952 resultados para hydro-electric
Resumo:
1908 and 1909 reports issued in combined form.
Resumo:
"No. 36"--Volume IV.
Resumo:
We present a simulator of a hydropower company’s view of its scheme, and its broader market and network context, which has been developed to evaluate advanced displays for control room operations. Although simplified, the simulator captures all the main aspects of scheme operations. The simulator allows controlled studies to be performed that test the effectiveness of current vs advanced display concepts under normal vs unexpected operating conditions that can be scripted into the simulator.
Resumo:
We present the design rationale and basic workings of a low-cost, easy-to-use power system simulator developed to support investigations into human interface design for a hydropower plant. The power system simulator is based on three important components: models of power system components, a data repository, and human interface elements. Dynamic Data Exchange (DDE) allows simulator components to communicate with each other within the simulator. To construct the modules of the simulator we have combined the advantages of commercial software such as Matlab/Simulink, ActiveX Control, Visual Basic and Excel and integrated them in the simulator. An important advantage of our approach is that further components of the simulator now can be developed independently. An initial assessment of the simulator indicates it is fit for intended purpose.
Resumo:
Physical control of water hyacinth consists of removing the plants from the water by hand or machines. It is considered over effetive because it involves removing the whole plants from water. The first attempt on physical control was in 1992 when weed infestation was causing serious problems to the fishing communities in Lake Kyoga. The fishermen had problems of accessing the lake as huge masses of mobile weed blocked landing sites. Furthermore, the fishers lost their nets, which were swept away by mobile water hyacinth. As a result, an integrated control strategy involving physical control (manual and mechanical removal) was put in place. Through this method, the fishers were able to open up access routes to fishing grounds even though weed mats often reblocked the access routes. In the infested lakes, manual removal offered remedial relief to fish Iandings and other access sites. Sites of strategic importance such as hydro-electric power generation dam, water intake points and docking points which had large masses of water hyacinth required heavy machinery and mechanical harvesters were used at these sites.
Resumo:
Mode of access: Internet.
Resumo:
In this paper, a mixed-integer nonlinear approach is proposed to support decision-making for a hydro power producer, considering a head-dependent hydro chain. The aim is to maximize the profit of the hydro power producer from selling energy into the electric market. As a new contribution to earlier studies, a risk aversion criterion is taken into account, as well as head-dependency. The volatility of the expected profit is limited through the conditional value-at-risk (CVaR). The proposed approach has been applied successfully to solve a case study based on one of the main Portuguese cascaded hydro systems.
Resumo:
This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning a head-dependent hydro chain We propose a novel mixed-integer nonlinear programming (MINLP) approach, considering hydroelectric power generation as a nonlinear function of water discharge and of the head. As a new contribution to eat her studies, we model the on-off behavior of the hydro plants using integer variables, in order to avoid water discharges at forbidden areas Thus, an enhanced STHS is provided due to the more realistic modeling presented in this paper Our approach has been applied successfully to solve a test case based on one of the Portuguese cascaded hydro systems with a negligible computational time requirement.
Resumo:
Electric vehicles (EV) offer a great potential to address the integration of renewable energy sources (RES) in the power grid, and thus reduce the dependence on oil as well as the greenhouse gases (GHG) emissions. The high share of wind energy in the Portuguese energy mix expected for 2020 can led to eventual curtailment, especially during the winter when high levels of hydro generation occur. In this paper a methodology based on a unit commitment and economic dispatch is implemented, and a hydro-thermal dispatch is performed in order to evaluate the impact of the EVs integration into the grid. Results show that the considered 10 % penetration of EVs in the Portuguese fleet would increase load in 3 % and would not integrate a significant amount of wind energy because curtailment is already reduced in the absence of EVs. According to the results, the EV is charged mostly with thermal generation and the associated emissions are much higher than if they were calculated based on the generation mix.
