922 resultados para economic analysis of law
Resumo:
The construction sector has one of the worst occupational safety and health records in Europe. The costs of this scenario are very high, namely costs for workers and their families, costs to organizations, resulting from the absence of workers due to illness, insurance premiums, costs resulting from reduced productivity, cost of replacement and training of workers, etc., and costs to society, which in turn increases the costs of health systems. This paper presents and discusses the development of a methodology for economic evaluation in the context of risk management, which will allow senior management to support decision making. The possible application of this methodology to the construction sector is discussed.
Resumo:
Work accidents affect business and society as a whole. Fewer accidents mean fewer sick leaves, which results in lower costs and less disruption in the production process, with clear advantages for the employer. But workers and their households bear also a significant burden following a work accident, only partially compen-sated by insurance systems. Furthermore, the consequences of work accidents to the State and Society need also to be considered. When an organization performs an integrated risk analysis in evaluating its Occupational Health and Safety Management System, several steps are suggested to address the identified risk situations. Namely, to avoid risks, a series of preventive measures are identified. The organization should make a detailed analysis of the monetary impact (positive or negative) for the organization of each of the measures considered. Particularly, it is also important to consider the impact of each measure on society, involving an adequate eco-nomic cost-benefit analysis. In the present paper, a case study in a textile finishing company is presented. The study concentrates on the dyeing and printing sections. For each of the potential risks, several preventive measures have been identified and the corresponding costs and benefits have been estimated. Subsequently, the Benefit/Cost ratio (B/C) of these measures has been calculated, both in financial terms (from the organisa-tion’s perspective) and in economic terms (including the benefits for the worker and for the Society). Results show that, while the financial analysis in terms of the company does not justify the preventive measures, when the externalities are taken into account, the B/C ratio increases significantly and investments are fully justified.
Resumo:
This paper discusses the financial and economic analysis of prevention of needlestick accidents related to Occupational Health and Safety projects and presents the application to a case study involving a Hospital.
Resumo:
There are many circumstances in which the effectiveness of preventive measures depends to a large extent on the compliance of the patient in changing his or her behavior or lifestyle. It is shown how economic techniques can be used (i) to describe the rationale of individuals and predict their behavior (Section 2); and (ii) to assess preventive measures that, by requiring a change of conduct, imply "costs" to the individual due to a decline in the quality of life (Appendix). Cigarette smoking and coronary heart disease are used as an illustration. While the analysis of Section 2 uses graphical techniques, a simple textbook-type of lifetime utility model with a mathematical emphasis is used in the Appendix. It is also shown that techniques often used to assess health care programs such as the QALYs (Quality-Adjusted Life Years) are inappropriate to the evaluation of preventive programs aiming at behavioral changes. Finally, topics that call for further research are indicated.
Resumo:
OBJECTIVE To analyze the incremental cost-utility ratio for the surgical treatment of hip fracture in older patients.METHODS This was a retrospective cohort study of a systematic sample of patients who underwent surgery for hip fracture at a central hospital of a macro-region in the state of Minas Gerais, Southeastern Brazil between January 1, 2009 and December 31, 2011. A decision tree creation was analyzed considering the direct medical costs. The study followed the healthcare provider’s perspective and had a one-year time horizon. Effectiveness was measured by the time elapsed between trauma and surgery after dividing the patients into early and late surgery groups. The utility was obtained in a cross-sectional and indirect manner using the EuroQOL 5 Dimensions generic questionnaire transformed into cardinal numbers using the national regulations established by the Center for the Development and Regional Planning of the State of Minas Gerais. The sample included 110 patients, 27 of whom were allocated in the early surgery group and 83 in the late surgery group. The groups were stratified by age, gender, type of fracture, type of surgery, and anesthetic risk.RESULTS The direct medical cost presented a statistically significant increase among patients in the late surgery group (p < 0.005), mainly because of ward costs (p < 0.001). In-hospital mortality was higher in the late surgery group (7.4% versus 16.9%). The decision tree demonstrated the dominance of the early surgery strategy over the late surgery strategy: R$9,854.34 (USD4,387.17) versus R$26,754.56 (USD11,911.03) per quality-adjusted life year. The sensitivity test with extreme values proved the robustness of the results.CONCLUSIONS After controlling for confounding variables, the strategy of early surgery for hip fracture in the older adults was proven to be dominant, because it presented a lower cost and better results than late surgery.
