882 resultados para cost estimation accuracy


Relevância:

100.00% 100.00%

Publicador:

Resumo:

A generic, hierarchical, and multifidelity unit cost of acquisition estimating methodology for outside production machined parts is presented. The originality of the work lies with the method’s inherent capability of being able to generate multilevel and multifidelity cost relations for large volumes of parts utilizing process, supply chain costing data, and varying degrees of part design definition information. Estimates can be generated throughout the life cycle of a part using different grades of the combined information available. Considering design development for a given part, additional design definition may be used as it becomes available within the developed method to improve the quality of the resulting estimate. Via a process of analogous classification, parts are classified into groups of increasing similarity using design-based descriptors. A parametric estimating method is then applied to each subgroup of the machined part commodity in the direction of improved classification and using which, a relationship which links design variables to manufacturing cycle time may be generated. A rate cost reflective of the supply chain is then applied to the cycle time estimate for a given part to arrive at an estimate of make cost which is then totalled with the material and treatments cost components respectively to give an overall estimate of unit acquisition cost. Both the rate charge applied and the treatments cost calculated for a given procured part is derived via the use of ratio analysis.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The present study is intended to provide a new scientific approach to the solution of the worlds cost engineering problems encountered in the chemical industries in our nation. The problem is that of cost estimation of equipments especially of pressure vessels when setting up chemical industries .The present study attempts to develop a model for such cost estimation. This in turn is hoped would go a long way to solve this and related problems in forecasting the cost of setting up chemical plants.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Parametric software effort estimation models consisting on a single mathematical relationship suffer from poor adjustment and predictive characteristics in cases in which the historical database considered contains data coming from projects of a heterogeneous nature. The segmentation of the input domain according to clusters obtained from the database of historical projects serves as a tool for more realistic models that use several local estimation relationships. Nonetheless, it may be hypothesized that using clustering algorithms without previous consideration of the influence of well-known project attributes misses the opportunity to obtain more realistic segments. In this paper, we describe the results of an empirical study using the ISBSG-8 database and the EM clustering algorithm that studies the influence of the consideration of two process-related attributes as drivers of the clustering process: the use of engineering methodologies and the use of CASE tools. The results provide evidence that such consideration conditions significantly the final model obtained, even though the resulting predictive quality is of a similar magnitude.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In order to overcome divergence of estimation with the same data, the proposed digital costing process adopts an integrated design of information system to design the process knowledge and costing system together. By employing and extending a widely used international standard, industry foundation classes, the system can provide an integrated process which can harvest information and knowledge of current quantity surveying practice of costing method and data. Knowledge of quantification is encoded from literatures, motivation case and standards. It can reduce the time consumption of current manual practice. The further development will represent the pricing process in a Bayesian Network based knowledge representation approach. The hybrid types of knowledge representation can produce a reliable estimation for construction project. In a practical term, the knowledge management of quantity surveying can improve the system of construction estimation. The theoretical significance of this study lies in the fact that its content and conclusion make it possible to develop an automatic estimation system based on hybrid knowledge representation approach.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

It is generally recognized that information about the runtime cost of computations can be useful for a variety of applications, including program transformation, granularity control during parallel execution, and query optimization in deductive databases. Most of the work to date on compile-time cost estimation of logic programs has focused on the estimation of upper bounds on costs. However, in many applications, such as parallel implementations on distributed-memory machines, one would prefer to work with lower bounds instead. The problem with estimating lower bounds is that in general, it is necessary to account for the possibility of failure of head unification, leading to a trivial lower bound of 0. In this paper, we show how, given type and mode information about procedures in a logic program, it is possible to (semi-automatically) derive nontrivial lower bounds on their computational costs. We also discuss the cost analysis for the special and frequent case of divide-and-conquer programs and show how —as a pragmatic short-term solution —it may be possible to obtain useful results simply by identifying and treating divide-and-conquer programs specially.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of this paper is the development of a building cost estimation model whose purpose is to quickly and precisely evaluate rebuilding costs for historic heritage buildings affected by catastrophic events. Specifically, this study will be applied to the monumental buildings owned by the Catholic Church that were affected by two earthquakes on May 11, 2011 in the town of Lorca. To estimate the initial total replacement cost new, calculation model will be applied which, on the one hand, will use two-dimensional metric exterior parameters and, on the other, three-dimensional interior cubic parameters. Based on the total of the analyzed buildings, and considering damage caused by the seismic event, the final reconstruction cost for the building units ruined by the earthquakes can be estimated. The proposed calculation model can also be applied to other emergency scenarios and situations for the quick estimation of construction costs necessary for rebuilding historic heritage buildings which have been affected by catastrophic events that deteriorate or ruin their structural or constructive configuration.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"Contract No. AT(49-1)-621."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Item 241-A.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research addresses the problem of cost estimation for product development in engineer-to-order (ETO) operations. An ETO operation starts the product development process with a product specification and ends with delivery of a rather complicated, highly customized product. ETO operations are practiced in various industries such as engineering tooling, factory plants, industrial boilers, pressure vessels, shipbuilding, bridges and buildings. ETO views each product as a delivery item in an industrial project and needs to make an accurate estimation of its development cost at the bidding and/or planning stage before any design or manufacturing activity starts. ^ Many ETO practitioners rely on an ad hoc approach to cost estimation, with use of past projects as reference, adapting them to the new requirements. This process is often carried out on a case-by-case basis and in a non-procedural fashion, thus limiting its applicability to other industry domains and transferability to other estimators. In addition to being time consuming, this approach usually does not lead to an accurate cost estimate, which varies from 30% to 50%. ^ This research proposes a generic cost modeling methodology for application in ETO operations across various industry domains. Using the proposed methodology, a cost estimator will be able to develop a cost estimation model for use in a chosen ETO industry in a more expeditious, systematic and accurate manner. ^ The development of the proposed methodology was carried out by following the meta-methodology as outlined by Thomann. Deploying the methodology, cost estimation models were created in two industry domains (building construction and the steel milling equipment manufacturing). The models are then applied to real cases; the cost estimates are significantly more accurate than the actual estimates, with mean absolute error rate of 17.3%. ^ This research fills an important need of quick and accurate cost estimation across various ETO industries. It differs from existing approaches to the problem in that a methodology is developed for use to quickly customize a cost estimation model for a chosen application domain. In addition to more accurate estimation, the major contributions are in its transferability to other users and applicability to different ETO operations. ^