Resumo:
The integration of Plug-in electric vehicles in the transportation sector has a great potential to reduce oil dependency, the GHG emissions and to contribute for the integration of renewable sources into the electricity generation mix. Portugal has a high share of wind energy, and curtailment may occur, especially during the off-peak hours with high levels of hydro generation. In this context, the electric vehicles, seen as a distributed storage system, can help to reduce the potential wind curtailments and, therefore, increase the integration of wind power into the power system. In order to assess the energy and environmental benefits of this integration, a methodology based on a unit commitment and economic dispatch is adapted and implemented. From this methodology, the thermal generation costs, the CO2 emissions and the potential wind generation curtailment are computed. Simulation results show that a 10% penetration of electric vehicles in the Portuguese fleet would increase electrical load by 3% and reduce wind curtailment by only 26%. This results from the fact that the additional generation required to supply the electric vehicles is mostly thermal. The computed CO2 emissions of the EV are 92 g CO2/kWh which become closer to those of some new ICE engines.
Resumo:
Based on the report for the unit “Métodos Interactivos de Participação e Decisão A” (Interactive methods of participation and decision A), coordinated by Prof. Lia Maldonado Teles de Vasconcelos and Prof. Nuno Miguel Ribeiro Videira Costa. This unit was provided for the PhD Program in Technology Assessment in 2015/2016.
Resumo:
This paper presents a nonlinear model with individual representation of plants for the centralized long-term hydrothermal scheduling problem over multiple areas. In addition to common aspects of long-term scheduling, this model takes transmission constraints into account. The ability to optimize hydropower exchange among multiple areas is important because it enables further minimization of complementary thermal generation costs. Also, by considering transmission constraints for long-term scheduling, a more precise coupling with shorter horizon schedules can be expected. This is an important characteristic from both operational and economic viewpoints. The proposed model is solved by a sequential quadratic programming approach in the form of a prototype system for different case studies. An analysis of the benefits provided by the model is also presented. ©2009 IEEE.
Resumo:
Synchronous machines with brushless excitation have the disadvantage that the field winding is not accessible for the de-excitation of the machine. This means that, despite the proper operation of the protection system, the slow de-excitation time constant may produce severe damage in the event of an internal short circuit. A high-speed de-excitation system for these machines was developed, and this study presents the continuation of a previously published study. This study presents the design by computer simulation and the results of the first commissioning of this de-excitation system in a commercial 20 MVA hydro-generator. The de-excitation is achieved by inserting resistance in the field circuit, obtaining a dynamic response similar to that achieved in machines with static excitation. In this case, a non-linear discharge resistor was used, making the dynamic response even better.
Resumo:
A karyotype analysis of the electric eel, Electrophorus electricus (Teleostei, Gymnotiformes), a strongly electric fish from northern South America, is presented. Two female specimens were analyzed, one from the Amazon River and one from the Araguaia River. The specimens had a chromosomal number of 2n = 52 (42M-SM + 10A). C-bands were present in a centromeric and pericentromeric position on part of the chromosomes; some interstitial C-bands were also present. Heteromorphic nucleolus organizer regions (NORs) were detected in two chromosome pairs of the specimen from the Amazon River. The chromosome number and karyotype characteristics are similar to those of other Gymnotidae species. The genera Electrophorus and Gymnotus are positioned as the basal lineages in the Gymnotiformes phylogeny.
Resumo:
In the last decades there was an increase in stress at work and its effects on workers' health. These issues are still little studied in the electric utility sector. This study aims to evaluate factors associated with stress at work and to verify its associations with health status among workers of an electric company in São Paulo State, Brazil. A cross-sectional study was conducted with 474 subjects (87.5% of the eligible workers). Data were collected using self-reported questionnaires. A descriptive analysis, a multiple linear hierarchical regression analysis and a correlation analysis were performed. The majority of participants were males (91.1%) and the mean age was 37.5 yr. The mean score of stress level was 2.3 points (scale ranging from 1.0 to 5.0). Hierarchical multiple analyses showed that: regular practice of physical activities (p=0.025) and individual monthly income (p=0.002) were inversely associated with stress level; BMI was marginally associated with the stress level (p=0.074). The demographic characteristics were not associated with stress. Stress at work was significantly associated with physical and mental health status (p<0.001). To improve health of electric utility workers, actions are suggested to decrease stress by remuneration and an appropriate practice of physical activity aiming reduction of BMI