987 resultados para building modeling
Resumo:
Even minor changes in user activity can bring about significant energy savings within built space. Many building performance assessment methods have been developed, however these often disregard the impact of user behavior (i.e. the social, cultural and organizational aspects of the building). Building users currently have limited means of determining how sustainable they are, in context of the specific building structure and/or when compared to other users performing similar activities, it is therefore easy for users to dismiss their energy use. To support sustainability, buildings must be able to monitor energy use, identify areas of potential change in the context of user activity and provide contextually relevant information to facilitate persuasion management. If the building is able to provide users with detailed information about how specific user activity that is wasteful, this should provide considerable motivation to implement positive change. This paper proposes using a dynamic and temporal semantic model, to populate information within a model of persuasion, to manage user change. By semantically mapping a building, and linking this to persuasion management we suggest that: i) building energy use can be monitored and analyzed over time; ii) persuasive management can be facilitated to move user activity towards sustainability.
Resumo:
In the last years the attentions on the energy efficiency on historical buildings grows, as different research project took place across Europe. The attention on combining, the need of the preservation of the buildings, their value and their characteristic, with the need of the reduction of energy consumption and the improvements of indoor comfort condition, stimulate the discussion of two points of view that are usually in contradiction, buildings engineer and Conservation Institution. The results are surprising because a common field is growing while remains the need of balancing the respective exigencies. From these experience results clear that many questions should be answered also from the building physicist regarding the correct assessment: on the energy consumption of this class of buildings, on the effectiveness of the measures that could be adopted, and much more. This thesis gives a contribution to answer to these questions developing a procedure to analyse the historic building. The procedure gives a guideline of the energy audit for the historical building considering the experimental activities to dial with the uncertainty of the estimation of the energy balance. It offers a procedure to simulate the energy balance of building with a validated dynamic model considering also a calibration procedure to increase the accuracy of the model. An approach of design of energy efficiency measures through an optimization that consider different aspect is also presented. All the process is applied to a real case study to give to the reader a practical understanding.
Resumo:
Dalla raffigurazione artistica fino alla modellazione digitale, passando per il disegno tecnico, la rappresentazione del progetto d’architettura ha conosciuto nel tempo evoluzioni significative che solo di recente hanno raggiunto l’apice nell’utilizzo di modelli cognitivi in grado di collezionare ed organizzare il patrimonio di informazioni che gravitano attorno all’intero processo edilizio. L’impiego sempre più diffuso dello strumento informatico, insieme al coordinamento delle specializzazioni nelle molte discipline coinvolte nel progetto, ha favorito negli ultimi anni l’adozione del Building Information Modeling un processo che permette di rivoluzionare il mondo delle costruzioni, coprendo molteplici aspetti del ciclo di vita per un manufatto edilizio. Questa Tesi intende presentare in maniera specifica le tappe che hanno consentito il formarsi del BIM. La migliore capacità di gestione, un linguaggio comune tra i progettisti, un’ottimizzazione di risorse e costi, unito ad un controllo convincente ed accurato delle fasi di lavoro, sono alcune delle potenzialità non ancora completamente espresse dal Building Information Modeling che è destinato a divenire una consapevolezza strategica nel bagaglio culturale del professionista contemporaneo.
Resumo:
Over the last ~20 years, soil spectral libraries storing near-infrared reflectance (NIR) spectra from diverse soil samples have been built for many places, since almost 10 years also for Tajikistan. Many calibration approaches have been reported and used for prediction from large and heterogeneous libraries, but most are hampered by the high diversity of the soils, where the mineral background is heavily influencing spectral features. In such cases, local learning strategies have the advantage of building locally adapted calibrations, which can deal better with nonlinearities. Therefore, it was our major aim to identify the most efficient approach to develop an accurate and stable locally weigthed calibration model using a spectral library compiled over the past years. Keywords: Tajikistan, Near-Infrared spectroscopy (NIRS), soil organic carbon, locally weighted regression, regional and local spectral library.