Resumo:
The objective of this work was to evaluate the economic viability of an agrosilvipastoral system developed for Zona da Mata mountainous areas in Minas Gerais state, Brazil, as well as to compare different options for wood (Eucalyptus grandis and Acacia mangium) commercialization of the second thinning. The data were obtained from a 10 year-old agrosilvipastoral system established in four hectares at Embrapa Gado de Leite station in Coronel Pacheco, MG, Brazil. As evaluation criteria for the economic viability analysis, the adopted methods were the net present value (NPV) and the internal rate of return (IRR), both calculated at 6% interest rate. Despite the small difference, adding value to forest products increased the attractiveness of the proposed system. Considered separately, the agricultural activity was impracticable, whereas the forestry and livestock activities were independently viable. The studied system seems to be equally tolerant to price variations for forest and livestock products, as well as strongly tolerant to variations in production costs.
Resumo:
The amount of installed wind power has been growing exponentially during the past ten years. As wind turbines have become a significant source of electrical energy, the interactions between the turbines and the electric power network need to be studied more thoroughly than before. Especially, the behavior of the turbines in fault situations is of prime importance; simply disconnecting all wind turbines from the network during a voltage drop is no longer acceptable, since this would contribute to a total network collapse. These requirements have been a contributor to the increased role of simulations in the study and design of the electric drive train of a wind turbine. When planning a wind power investment, the selection of the site and the turbine are crucial for the economic feasibility of the installation. Economic feasibility, on the other hand, is the factor that determines whether or not investment in wind power will continue, contributing to green electricity production and reduction of emissions. In the selection of the installation site and the turbine (siting and site matching), the properties of the electric drive train of the planned turbine have so far been generally not been taken into account. Additionally, although the loss minimization of some of the individual components of the drive train has been studied, the drive train as a whole has received less attention. Furthermore, as a wind turbine will typically operate at a power level lower than the nominal most of the time, efficiency analysis in the nominal operating point is not sufficient. This doctoral dissertation attempts to combine the two aforementioned areas of interest by studying the applicability of time domain simulations in the analysis of the economicfeasibility of a wind turbine. The utilization of a general-purpose time domain simulator, otherwise applied to the study of network interactions and control systems, in the economic analysis of the wind energy conversion system is studied. The main benefits of the simulation-based method over traditional methods based on analytic calculation of losses include the ability to reuse and recombine existing models, the ability to analyze interactions between the components and subsystems in the electric drive train (something which is impossible when considering different subsystems as independent blocks, as is commonly done in theanalytical calculation of efficiencies), the ability to analyze in a rather straightforward manner the effect of selections other than physical components, for example control algorithms, and the ability to verify assumptions of the effects of a particular design change on the efficiency of the whole system. Based on the work, it can be concluded that differences between two configurations can be seen in the economic performance with only minor modifications to the simulation models used in the network interaction and control method study. This eliminates the need ofdeveloping analytic expressions for losses and enables the study of the system as a whole instead of modeling it as series connection of independent blocks with no lossinterdependencies. Three example cases (site matching, component selection, control principle selection) are provided to illustrate the usage of the approach and analyze its performance.
Resumo:
The type of artificial light used for inducing photoperiod effect in begonia's seedlings at greenhouse has fundamental importance in the growth and development of these plants and directly reflects in the electrical energy consumption used in this production process. The objective of this research was to analyze the technical and economic feasibility of replacing the current technology of artificial lighting used by the producers (incandescent lamps), by the technology of discharge lamps with the purpose of inducing photoperiod in a greenhouse. The analysis results indicate that the discharge lamp of 32 W Tubular Fluorescent discharge lamp was the one that presented the lower peak demand and lower average energy consumption of 85.01% compared to incandescent filament lamp of 100 W that is the technology of bigger consumption and currently used by the producer.
