rework and wastage, improving timely delivery and avoiding disputes. The research is also anticipated to produce three high impact journal articles.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The purpose of this thesis is to identify areas for improvement in the current stakeholder management literature. The current stakeholder management theories were analyzed to determine their benefits and detriments. To determine how these theories work in a corporation, General Motors was selected as a single-case study to determine the patterns of stakeholder management over time. These patterns demonstrated the need for dynamic stakeholder management over time, with an emphasis on collaboration and the necessity of recognizing the greater stakeholder network surrounding the corporation. Proper stakeholder management in the early years of General Motors would have prevented its failure, while the organizational culture as a path-dependent variable made it difficult for General Motors to alter long-standing stakeholder relationships.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Construction teams and construction organisations have their own distinctive cultures. There also exists an infrastructure, both social and contractual, which ensures that these projects within which the teams operate are completed successfully. It is these issues which this research has addressed. The project was instigated by Queensland Department of Main Roads, Public Works and John Holland Group in order to address how they might better implement relationship management (RM) on their construction projects. The project was devised initially in order to facilitate a change in culture which would allow the project to be run in a relational manner and would lead to effective performance in terms of the KPIs that the organisations set for themselves, described as business better than usual. This report describes the project, its outcomes and deliverable and indicates the changes that were made to the project during the research process. Hence, the initial premise of the project and the problem to investigate was the implementation of relational contracting: • throughout a range of projects; • with a focus on client body staff. The additions that were made to the project, and documented in the variations to the project, included two major additional areas of study: • client management and stakeholder management; • a live case study of an alliancing project. The context within which the research was undertaken is important. The research was driven by main roads with their desire to improve their operations by focusing on the relationship between the major project participants (however, stakeholder and client organisation management became an obvious issue as the research progressed, hence the variations). The context was initially focussed on main roads, public works and John Holland group organisations but it became clear very quickly that this was in fact an industry-wide issue and not an issue specific solely to the project participants. Hence, the context within which this research took place can be described as below: The deliverables from the project are a toolkit for determining RM needs in an organisation, a monograph describing the practical implementation of RM and the outline for a RM CPD and Masters course

Relevância:

70.00% 70.00%

Publicador:

Resumo:

A research study was conducted in a key area of project management: stakeholder and relationship management through communication - ‘the soft skills’. It was conducted with Diploma of Project Management graduates from one Australian Registered Training Organisation (RTO), the Australian College of Project Management (ACPM). The study was designed to initially identify the qualifications and project management experience of the participants. Further, it identified the respondents’ understanding of and attitude to commonly held principles and literature within the project management field as it relates to the soft skills of projects. This is specifically connected to their project experience and knowledge, approach to project communications, and the stakeholder’s needs. Some of the literature showed that through the management and application of the project soft skills by project managers may actually be a recipe for project success. Hence, an important underpinning of this study was that the project manager can enhance project success (or reduce the impact of failure) by identifying and prioritising stakeholders, developing and implementing strategies for engaging and communicating with them. The use of a positivist approach to this research study allowed for the evaluation and understanding of respondents to the emergent theories of successful projects being delivered through the management of stakeholders, communications, and relationships. Consequently, a quantitative approach to this study was undertaken. The participants were drawn from graduates who completed (graduated) from the ACPM with the Diploma of Project Management between January 2004 and December 2007 only. A list of graduates was collated from this period indicating that a total of 656 graduates have completed and graduated with the qualification. The data collection for this study was done in one phase only. The questionnaire was emailed individually by the researcher directly to the selected potential respondents. Subsequently, a total of 44 responses were received, providing an overall response rate of 43%. Two key factors emerged from the survey questionnaire. Firstly, the need for the soft skills to be incorporated in project management curriculum and education programs, and secondly, that successful projects are delivered through the management and application of the project soft skills. It is expected that the findings of this study be provided across various forums (such as vocational education and training, and project management conferences) and via project management bodies such as the Australian Institute of Project Management (AIPM) to inform learning and provide greater insight into the soft skills of project management. It is the contention of the researcher that this quantitative study of Diploma of Project Management graduates’ views and attitudes highlights the importance of project soft skills and its importance in the delivery of successful projects as well as being part of the competencies of a successful project manager. This study also revealed the value of project experience and knowledge as it pertains to the management and application of the project soft skills.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

