941 resultados para cost-informed process execution
Resumo:
Electricity distribution network operation (NO) models are challenged as they are expected to continue to undergo changes during the coming decades in the fairly developed and regulated Nordic electricity market. Network asset managers are to adapt to competitive technoeconomical business models regarding the operation of increasingly intelligent distribution networks. Factors driving the changes for new business models within network operation include: increased investments in distributed automation (DA), regulative frameworks for annual profit limits and quality through outage cost, increasing end-customer demands, climatic changes and increasing use of data system tools, such as Distribution Management System (DMS). The doctoral thesis addresses the questions a) whether there exist conditions and qualifications for competitive markets within electricity distribution network operation and b) if so, identification of limitations and required business mechanisms. This doctoral thesis aims to provide an analytical business framework, primarily for electric utilities, for evaluation and development purposes of dedicated network operation models to meet future market dynamics within network operation. In the thesis, the generic build-up of a business model has been addressed through the use of the strategicbusiness hierarchy levels of mission, vision and strategy for definition of the strategic direction of the business followed by the planning, management and process execution levels of enterprisestrategy execution. Research questions within electricity distribution network operation are addressed at the specified hierarchy levels. The results of the research represent interdisciplinary findings in the areas of electrical engineering and production economics. The main scientific contributions include further development of the extended transaction cost economics (TCE) for government decisions within electricity networks and validation of the usability of the methodology for the electricity distribution industry. Moreover, DMS benefit evaluations in the thesis based on the outage cost calculations propose theoretical maximum benefits of DMS applications equalling roughly 25% of the annual outage costs and 10% of the respective operative costs in the case electric utility. Hence, the annual measurable theoretical benefits from the use of DMS applications are considerable. The theoretical results in the thesis are generally validated by surveys and questionnaires.
Resumo:
This master thesis presents a study on the requisite cooling of an activated sludge process in paper and pulp industry. The energy consumption of paper and pulp industry and it’s wastewater treatment plant in particular is relatively high. It is therefore useful to understand the wastewater treatment process of such industries. The activated sludge process is a biological mechanism which degrades carbonaceous compounds that are present in waste. The modified activated sludge model constructed here aims to imitate the bio-kinetics of an activated sludge process. However, due to the complicated non-linear behavior of the biological process, modelling this system is laborious and intriguing. We attempt to find a system solution first using steady-state modelling of Activated Sludge Model number 1 (ASM1), approached by Euler’s method and an ordinary differential equation solver. Furthermore, an enthalpy study of paper and pulp industry’s vital pollutants was carried out and applied to revise the temperature shift over a period of time to formulate the operation of cooling water. This finding will lead to a forecast of the plant process execution in a cost-effective manner and management of effluent efficiency. The final stage of the thesis was achieved by optimizing the steady state of ASM1.
Resumo:
The complexity of construction projects and the fragmentation of the construction industry undertaking those projects has effectively resulted in linear, uncoordinated and highly variable project processes in the UK construction sector. Research undertaken at the University of Salford resulted in the development of an improved project process, the Process Protocol, which considers the whole lifecycle of a construction project whilst integrating its participants under a common framework. The Process Protocol identifies the various phases of a construction project with particular emphasis on what is described in the manufacturing industry as the ‘fuzzy front end’. The participants in the process are described in terms of the activities that need to be undertaken in order to achieve a successful project and process execution. In addition, the decision-making mechanisms, from a client perspective, are illustrated and the foundations for a learning organization/industry are facilitated within a consistent Process Protocol.
Resumo:
The self-evaluation is increasingly necessary in a competitive environment, and a way for companies to self-evaluate is through your budget. Knowing the importance of this budgetary process, this study aimed to observe and analyze the developing process of a zero-based budgeting (ZBB) highlighting its best practices and difficulties and propose recommendations for other companies in general. This goal was achieved through a case study in an area responsible for the budgeting process in the customer services department from a white-goods company. Also was required to review the literature regarding the customer services area, waste reduction, cost management, budgets in general and the zero-based budgeting. After reviewing the literature and the study, we can highlight good practices and difficulties observed in the studied company, and also propose recommendations on how to develop a zero-based budget and evidence what plans, analyzes and justifications are essential in a good budget process execution
Resumo:
IT has turned out to be a key factor for the purposes of gaining maturity in Business Process Management (BPM). This book presents a worldwide investigation that was conducted among companies from the ‘Forbes Global 2000’ list to explore the current usage of software throughout the BPM life cycle and to identify the companies’ requirements concerning process modelling. The responses from 130 companies indicate that, at the present time, it is mainly software for process description and analysis that is required, while process execution is supported by general software such as databases, ERP systems and office tools. The resulting complex system landscapes give rise to distinct requirements for BPM software, while the process modelling requirements can be equally satisfied by the most common languages (BPMN, UML, EPC).