Resumo:
This experiment was conducted in Lavras - state of Minas Gerais (MG), Brazil, in a protected environment, and aims to estimate the irrigation depths that maximize productivity and economic returns in the cultivation of asparagus bean and analyze the economic viability of irrigation management. The experimental delineation was randomized blocks with five treatments and four replications. The treatments consisted of five drip irrigation depths: 40, 70, 100, 130 and 160% of water replacement depth up to field capacity. The depths of water that maximize productivity and economic returns were obtained from the regression model adjusted to productivity data, cost of product relations and water cost. The economic viability was achieved on the benefit/cost ratio basis. The depth with the maximum economic return was estimated in 434.4mm, with a productivity of 35,160.6kg ha-1, which is economically viable for the cultivation of asparagus bean, with a expected profitability of R$ 1.70 for every real invested.
Resumo:
Water and fertilizer among the production factors are the elements that most restrict the production of cashew. The precise amount of these factors is essential to the success of the crop yield. This research aimed to determine the best factor-product ratio and analyze technical and economic indicators, of productivity of the cashew clone BRS 189 (Anacardium occidentale) to production factors water and potassium. The experiment was conducted from May 2009 to December 2009 in an experimental area of 56.0 m x 112.0 m in the irrigated Curu - Pentecoste, located in the municipality of Pentecoste, Ceará, Brazil. Production factors water (W) and potassium (K) were the independent variables and productivity (Y), the dependent variable. Ten statistical models that have proven satisfactory for obtaining production function were tested. The marginal rate of substitution was obtained through the ratio of the potassium marginal physical product and the water marginal physical product. The most suited model to the conditions of the experiment was the quadratic polynomial without intercept and interaction. Considering that the price of the water was 0.10 R$ mm -1, the price of the potassium 2.19 R$ kg -1 and the price of the cashew 0.60 R$ kg-1, the amounts of water and K2O to obtain the maximum net income were 6,349.1 L plant-1 of water and 128.7 g plant -1year, -1 respectively. Substituting the values obtained in the production function, the maximum net income was achieved with a yield of 7,496.8 kg ha-1 of cashew.
Resumo:
ABSTRACT Broiler poultry is highly dependent on artificial lightening. Power consumption costs of artificial lighting systems is the second largest expense related to broiler industry, second only to feed expenses. Therefore, the current study focused to analyze technical and economic feasibility of replacing incandescent lamps already used in aviaries with other lamp types. Costs related to power consumption, implementation and maintenance of the lighting systems were evaluated with the aid of financial mathematics using net present value, return over investment and payback. Systems composed of six lamp types were analyzed in two different configurations to meet the minimum illuminance of 5 and 20 lux and for use in conventional sheds and dark house. The lamps tested were incandescent (LI) of 100 W, compact fluorescent (CFL) of 34 W, mixed (ML) 160 W sodium vapor (SVL) of 70 W, tubular fluorescent T8 (TFL T8) of 40 W and tubular fluorescent T5 (TFL T5) of 28 W. For the systems tested, it was found that the tubular fluorescent lamps T8 and T5 showed the best results of technical and economic feasibility.
Resumo:
Transmission system operators and distribution system operators are experiencing new challenges in terms of reliability, power quality, and cost efficiency. Although the potential of energy storages to face those challenges is recognized, the economic implications are still obscure, which introduce the risk into the business models. This thesis aims to investigate the technical and economic value indicators of lithium-ion battery energy storage systems (BESS) in grid-scale applications. In order to do that, a comprehensive performance lithium-ion BESS model with degradation effects estimation is developed. The model development process implies literature review on lifetime modelling, use, and modification of previous study progress, building the additional system parts and integrating it into a complete tool. The constructed model is capable of describing the dynamic behavior of the BESS voltage, state of charge, temperature and capacity loss. Five control strategies for BESS unit providing primary frequency regulation are implemented, in addition to the model. The questions related to BESS dimensioning and the end of life (EoL) criterion are addressed. Simulations are performed with one-month real frequency data acquired from Fingrid. The lifetime and cost-benefit analysis of the simulation results allow to compare and determine the preferable control strategy. Finally, the study performs the sensitivity analysis of economic profitability with variable size, EoL and system price. The research reports that BESS can be profitable in certain cases and presents the recommendations.
Resumo:
Rapport de recherche