As the problems involving infrastructure delivery have become more complex and contentious, there has been an acknowledgement that these problems cannot be resolved by any one body working alone. This understanding has driven multi-sectoral collaboration and has led to an expansion of the set of actors, including stakeholders, who are now involved in delivery of infrastructure projects and services. However, more needs to be understood about how to include stakeholders in these processes and ways of developing the requisite combination of stakeholders to achieve effective outcomes. This thesis draws on stakeholder theory and governance network theory to obtain insights into how three multi-level networks within the Roads Alliance in Queensland engage with stakeholders in the delivery of complex and sensitive infrastructure services and projects. New knowledge about stakeholders will be obtained by testing a model of Stakeholder Salience and Engagement which combines and extends the stakeholder identification and salience theory, ladder of stakeholder management and engagement and the model of stakeholder engagement and moral treatment of stakeholders. By applying this model, the broad research question: “Who or what decides how stakeholders are engaged by governance networks delivering public outcomes?” will be addressed. The case studies will test a theoretical model of stakeholder salience and engagement which links strategic decisions about stakeholder salience with the quality and quantity of engagement strategies for engaging different types of stakeholders. A multiple embedded case study design has been selected as the overall approach to explore, describe, explain and evaluate how stakeholder engagement occurs in three governance networks delivering road infrastructure in Queensland. The research design also incorporates a four stage approach to data collection: observations, stakeholder analysis, telephone survey questionnaire and semi-structured interviews. The outcomes of this research will contribute to and extend stakeholder theory by showing how stakeholder salience impacts on decisions about the types of engagement processes implemented. Governance network theory will be extended by showing how governance networks interact with stakeholders through the concepts of stakeholder salience and engagement. From a practical perspective this research will provide governance networks with an indication of how to optimise engagement with different types of stakeholders. 2

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Delivering infrastructure projects involves many stakeholders. Their responsibilities and authorities vary over the course of the project lifecycle - from establishing the project parameters and performance requirements, to operating and maintaining the completed infrastructure. To ensure the successful delivery of infrastructure projects, it is important for the project management team to identify and manage the stakeholders and their requirements. This chapter discusses the management of stakeholders in delivering infrastructure projects, from their conception to completion. It includes managing the stakeholders for project selection and involving them to improve project constructability, operability and maintainability.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Public awareness of large infrastructure projects, many of which are delivered through networked arrangements is high for several reasons. These projects often involve significant public investment; they may involve multiple and conflicting stakeholders and can potentially have significant environmental impacts (Lim and Yang, 2008). To produce positive outcomes from infrastructure delivery it is imperative that stakeholder “buy in” be obtained particularly about decisions relating to the scale and location of infrastructure. Given the likelihood that stakeholders will have different levels of interest and investment in project outcomes, failure to manage this dynamic could potentially jeopardise project delivery by delaying or halting the construction of essential infrastructure. Consequently, stakeholder engagement has come to constitute a critical activity in infrastructure development delivered through networks. This paper draws on stakeholder theory and governance network theory and provides insights into how three multi-level networks within the Roads Alliance in Queensland engage with stakeholders in the delivery of road infrastructure. New knowledge about stakeholders has been obtained by testing a model of Stakeholder Salience and Engagement which combines and extends the stakeholder identification and salience theory and the ladder of stakeholder management and engagement. By applying this model, the broad research question: “How do governance networks engage with stakeholders?” has been addressed. A multiple embedded case study design was selected as the overall approach to explore, describe, explain and evaluate how stakeholder engagement occurred in three governance networks delivering road infrastructure in Queensland. The outcomes of this research contribute to and extend stakeholder theory by showing how stakeholder salience impacts on decisions about the types of engagement processes implemented. Governance network theory is extended by showing how governance networks interact with stakeholders. From a practical perspective this research provides governance networks with an indication of how to more effectively undertake engagement with different types of stakeholders.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

In this paper, we develop two stakeholder relationships scales. These scales assess project managers’ perceived competence in establishing and maintaining high quality, effective relationships with people internal to the project as well as those stakeholders who are external to the project. We developed the scales using an online survey study of three hundred and seventy three complex project managers from a sub-set of the Australian Defence Industry. Both the internal stakeholder relationships’ scale and the external stakeholder relationships’ scale demonstrated validity and reliability. This research has implications for the interpersonal work relationships’ literature and the stakeholder management literature. We recommend future research tests these scales with multiple samples, across different project types and project industries. The stakeholder relationships’ scales should be versatile enough to be applied to project management generally but are best suited to large-scale complex project environments.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