Resumo:
In this Master’s Thesis a new Distributed Award Protocol (DAP) for robot communication and cooperation is presented. Task assignment (contract awarding) is done dynamically with contracts assigned to robots based upon the best bid received. Instead of having a manager and a contractor it is proposed a fully distributed bidding/awarding mechanism without a distinguished master. The best bidding robots are awarded with contract for execution. The contractors make decisions locally. This brings the following benefits: no communication bottleneck, low computational power requirement, increased robustness. DAP can handle multitasking. Tasks can be injected into system during the execution of already allocated tasks. As tasks have priorities, in the next cycle after taking into account actual bid parameters of all robots, tasks can be re-allocated. The aim is to minimize a global cost function which is a compromise between cost of task execution and cost of resources usage. Information about tasks and bid values is spread among robots with the use of a Round Robin Route, which is a novel solution proposed in this work. This method allows also identifying failed robots. Such failed robot is eliminated from the list of awarded robots and its replacement is found so the task is still executed by a team. If the failure of a robot was temporary (e.g. communication noise) and the robot can recover, it can again participate in the next bidding/awarding process. Using a bidding/awarding mechanism allows robots to dynamically relocate among tasks. This is also contributes to system robustness. DAP was evaluated through multiple experiments done in the multi-robot simulation system. Various scenarios were tested to check the idea of the main algorithm. Different failures of robots (communication failures, partial hardware malfunctions) were simulated and observations were made regarding how DAP recovers from them. Also the DAP flexibility to environment changes was watched. The experiments in the simulated environment confirmed the above features of DAP.
Resumo:
El objetivo de la presente investigación es el desarrollo de un modelo de cálculo rápido, eficiente y preciso, para la estimación de los costes finales de construcción, en las fases preliminares del proyecto arquitectónico. Se trata de una herramienta a utilizar durante el proceso de elaboración de estudios previos, anteproyecto y proyecto básico, no siendo por tanto preciso para calcular el “predimensionado de costes” disponer de la total definición grafica y literal del proyecto. Se parte de la hipótesis de que en la aplicación práctica del modelo no se producirán desviaciones superiores al 10 % sobre el coste final de la obra proyectada. Para ello se formulan en el modelo de predimensionado cinco niveles de estimación de costes, de menor a mayor definición conceptual y gráfica del proyecto arquitectónico. Los cinco niveles de cálculo son: dos que toman como referencia los valores “exógenos” de venta de las viviendas (promoción inicial y promoción básica) y tres basados en cálculos de costes “endógenos” de la obra proyectada (estudios previos, anteproyecto y proyecto básico). El primer nivel de estimación de carácter “exógeno” (nivel .1), se calcula en base a la valoración de mercado de la promoción inmobiliaria y a su porcentaje de repercusión de suelo sobre el valor de venta de las viviendas. El quinto nivel de valoración, también de carácter “exógeno” (nivel .5), se calcula a partir del contraste entre el valor externo básico de mercado, los costes de construcción y los gastos de promoción estimados de la obra proyectada. Este contraste entre la “repercusión del coste de construcción” y el valor de mercado, supone una innovación respecto a los modelos de predimensionado de costes existentes, como proceso metodológico de verificación y validación extrínseca, de la precisión y validez de las estimaciones resultantes de la aplicación práctica del modelo, que se denomina Pcr.5n (Predimensionado costes de referencia con .5niveles de cálculo según fase de definición proyectual / ideación arquitectónica). Los otros tres niveles de predimensionado de costes de construcción “endógenos”, se estiman mediante cálculos analíticos internos por unidades de obra y cálculos sintéticos por sistemas constructivos y espacios funcionales, lo que se lleva a cabo en las etapas iniciales del proyecto correspondientes a estudios previos (nivel .2), anteproyecto (nivel .3) y proyecto básico (nivel .4). Estos cálculos teóricos internos son finalmente evaluados y validados mediante la aplicación práctica del modelo en obras de edificación residencial, de las que se conocen sus costes reales de liquidación final de obra. Según va evolucionando y se incrementa el nivel de definición y desarrollo del proyecto, desde los estudios previos hasta el proyecto básico, el cálculo se va perfeccionando en su nivel de eficiencia y precisión de la estimación, según la