Resumo:
This paper presents an Ontology-Based multi-technology platform designed to avoid some issues of Building Automation Systems. The platform allows the integration of several building automation protocols, eases the development and implementation of different kinds of services and allows sharing information related to the infrastructure and facilities within a building. The system has been implemented and tested in the Energy Efficiency Research Facility at CeDInt-UPM.
Resumo:
Knowledge modeling tools are software tools that follow a modeling approach to help developers in building a knowledge-based system. The purpose of this article is to show the advantages of using this type of tools in the development of complex knowledge-based decision support systems. In order to do so, the article describes the development of a system called SAIDA in the domain of hydrology with the help of the KSM modeling tool. SAIDA operates on real-time receiving data recorded by sensors (rainfall, water levels, flows, etc.). It follows a multi-agent architecture to interpret the data, predict the future behavior and recommend control actions. The system includes an advanced knowledge based architecture with multiple symbolic representation. KSM was especially useful to design and implement the complex knowledge based architecture in an efficient way.
Resumo:
The opening of new windows on the façade is proposed as a refurbishment strategy in an existing building in Málaga to facilitate cross ventilation of dwellings. The building is a residential block of 140 public housing units for rent for people with low income in Málaga (Spain), property of the City Council. By modeling with Computational Fluid Dynamics (CFD), eleven configurations of openings are studied in two different areas of the main housing type of the building. The quantity of introduced/extracted air into/from the room and the generated airflow patterns are obtained. The modeling allows comparing the different openings configurations to determine the most appropriate ventilation option for every room.
Resumo:
The literature states that project duration is affected by various scope factors. Using 168 building projects carried out in Spain, this paper uses the multiple regression analysis to develop a forecast model that allows estimating project duration of new builds. The proposed model uses project type, gross floor area (GFA), the cost/GFA relationship and number of floors as predictor variables. The research identified the logarithmic form of construction speed as the most appropriate response variable. GFA has greater influence than cost on project duration but both factors are necessary to achieve a forecast model with the highest accuracy. We developed an analysis to verify the stability of forecasted values and showed how a model with high values of fit and accuracy may display an anomalous behavior in the forecasted values. The sensitivity of the proposed forecast model was also analyzed versus the variability of construction costs.
Resumo:
L’obiettivo della tesi è quello di fare una panoramica sulla strategia BIM e quindi sulla digitalizzazione del processo costruttivo. Grazie alla analisi di un caso di studio, altro obiettivo è quello di analizzare e valutare la metodologia BIM 4D/5D, ossia la gestione dei tempi e dei costi di realizzazione dell’opera. Nella prima fase si affronta il tema del BIM, con una analisi sull’evoluzione degli strumenti di elaborazione e rappresentazione digitale del progetto architettonico, su come questi strumenti si differenzino sia dal punto di vista operativo che concettuale rivoluzionando il flusso di lavoro odierno. Quindi, partendo da un’analisi che e ritrae l’estrema frammentazione del settore delle costruzioni, si va ad analizzare come il BIM aumenti e favorisca la collaborazione delle parti interessate, armonizzando l’intero processo costruttivo dell’opera. Si prosegue con l'esame della diffusione e del livello di maturità degli strumenti BIM, di come i privati e le amministrazioni pubbliche, a livello mondiale, stiano spingendo per favorire l’adozione della metodologia BIM. Inoltre si analizzano le dinamiche dell’interoperabilità, delle metodologie e protocolli di interscambio dati, che sono un elemento chiave per il successo del BIM per via dei numerosi strumenti, specializzati nelle varie discipline del settore edile. Nella terza parte, dedicata al Project Management di un caso di studio, si verifica la bontà delle metodologie teorizzate attraverso la realizzazione di un modello virtuale in Revit. Dal modello realizzato dal laureando sono estrapolate le informazioni necessarie alla gestione, e tramite il software STRVison CPM, si elaborano i principali documenti per la progettazione e gestione del cantiere: il CM, il CME, i tempi operativi, il cronoprogramma Gantt. Obbiettivo è constatare l’effettivo livello di maturità della strategia BIM 4D e 5D e la reale possibilità di un impiego capillare nel panorama italiano del settore delle costruzioni.