In this paper, we detail the development of two stakeholder relationships scales. The scales measure major project managers' perceived competence in developing (establishing and maintaining) high quality, effective relationships with stakeholders who are internal and external to their organization. Our sample consists of 373 major project managers from a sub-set of the Australian defense industry. Both the internal stakeholder relationships scale and the external stakeholder relationships scale demonstrated validity and reliability. This research has implications for the interpersonal work relationships literature and the stakeholder management literature. We recommend that researchers test these scales with multiple samples, across different project types and project industries in the future. The stakeholder relationship scales should be versatile enough to be applied to project management generally but are perhaps best suited to major project environments.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Large construction projects create numerous hazards, making it one of the most dangerous industries in which to work. This element of risk increases in urban areas and can have a negative impact on the external stakeholders associated with the project, along with their surrounding environments. The aim of this paper is to identify and document, in an urban context, the numerous issues encountered by on-site project managers from external stakeholders and how they affect a construction project. In addressing this aim, the core objective is to identify what issues are involved in the management of these stakeholders. In order to meet this requirement, a qualitative methodology encompassing an informative literature review followed by five individual case study interviews. The data gathered is assessed qualitatively using mind mapping software. A number of issues are identified which have an impact on the external stakeholders involved, and also how they affected proceedings on site. Collectively the most commonly occurring issues are environmental, legal, health and safety and communication issues. These ranged from road closures and traffic disruption to noise, dust and vibrations from site works. It is anticipated that the results of this study will assist and aid project managers in identifying issues considering external stakeholders, particularly on urban construction projects. A wide range of issues can develop depending on the complexity and nature of each project, but this research will illustrate and reinforce to project managers, that identifying issues early, effective communication and appropriate liaising can be used to manage the issues considering external stakeholders.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Purpose – While Freeman's stakeholder management approach has attracted much attention from both scholars and practitioners, little empirical work has considered the interconnectedness of organisational perspectives and stakeholder perspectives. The purpose of this paper is to respond to this gap by developing and empirically testing a bi-directional model of organisation/stakeholder relationships. Design/methodology/approach – A conceptual framework is developed that integrates how stakeholders are affected by organisations with how they affect organisations. Quantitative data relating to both sides of the relationship are obtained from 700 customers of a European service organisation and analysed using partial least squares structural equation modelling technique. Findings – The findings provide empirical support for the notion of mutual dependency between organisations and stakeholders as advocated by stakeholder theorists. The results suggest that the way stakeholders relate to organisations is dependent on how organisations relate to stakeholders. Originality/value – The study is original on two fronts: first, it provides a framework and process that can be used by researchers to model bi-directional research with other stakeholder groups and in different contexts. Second, the study presents an example application of bi-directional research by empirically linking organisational and stakeholder expectations in the case of customers of a UK service organisation.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Green supply chain management and environmental and ethical behaviour (EEB), a major component of corporate responsibility (CR), are rapidly developing fields in research and practice. The influence and effect of EEB at the functional level, however, is under-researched. Similarly, the management of risk in the supply chain has become a practical concern for many firms. It is important that managers have a good understanding of the risks associated with supplier partnerships. This paper examines the effect of firms’ investment in EEB as part of corporate social responsibility in mediating the relationship between supply chain partnership (SCP) and management appreciation of the risk of partnering. We hypothesise that simply entering into a SCP does not facilitate an appreciation of the risk of partnering and may even hamper such awareness. However, such an appreciation of the risk is facilitated through CR’s environmental and stakeholder management ethos. The study contributes further by separating risk into distinct relational and performance components. The results of a firm-level survey confirm the mediation effect, highlighting the value to supply chain strategy and design of investing in EEB on three fronts: building internal awareness, monitoring and sharing best practice.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Briefing phase interactions between clients and designers are recognized as social engagements, characterized by communicative sign use, where conceptual ideas are gradually transformed into potential design solutions. A semiotic analysis of briefing communications between client stakeholders and designers provides evidence of the significance and importance of stakeholder interpretation and understanding of design, empirical data being drawn from a qualitative study of NHS hospital construction projects in the UK. It is contended that stakeholders engage with a project through communicative signs and artefacts of design, referencing personal cognitive knowledge in acts of interpretation that may be different from those of designers and externally appointed client advisers. Such interpretations occur in addition to NHS client and design team efforts to ‘engage’ with and ‘understand’ stakeholders using a variety of methods. Social semiotic theorizations indicate how narrative strategies motivate the formulation of signs and artefacts in briefing work, the role of sign authors and sign readers being elucidated as a result. Findings are contextualized against current understandings of briefing communications and stakeholder management practices, a more socially attuned understanding of briefing countering some of the process-led improvement models that have characterized much of the post-Egan report literature. A stakeholder interpretation model is presented as one potential method to safeguard against unforeseen interpretations occurring, the model aligning with the proposal for a more measured recognition of how designs can trigger interpretations among client stakeholders.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This chapter introduces a conceptual model to combine creativity techniques with fuzzy cognitive maps (FCMs) and aims to support knowledge management methods by improving expert knowledge acquisition and aggregation. The aim of the conceptual model is to represent acquired knowledge in a manner that is as computer-understandable as possible with the intention of developing automated reasoning in the future as part of intelligent information systems. The formal represented knowledge thus may provide businesses with intelligent information integration. To this end, we introduce and evaluate various creativity techniques with a list of attributes to define the most suitable to combine with FCMs. This proposed combination enables enhanced knowledge management through the acquisition and representation of expert knowledge with FCMs. Our evaluation indicates that the creativity technique known as mind mapping is the most suitable technique in our set. Finally, a scenario from stakeholder management demonstrates the combination of mind mapping with FCMs as an integrated system.