metodología aplicada: [aproximaciones sucesivas en intervalos finitos], siendo la hipótesis básica como anteriormente se ha avanzado, lograr una desviación máxima de una décima parte en el cálculo estimativo del predimensionado del coste real de obra. El cálculo del coste de ejecución material de la obra, se desarrolla en base a parámetros cúbicos funcionales “tridimensionales” del espacio proyectado y parámetros métricos constructivos “bidimensionales” de la envolvente exterior de cubierta/fachada y de la huella del edificio sobre el terreno. Los costes funcionales y constructivos se ponderan en cada fase del proceso de cálculo con sus parámetros “temáticos/específicos” de gestión (Pg), proyecto (Pp) y ejecución (Pe) de la concreta obra presupuestada, para finalmente estimar el coste de construcción por contrata, como resultado de incrementar al coste de ejecución material el porcentaje correspondiente al parámetro temático/especifico de la obra proyectada. El modelo de predimensionado de costes de construcción Pcr.5n, será una herramienta de gran interés y utilidad en el ámbito profesional, para la estimación del coste correspondiente al Proyecto Básico previsto en el marco técnico y legal de aplicación. Según el Anejo I del Código Técnico de la Edificación (CTE), es de obligado cumplimiento que el proyecto básico contenga una “Valoración aproximada de la ejecución material de la obra proyectada por capítulos”, es decir , que el Proyecto Básico ha de contener al menos un “presupuesto aproximado”, por capítulos, oficios ó tecnologías. El referido cálculo aproximado del presupuesto en el Proyecto Básico, necesariamente se ha de realizar mediante la técnica del predimensionado de costes, dado que en esta fase del proyecto arquitectónico aún no se dispone de cálculos de estructura, planos de acondicionamiento e instalaciones, ni de la resolución constructiva de la envolvente, por cuanto no se han desarrollado las especificaciones propias del posterior proyecto de ejecución. Esta estimación aproximada del coste de la obra, es sencilla de calcular mediante la aplicación práctica del modelo desarrollado, y ello tanto para estudiantes como para profesionales del sector de la construcción. Como se contiene y justifica en el presente trabajo, la aplicación práctica del modelo para el cálculo de costes en las fases preliminares del proyecto, es rápida y certera, siendo de sencilla aplicación tanto en vivienda unifamiliar (aisladas y pareadas), como en viviendas colectivas (bloques y manzanas). También, el modelo es de aplicación en el ámbito de la valoración inmobiliaria, tasaciones, análisis de viabilidad económica de promociones inmobiliarias, estimación de costes de obras terminadas y en general, cuando no se dispone del proyecto de ejecución y sea preciso calcular los costes de construcción de las obras proyectadas. Además, el modelo puede ser de aplicación para el chequeo de presupuestos calculados por el método analítico tradicional (estado de mediciones pormenorizadas por sus precios unitarios y costes descompuestos), tanto en obras de iniciativa privada como en obras promovidas por las Administraciones Públicas. Por último, como líneas abiertas a futuras investigaciones, el modelo de “predimensionado costes de referencia 5 niveles de cálculo”, se podría adaptar y aplicar para otros usos y tipologías diferentes a la residencial, como edificios de equipamientos y dotaciones públicas, valoración de edificios históricos, obras de urbanización interior y exterior de parcela, proyectos de parques y jardines, etc….. Estas lineas de investigación suponen trabajos paralelos al aquí desarrollado, y que a modo de avance parcial se recogen en las comunicaciones presentadas en los Congresos internacionales Scieconf/Junio 2013, Rics‐Cobra/Septiembre 2013 y en el IV Congreso nacional de patología en la edificación‐Ucam/Abril 2014. ABSTRACT The aim of this research is to develop a fast, efficient and accurate calculation model to estimate the final costs of construction, during the preliminary stages of the architectural project. It is a tool to be used during the preliminary study process, drafting and basic project. It is not therefore necessary to have the exact, graphic definition of the project in order to be able to calculate the cost‐scaling. It is assumed that no deviation 10% higher than the final cost of the projected work will occur during the implementation. To that purpose five levels of cost estimation are formulated in the scaling model, from a lower to a higher conceptual and graphic definition of the architectural project. The five calculation levels are: two that take as point of reference the ”exogenous” values of house sales (initial development and basic development), and three based on calculation of endogenous costs (preliminary study, drafting and basic project). The first ”exogenous” estimation level (level.1) is calculated over the market valuation of real estate development