Resumo:
The application of systems thinking to designing, managing, and improving business processes has developed a new "holonic-based" process modeling methodology. The theoretical background and the methodology are described using examples taken from a large organization designing and manufacturing capital goods equipment operating within a complex and dynamic environment. A key point of differentiation attributed to this methodology is that it allows a set of models to be produced without taking a task breakdown approach but instead uses systems thinking and a construct known as the "holon" to build process descriptions as a system of systems (i.e., a holarchy). The process-oriented holonic modeling methodology has been used for total quality management and business process engineering exercises in different industrial sectors and builds models that connect the strategic vision of a company to its operational processes. Exercises have been conducted in response to environmental pressures to make operations align with strategic thinking as well as becoming increasingly agile and efficient. This unique methodology is best applied in environments of high complexity, low volume, and high variety, where repeated learning opportunities are few and far between (e.g., large development projects). © 2007 IEEE.
Resumo:
The object of this paper is presenting the University of Economics – Varna, using a 3D model with 3Ds MAX. Created in 1920, May 14, University of Economics - Varna is a cultural institution with a place and style of its own. With the emergence of the three-dimensional modeling we entered a new stage of the evolution of computer graphics. The main target is to preserve the historical vision, to demonstrate forward-thinking and using of future-oriented approaches.
Resumo:
The application of custom classification techniques and posterior probability modeling (PPM) using Worldview-2 multispectral imagery to archaeological field survey is presented in this paper. Research is focused on the identification of Neolithic felsite stone tool workshops in the North Mavine region of the Shetland Islands in Northern Scotland. Sample data from known workshops surveyed using differential GPS are used alongside known non-sites to train a linear discriminant analysis (LDA) classifier based on a combination of datasets including Worldview-2 bands, band difference ratios (BDR) and topographical derivatives. Principal components analysis is further used to test and reduce dimensionality caused by redundant datasets. Probability models were generated by LDA using principal components and tested with sites identified through geological field survey. Testing shows the prospective ability of this technique and significance between 0.05 and 0.01, and gain statistics between 0.90 and 0.94, higher than those obtained using maximum likelihood and random forest classifiers. Results suggest that this approach is best suited to relatively homogenous site types, and performs better with correlated data sources. Finally, by combining posterior probability models and least-cost analysis, a survey least-cost efficacy model is generated showing the utility of such approaches to archaeological field survey.
Resumo:
Los procesos de diseño y construcción tradicionales de la industria de la construcción que se han conservado inalterados durante años, han impedido vislumbrar los impactos positivos que se pueden dar al trabajar en conjunto con las tecnologías de información -- El miedo al cambio hace que las empresas del sector denominen “normal” a la fragmentación del proceso constructivo, y presupuesten desde el inicio de la obra atrasos por incompatibilidades en los diseños causados principalmente por la falta de comunicación y coordinación entre los diferentes participantes del proyecto -- La implementación de tecnologías de información busca no sólo ayudar como una herramienta a los diseños del proyecto, sino que también ofrece elementos para integrar a los participantes y contratistas del proyecto en un equipo de trabajo donde exista mayor interoperabilidad entre las áreas implicadas en el planteamiento, diseño y ejecución del proyecto, y se pueda disminuir de sobremanera la fragmentación que vuelve tan poco competitiva esta industria a nivel mundial -- En el presente trabajo de grado se realizó un estado del arte de la tecnología de información BIM con el fin de sintetizar las enormes cantidades de información disponibles y de posibilitar una mejor comprensión de este -- Con la teoría y los manuales estudiados a profundidad de los software que componen esta tecnología, se procedió a desarrollar un ejercicio exploratorio confrontando los conocimientos adquiridos teóricos con la parte práctica, parte en donde se pudieron vislumbrar las ventajas y desventajas al implementar este software en la industria de la construcción de nuestro país -- Finalmente se exponen los requerimientos y limitaciones que trae consigo la aplicación de esta tecnología a los proyectos de construcción