and the proportion the cost of land has over the value of the houses. The fifth level of valuation, also an ”exogenous” one (level.5) is calculated from the contrast between the basic external market value, the construction costs, and the estimated development costs of the projected work. This contrast between the ”repercussions of construction costs” and the market value is an innovation regarding the existing cost‐scaling models, as a methodological process of extrinsic verification and validation, of the accuracy and validity of the estimations obtained from the implementation of the model, which is called Pcr.5n (reference cost‐scaling with .5calculation levels according to the stage of project definition/ architectural conceptualization) The other three levels of “endogenous” construction cost‐scaling are estimated from internal analytical calculations by project units and synthetic calculations by construction systems and functional spaces. This is performed during the initial stages of the project corresponding to preliminary study process (level.2), drafting (level.3) and basic project (level.4). These theoretical internal calculations are finally evaluated and validated via implementation of the model in residential buildings, whose real costs on final payment of the works are known. As the level of definition and development of the project evolves, from preliminary study to basic project, the calculation improves in its level of efficiency and estimation accuracy, following the applied methodology: [successive approximations at finite intervals]. The basic hypothesis as above has been made, achieving a maximum deviation of one tenth, in the estimated calculation of the true cost of predimensioning work. The cost calculation for material execution of the works is developed from functional “three‐dimensional” cubic parameters for the planned space and constructive “two dimensional” metric parameters for the surface that envelopes around the facade and the building’s footprint on the plot. The functional and building costs are analyzed at every stage of the process of calculation with “thematic/specific” parameters of management (Pg), project (Pp) and execution (Pe) of the estimated work in question, and finally the cost of contractual construction is estimated, as a consequence of increasing the cost of material execution with the percentage pertaining to the thematic/specific parameter of the projected work. The construction cost‐scaling Pcr.5n model will be a useful tool of great interest in the professional field to estimate the cost of the Basic Project as prescribed in the technical and legal framework of application. According to the appendix of the Technical Building Code (CTE), it is compulsory that the basic project contains an “approximate valuation of the material execution of the work, projected by chapters”, that is, that the basic project must contain at least an “approximate estimate” by chapter, trade or technology. This approximate estimate in the Basic Project is to be performed through the cost‐scaling technique, given that structural calculations, reconditioning plans and definitive contruction details of the envelope are still not available at this stage of the architectural project, insofar as specifications pertaining to the later project have not yet been developed. This approximate estimate of the cost of the works is easy to calculate through the implementation of the given model, both for students and professionals of the building sector. As explained and justified in this work, the implementation of the model for cost‐scaling during the preliminary stage is fast and accurate, as well as easy to apply both in single‐family houses (detached and semi‐detached) and collective housing (blocks). The model can also be applied in the field of the real‐estate valuation, official appraisal, analysis of the economic viability of real estate developments, estimate of the cost of finished projects and, generally, when an implementation project is not available and it is necessary to calculate the building costs of the projected works. The model can also be applied to check estimates calculated by the traditional analytical method (state of measurements broken down into price per unit cost details), both in private works and those promoted by Public Authorities. Finally, as potential lines for future research, the “five levels of calculation cost‐scaling model”, could be adapted and applied to purposes and typologies other than the residential one, such as service buildings and public facilities, valuation of historical buildings, interior and exterior development works, park and garden planning, etc… These lines of investigation are parallel to this one and, by way of a preview, can be found in the dissertations given in the International Congresses Scieconf/June 2013, Rics‐Cobra/September 2013 and in the IV Congress on building pathology ‐Ucam/April 2014.
Resumo:
A ciência tem feito uso frequente de recursos computacionais para execução de experimentos e processos científicos, que podem ser modelados como workflows que manipulam grandes volumes de dados e executam ações como seleção, análise e visualização desses dados segundo um procedimento determinado. Workflows científicos têm sido usados por cientistas de várias áreas, como astronomia e bioinformática, e tendem a ser computacionalmente intensivos e fortemente voltados à manipulação de grandes volumes de dados, o que requer o uso de plataformas de execução de alto desempenho como grades ou nuvens de computadores. Para execução dos workflows nesse tipo de plataforma é necessário o mapeamento dos recursos computacionais disponíveis para as atividades do workflow, processo conhecido como escalonamento. Plataformas de computação em nuvem têm se mostrado um alternativa viável para a execução de workflows científicos, mas o escalonamento nesse tipo de plataforma geralmente deve considerar restrições específicas como orçamento limitado ou o tipo de recurso computacional a ser utilizado na execução. Nesse contexto, informações como a duração estimada da execução ou limites de tempo e de custo (chamadas aqui de informações de suporte ao escalonamento) são importantes para garantir que o escalonamento seja eficiente e a execução ocorra de forma a atingir os resultados esperados. Este trabalho identifica as informações de suporte que podem ser adicionadas aos modelos de workflows científicos para amparar o escalonamento e a execução eficiente em plataformas de computação em nuvem. É proposta uma classificação dessas informações, e seu uso nos principais Sistemas Gerenciadores de Workflows Científicos (SGWC) é analisado. Para avaliar o impacto do uso das informações no escalonamento foram realizados experimentos utilizando modelos de workflows científicos com diferentes informações de suporte, escalonados com algoritmos que foram adaptados para considerar as informações inseridas. Nos experimentos realizados, observou-se uma redução no custo financeiro de execução do workflow em nuvem de até 59% e redução no makespan chegando a 8,6% se comparados à execução dos mesmos workflows sendo escalonados sem nenhuma informação de suporte disponível.
Resumo:
In the last decade, with the expansion of organizational scope and the tendency for outsourcing, there has been an increasing need for Business Process Integration (BPI), understood as the sharing of data and applications among business processes. The research efforts and development paths in BPI pursued by many academic groups and system vendors, targeting heterogeneous system integration, continue to face several conceptual and technological challenges. This article begins with a brief review of major approaches and emerging standards to address BPI. Further, we introduce a rule-driven messaging approach to BPI, which is based on the harmonization of messages in order to compose a new, often cross-organizational process. We will then introduce the design of a temporal first order language (Harmonized Messaging Calculus) that provides the formal foundation for general rules governing the business process execution. Definitions of the language terms, formulae, safety, and expressiveness are introduced and considered in detail.
Resumo:
ACM Computing Classification System (1998): D.0, D.2.11.
Resumo:
The wastes occurred during the harvest cause a hard impact in the agricultural business. About the soy fields, recent researches indicate that half of this waste could be avoided, reducing the cost of production and resultant earning of the companies. The purpose of this article is to analyze the estimative of soy harvest field area of 2006/07 to 2007/08 and respective production, subsidy estimate the waste that could be avoided during the harvest, considerating tolerable levels of 60 Kg by hectare, accordant is the model adopted on USA e Brazil. This research was based in a bibliographic study to explain and analyze all sides, practical and theoretical around the investigate problem. It was checked that is possible expect and avoid these wastes during the harvest. Such wastes overcome the mark of 20,000 ton/year, that in money talks represent over R$ 1.000.000 mil/year. Conclude however that wastes when treated provide a production cost reduction, indicating execution and a positive impact on agricultural companies` earnings.
Resumo:
Na atualidade, devido à situação económico-financeira existente e à elevada competitividade de mercado, é fundamental que as empresas possam produzir o máximo, utilizando para isso o mínimo de recursos disponíveis, eliminando qualquer forma de desperdício que ocorra no seu processo. Por estas razões, são cada vez mais as empresas que seguem a filosofia Lean, orientando toda a sua estrutura produtiva no sentido de obter zero desperdícios, sem interferir com a qualidade do produto final. Com a elaboração deste trabalho, pretende-se fazer uma análise do processo produtivo do setor dos Tratamentos Térmicos, da empresa F. Ramada, identificando os desperdícios que ocorrem ao longo do processo e desenvolver um plano de ações de melhoria, utilizando para isso as ferramentas da metodologia Lean. Em primeiro lugar, fez-se uma análise do processo produtivo, onde foram identificados alguns pontos de melhoria e recolhidos os primeiros dados para uma análise mais aprofundada de cada problema. Posteriormente, estabeleceu-se um plano de ações para eliminar ou minimizar os desperdícios encontrados no processo e procedeu-se à implementação das melhorias. Após a implementação das melhorias, fez-se uma avaliação das mesmas e constatou-se, em todos os casos, uma redução dos desperdícios no processo produtivo (tempos de execução, consumo dos materiais e nos transportes).
Resumo:
A dot-ELISA was developed for the detection of antibodies in CSF in the immunologic diagnosis of human neurocysticercosis, using antigen extracts of the membrane and scolex of Cysticercus cellulosae (M+S-Cc) and, alternately, membrane (M) and vesicular fluid (VF) of Cysticercus longicollis (Cl) covalently bound to a new solid phase consisting of polyester fabric treated with N-methylol-acrylamide resin (dot-RT). The test was performed at room temperature, with reduced incubation times and with no need for special care in the manipulation of the support. The sensitivity rates obtained were 95.1% for antigen Cc and 97.6% for antigen Cl. Specificity was 90.6% when Cc was used, and 96.9% and 100% when M-Cl and VF-Cl were used, respectively. No significant differences in titer were observed between tests carried out with homologous and heterologous antigens. The low cost and easy execution of the dot-RT test using antigen extracts of Cysticercus longicollis indicate the test for use in the immunodiagnosis of human neurocysticercosis.
Resumo:
Bacteria are central to human health and disease, but existing tools to edit microbial consortia are limited. For example, broad-spectrum antibiotics are unable to precisely manipulate bacterial communities. Bacteriophages can provide highly specific targeting of bacteria, but assembling well-defined phage cocktails solely with natural phages can be a time-, labor- and cost-intensive process. Here, we present a synthetic biology strategy to modulate phage host ranges by engineering phage genomes in Saccharomyces cerevisiae. We used this technology to redirect Escherichia coli phage scaffolds to target pathogenic Yersinia and Klebsiella bacteria, and conversely, Klebsiella phage scaffolds to target E. coli by modular swapping of phage tail components. The synthetic phages achieved efficient killing of their new target bacteria and were used to selectively remove bacteria from multi-species bacterial communities with cocktails based on common viral scaffolds. We envision this approach accelerating phage biology studies and enabling new technologies for bacterial population editing.
Resumo:
The relevance of the building sector in the global energy use as well as in the global carbon emissions, both in the developed and developing countries, makes the improvement of the overall energy performance of existing buildings an important part of the actions to mitigate climate changes. Regardless of this potential for energy and emissions saving, large scale building renovation has been found hard to trigger, mainly because present standards are mainly focused on new buildings, not responding effectively to the numerous technical, functional and economic constraints of the existing ones. One of the common problems in the assessment of building renovation scenarios is that only energy savings and costs are normally considered, despite the fact that it has been long recognized that investment on energy efficiency and low carbon technologies yield several benefits beyond the value of saved energy which can be as important as the energy cost savings process. Based on the analysis of significant literature and several case studies, the relevance of co-benefits achieved in the renovation process is highlighted. These benefits can be felt at the building level by the owner or user (like increased user comfort, fewer problems with building physics, improved aesthetics) and should therefore be considered in the definition of the renovation measures, but also at the level of the society as a whole (like health effects, job creation, energy security, impact on climate change), and from this perspective, policy makers must be aware of the possible crossed impacts among different areas of the society for the development of public policies.